OPERATIONAL ERB MEETING REPORT

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP88-00218R000300280002-2
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
14
Document Creation Date: 
December 22, 2016
Document Release Date: 
June 4, 2012
Sequence Number: 
2
Case Number: 
Publication Date: 
February 19, 1988
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP88-00218R000300280002-2.pdf394.89 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 SES-032-88 19 February 1988 MEMORANDUM FOR: Distribution THROUGH: Chief, Headquarters Engineering Division, ESG FROM: Jennifer C. Thomas System Engineering Support, GE SUBJECT: Operational ERB Meeting Report 1. The Operational Engineering Review Board was held on 18 February 1988 at 1330. See Attachment A for a list of attendees. See Attachment B for the Agenda. 2. Three new DR's were discussed. See Attachment C for a description of these DR's. One Critical DR was also discussed and is part of the new DR's. 3. The O-ERB reviewed five In Progress DR's. See Attachment D for a description of those DR's. The status updates from the ERB are also incorporated. 4. One new RFC was discussed. One Walk-on RFC was also discussed. See Attachment E for a description of these RFC's. See Attachment F for the current status of the In Progress DR's. 5. One New BR and one Walk-on BR were discussed. See Attachment G for a description of these RFC's. 7. The next Operational ERB is scheduled for Thursday, 25 February 1988 at 1330. Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 SUBJECT: Operational ERB Meeting Report FBIS/ESG/ADD/SES:J.C.Thomas:cg/733-5937(19FEB88) Distribution: 1 - C/ESG 1 - C/HED 1 - CMO/HED 1 - C/FED 1 - C/PROD 1 - C/ADD ADD Staff 1 - C/AFSB 1 - C/OPS 1 - C/DRD/OPS 1 - C/WSS/DRD/OPS 1 - C/ME/DRD/OPS 1 - SAM/PROD 1 - SA/OPS 1 - W. Pratt, COTR 1 - LEC, Plainfield 1 - LEC, D. Higgins 1 - LEC, E. Brewer 1 - LEC, Reston 1 - GE/SES Staff Original - GE/SES Chrono Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 B. H. J. J. D. A. S. D. P. B. Hunter J. Wisor A. Sellers Stanbridge Tate Cherry Thomas Bernholz Frost Shelton Higgins Viveiros STAT Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 ATTACHMENT B Discrepancy Report Agenda 17 February 1988 Critical Discrepancy Reports DR NO Status Priority Originator Discrepancy Report Agenda 17 February 1988 New Discrepancy Reports Priority Originator HU-DR -E-003-88 New C HU-DR -E-004-88 New B Discrepancy Report Agenda H. Tata/WSS R. Lehman/DC/WSS 17 February 1988 Discrepancy Reports in Progress HU-DR -E-004-87 T/I Priority C Actionee A. Fields/ESG HU-DR -E-025-87 T/I C D. Higgins/LEC HU-DR -E-107-87 Open B ATEX CO-DR -E-001-88 T/I B LEC CO-DR -E-002-88 Open B E. Brewer/LEC Request for Change Agenda New Requests for Changes RFC NO Status Priority 17 February 1988 Originator A. Fields/ESG Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 YBIS? ATTACHMENT C Discrepancy Report Problem Identification: Incoming Validation Terminated DR Number: CO-DR -E-011-88 Submit Date: 02-11-1988 Category: I Problem Date: 02-11-1988 Problem Time: 0825ZGMT Priority: A System: HUCS Subsystem: VAX Hardware Configuration: Model #: Serial #: Software Configuration: Application: PVALIN.PAS Version: 1.18 Database: Procedure: Affected Documents: Title: None Scenario: Location: Reston, VA Prior Operations: Originator: C. Jones/HED Phone: (703)733- Approval for Submittal: Date: Problem Description: Incoming validation terminated due to a line with only a null character when the BFN was expected. Analysis: Incoming validation terminated on msg 41089. The line before the BFN Line contained only a null char. which caused an out of range condition. A check should be performed to verify the length of the expected BFN line to prevent the error from occuring. Corrective Action: Added code in BFN_ VALIDATION procedure to verify the BFN line length. If the length is less than two, the line is highlighted and spilled to the operator for correction as BFN line missing.Installed new version 02-11-88 150OZ References/Documentation: Impact: Related Problems: Action Completed By: E. Brewer/LEC Approval: Status: Closed Date Due: 02-18-1988 Date Closed: 02-18-1988 Status Msg: No doc changes. Recommend closure. Actionee: Verification provided. E. Brewer/LEC Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 VBIS . Discrepancy Report Problem Identification: C/WSSLogon OA-- Three Programmed Keys Do Not Work DR Number: HU-DR -E-003-88 Submit Date: Problem Date: 02-11-1988 Problem Time: 02-16-1988 Category: Priority: C System: Subsystem: ATEX Hardware Configuration: Model #: Serial #: Software Configuration: Application: Version: Database: Procedure: Affected Documents: Title: Scenario: Location: Prior Operations: Originator: H. Tate/WSS Phone: Approval for Submittal: Date: Problem Description: Programmed keys READ AD, READ OP, and C/WS under the OA logon elicit the message - NO PROGRAM SAVED. Analysis: Corrective Action: )A logon did not have OA.P33,OA.P35, and OA.P65, READ AD, READ OP, and C/WS respectively. I have copied these over for him and they appear to be functioning correctly. References/Documentation: ATEX System Manager Manual p. 1-32. Impact: Related Problems: Action Completed By: Approval: Status: Closed Date Due: 02-18-1988 Date Closed: 02-18-1988 Status Msg: This is a resubmission. Actionee: B. Baker/HED Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 'FBIS Discrepancy Report Problem Identification: Wire Transmitted Wrong Items DR Number: HU-DR -E-004-88 Submit Date: 02-16-1988 Category: Problem Date: 02-16-1988 Problem Time: 1625 Priority: B System: HUCS Subsystem: ATEX Hardware Configuration: Model #: Serial #: Software Configuration: Database: Procedure: Affected Documents: Title: Application: Version: Scenario: Location: Prior Operations: Originator: R. Lehman/DC/WSS Phone: (703)733-6002 Approval for Submittal: H. Tate/C/WSS Date: 02-16-1988 Problem Description: Wire transmitted 46-49; instead of current items, system transmitted 46-49 of 15 Feb instead of transmitting items of 16 Feb. Analysis: Corrective Action: Response to docing on the VAX will completely remove this problem. For interim fix, see HU-BR-E-003-88. References/Documentation: Impact: Related Problems: Action Completed By: Approval: Status: Open Date Due: 03-03-1988 Date Closed: Status Msg: ---------- Actionee: B. Baker/HED Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 F'BIS DR Status Report ATTACHMENT D 18 February 1988 DR NO PRIORITY TITLE DATE LOGO DUE DATE ORIGINATOR ACTIONEE STATUS CO-DR -E-001-88 Line Condition 01-06-1988 N. Brodeur/AFBIS T/I B Occurs Which 03-03-1988 E. Brewer/LEC Work in progress. CO-DR-E-007-88 closed Inhibits Msgs. From to this DR. Verification provided. CO-DR -E-002-88 Garbled London 01-11-1988 G. Gutendorf/HED Closed B Message Hung PVALIN 02-18-1988 E. Brewer/LEC No doc. changes. Verification provided. HU-DR -E-004-87 Add Line To 07-29-1987 Ops Wire Service Recommend closure. T/I C Selective Directory 02-25-1988 A. Fields/ESG Assigned to Alison to investigate. Menu. Report at O-ERB 02-25-88 HU-DR -E-025-87 Bulletin/Note Field 08-06-1987 C. Hersh, DC/WSS Closed C Lines Are Not 02-18-1988 D. Higgins/LEC Closed to HU-RFC-E-006-87. Discrete. HU-DR -E-107-87 Imbalance Between 09-25-1987 I Open STAT B Mirrored Systems 02-25-1988 ATEX DR discussed at ERB 2-18. Waiting response from ATEX. Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 FBIS' Request for Change Title: Read-In For DRD Date Logged: 02-16-1988 Priority: B ?DRD STAT Originator: A. Fields/ESG Telephone Number: (703) 733-5851 Affected Documents: Title: ATEX Number: Need for Change: Users on Systems 1-4 need to be able to read-in (i.e., have access to ADMIN and SERVICE message and various Wire queues) without causing heavy system overload and slow response time. Board Comments: HU-DR-E-095-87, HU-MR-E-014-87, HU-RFC-E-020-87 and HU-RFC-E-026-87 are all closed into this RFC. HU-DR-E-025-87 closed to this DR on 2/28 Status: Open Due Date: 03-03-1988 Actionee: A. Fields/ESG Status Msg: Scheduled as part of ESP II work. Date Closed: Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 FBIS Request for Change Title: Upgrade To The ATEX System Affected Documents: Title: Number: Need for Change: See Attached. Description of Change: See Attached. Status: Approval Due Date: 02-18-1988 Actionee: M. Tanigawa/ADD Status Msg: Referred to the CCB for final approval. Has ERB approval and support. Date Closed: Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 Attachment for HU-RFC-E-008-88 (Upgrade to the ATEX System) NEED FOR CHANGE: The Atex system does not provide adequate performance and fully satisfy its users - the Wire Service, Daily Reports, and JPRS. The results of the ATEX System performance studies point to the lack of sufficient memory as the single most important problem for all three categories of performance problems that were analyzed. Following memory the remaining factors which related to the Wire Service function were I/O services, including the Multi-Processor Bus and access to the System Disk, the availability of CPU cycles, and the quantity of incoming wire message traffic. DESCRIPTION OF CHANGE: The studies suggest that ESP-2 is a relevant improvement, providing a dramatic improvement in memory, more flexible allocation of memory, and better memory utilization strategies. The availability of much improved cache memory in ESP-2 suggests that it will provide some relief to the I/O bottlenecks. Purchasing ESP-2, for all six ATEX Systems, should help clear up a major portion of the problem, since memory is so strongly implicated, and since ESP-2 provides a major increase in memory. It is recommended that the optional upgrade to an additional 4 MB also be procured. Software improvements bundled in ESP-2 should improve the efficiency of the Multi-Processor Bus, and reduce its negative impact on performance. The software associated with ESP-2 provides better handling of errors associated with MPB traffic, which in turn reduces the number of time-outs. The problem of CPU cycle availability can be partly alleviated by upgrading the current 15 MHz DEC J-11 processors to 18 MHz J-11 processors for all six Atex systems. The need for additional CPU cycles suggest the value in upgrading to the faster J-11 chip. The analysis does not point up as much as the daily statistics do, that the system disks on Atex systems 1, 2, 3, and 4 are badly overworked. Although the improved approach to caching in ESP-2 may provide a 40 percent improvement, the problem of disk accesses is so severe that additional relief will be re- quired. It is recommended that thought be given as to how the system can be reorganized in the new ESP-2 hardware architecture to further reduce the number of disk and Multi-Processor Bus accesses. Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 FBIS ATTACHMENT F RFC Status Report 18 February 1988 RFC NO TITLE PRIORITY HU-RFC-E-015-87 Additional Disk DATE LOGO DUE DATE 08-04-1987 ORIGINATOR ACTIONEE W. Pratt Open C Drives For Atex And 03-17-1988 J. Wisor/HED Proposal for new disk drives has been Xyvision. issued. Deadline for proposal os HU-RFC-E-029-87 DOCBUILD FOR 10-28-1987 A. Usaty Open C CRS-COMPILED REPORTS 03-17-1988 A. Fields/ESG Kathy working with PROD on generating alternatives. HU-RFC-E-003-88 Marking UNCLAS Line 01-29-1988 I CESG Open STAT B On VAX 02-25-1988 Higgins/LEC/Brewer Delores has completed ATEX investigation. Brewer to report on VAX Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 FBIS ATTACHMENT G Build Request Title: Wire Transmitted Wrong Items BR No.: HU-BR-E-003-88 Contract No.: Date Logged: 17 Feb 88 Priority: B Originator: Fields Telephone Number: Type Change: Software Hardware Facility Procedure Documentation System/Subsystem Affected: Atex Component Affected: System Impact: Affected Documents: Title: SCHED 6 in CUSTOM-SYS on Atex Number: Description of Change: Procedures for cleaning out "SPIKE-SYS" will be modified to take place at 0000 GMT rather than 2100 GMT. Cleaning out HOLD1-COM will also be put on a TSCHED as well. Changes made to ATEX system to resolve HU-DR-E-004-88. Installation Procedures: TSCHED procedures changed by system manager by running BLD SHD. Verification/Test Procedures: System manager will verify at 0000 GMT by checking queue to verify purging complete. Scheduled Installation Date: 17 Feb 88 C/AFSB: Result: Disapproved Acceptance: ERB Chairman Approval: ll,,~ Date: 17 February 1988 Board Comments: Proposed solution was not appropriate to the problem and was not implemented. STATUS: CLOSED ST MSG: ACTIONEE: B. Baker/HED Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2 FBIS Build Request BR No.: HU-BR-004-88 Contract No.: Date Logged: 2/17/88 Priority: B Originator: A. Fields Telephone Number: Type Change: Software Hardware Facility Procedure Documentation System/Subsystem Affected: Atex Component Affected: System Impact: Installation: None (Activation: unknown-not scheduled now) Affected Documents: N/A Title: Number: Description of Change: The installation of the Reader Utililty on all six Atex systems. Utility will provide system performance statistics. 1455 - installed and turned off. 1510 - because utility interfered with XYvision links. Installation Procedures: Standard Atex procedures performed by Atex engineer Hayes. Verification/Test Procedures: Standard Atex procedures performed by Atex engineer Hayes. Scheduled Installation Date: 2/17/88 C/AFSB: Result: Disapproved Acceptance: 18 February 1988 ERB Chairman Approval: Date: Board Comments: Installed 1455 and turned off 1510 because utility interferred with XYvision links. Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280002-2