TVRO ENGINEERING REVIEW BOARD (ERB)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP88-00218R000300280035-6
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
June 4, 2012
Sequence Number: 
35
Case Number: 
Publication Date: 
December 30, 1986
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP88-00218R000300280035-6.pdf74.04 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280035-6 CAE S-I-~-'-~ SES-221-86 30 December 1986 MEMORANDUM FOR: Distribution THROUGH: FROM: SUBJECT: Chief, Engineering Support Group Chief, Headquarters Engineering Division TVRO Engineering Review Board (ERB) STAT STAT 1. To facilitate responsive maintenance support and exercise engineering control of system evolution, an Engineering Review Board (ERB) for the TVRO System has been established. The TVRO ERB will function under the auspices of the FBIS CCB to provide systematic investigation, evaluation, testing, implementation and documentation of CCB or ERB approved hardware and software maintenance and enhancement changes to the TVRO System baseline. 2. The ERB will convene as necessary to review open Discrepancy Reports (DRs), assign priorities and actionees to investigate and resolve such discrepancies, review engineering analysis of discrepancies, approve recommended corrective actions, and authorize implementation of corrective actions. The ERB will also determine whether a DR constitutes a Request for Change in the specified functionality of the TVRO System, and if so, will direct the preparation and review of an RFC. If approval of an RFC would constitute a change in the top-level specification baseline for the TVRO System, the ERB will forward the RFC to the CCB for approval prior to authorizing implementation. 3. C/HED, as Chairman of the TVRO ERB, will ensure the development and documentation of: the ERB procedures; a DR reporting and tracking system; procedures for test, implementation and backout of changes; and operational recovery procedures. C/HED will also ensure the availability of a TVRO support activity which will investigate DRs and develop approved corrective actions and be responsive to the operational TVRO System and the needs of the ERB. Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280035-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280035-6 SES-221-86 Page Two SUBJECT: TVRO Engineering Review Board (ERB) 4. Membership of the TVRO ERB shall include: C/HED Chairman B. Tapp, C/SEB/HED J. Bonner, SEB/HED D. Sheese, SB/HED J. Stratman, OPS/MOD Manager, GE/SES will assign Secretariat support to the ERB and will also provide technical assistance as required. STAT Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280035-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280035-6 SUBJECT: TVRO Engineering Review Board (ERB) DS&T/FBIS/ESG/ADD/SES:WStanbridge:tlr/527-8600 (30DEC86) Distribution: Original - C/ESG 1 - C/HED 1 - C/ADD 1 - B. Pratt, COTR 1 - C/FED 1 - C/AG 1 - C/PROD 1 - C/OPS 1 - C/MOD 1 - GE/SES Staff 1 - GE/SES Chrono 1 - HED Chrono Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280035-6