HEADQUARTERS OPERATIONS, MAINTENANCE AND ENGINEERING DIVISION, OL WEEKLY REPORT FOR PERIOD ENDING 15 AUGUST 1984
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP87-00352R000100200022-2
Release Decision:
RIPPUB
Original Classification:
U
Document Page Count:
3
Document Creation Date:
December 22, 2016
Document Release Date:
May 4, 2009
Sequence Number:
22
Case Number:
Publication Date:
August 15, 1984
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP87-00352R000100200022-2.pdf | 139.93 KB |
Body:
Approved For Release 2009/05/04: CIA-RDP87-00352R000100200022-2
-s"rAC IRATi!E INIERNAI USE 614y
HEADQUARTERS OPERATIONS, MAINTENANCE
AND ENGINEERING DIVISION, OL
WEEKLY REPORT FOR PERIOD ENDING 15 AUGUST 1984
I. Progress Report on Tasks Assigned by DCI/DDCI:
No tasks assigned during this reporting period.
II. Items/Events of Major Interest:
a. Hydraulic Barricades: The second barricade was in-
stalled at the Route 1 Sntrance to the Headquarters Compound
on Friday, 10 August 1984. Installation of the third barricade
will begin at this entrance as soon as weather permits.
b. VEPCO Substation Failure: The VEPCO transformer that
failed on August 1984 was founT-to be too badly damaged to be
repaired locally. The unit will be shipped to the factory for
repairs, and a replacement unit will be installed in its
place. It has not been determined how much time will be
required to effect the replacement. Electrical service to the
Headquarters Compound has not been interrupted due to this
situation.
c. Street Lighting: All weak or bad splices on Circuits
3 and 4 have been repaired or replaced. All street lighting
circuits were turned over to the New Building Project Office on
1 August 1984. A bushing for Circuit 4's transformer is on
order, and, upop receipt, it will be installed by the
Engineering and Construction Branch's contractor. The work on
the transformer will not interfere with Hyman's construction.
d. Pedestrian Tunnel Repairs:, The A-E, Dewberry and
Davis, acquire plans of the existing installation from GSA
during the week of 23 July 1984. The A-E determined that
sufficient site data was available from recent surveys to
proceed with the tunnel assessment report. Their evaluation
conclusions were received on 13 August 1984. A meeting with
the A-E was held on 15 August 1984 to review their recom-
mendations and to select a course of action. Construction is
scheduled to begin in early October and to be completed by mid-
November 1984.
AOMINI$TRATIVE--INTERKAI USE ONLY
Approved For Release 2009/05/04: CIA-RDP87-00352R000100200022-2
Approved For Release 2009/05/04: CIA-RDP87-00352R000100200022-2
~`B~s1 !;t,~r-},s - 11,111JIfiAC iisE ONLY
e. APARS Feeder Modifications: Electric Service Company
completed the feeder modification to the APARS remote stations
on the second and fifth floors of Headquarters Building. A new
electrical feeder was installed from-the UPS in the basement of
the building to the fifth floor exclusively to support the
APARS remote stations. This modification enhances the message
distribution system of the building.
f. P&P Laserite, Gym HVAC, and ODP Renovations: As
reported, a construction contract for the instal ation of the
Laserite Printer in the Printing and Photography Building, the
computer interfacing between Rooms GC03 and GE04, and the air
handler installation in the Gym was awarded to BCM Corpo-
ration. The preconstruction meeting took place on 15 August,
1984 at 1000 hours. The contractor plans to start on 20 August
and to expedite the P&P Building work to the maximum extent
feasible.
h. Renovations - Head uarters Cafeteria:
.Representatives of four of the five contractors bidding on the
cafeteria renovations were taken on a walk through of the
cafeteria by the contracting officer and two representatives of
the Architectural Design Staff (ADS), OL/HOME, on Monday,
13 August 1984.
i. Drawings for Wang Alliance Installation: Drawings
for the installation of the Wang Alliance system in Rooms 3E14
and 3E24, Headquarters Building, for OL/HOME were completed on
Tuesday, 14 August 1984.
j. Renovations - Headquarters Buildin : Final plans for
renovations in Rooms 2D04-08 for the Offices of Communications
and Data Processing have been approved. Construction plans
were completed and issued to the Operations and Maintenance
Branch (O$MB), OL/HOME, on 13 August 1984.
Construction plans for major renovations in Room
1H-39 and relocation of the subcorridor for the Office of
Central Reference, DDI, are near completion. ADS is submitting
plans to `Ef,CB for.review.
AVl.!!0'TR ^ TI'!t - INTERNAL USE OIIIY
Approved For Release 2009/05/04: CIA-RDP87-00352R000100200022-2
Approved For Release 2009/05/04: CIA-RDP87-00352R000100200022-2
AOY.IN!STRATIYE -- INTERNAL USE ONLY
New construction on the 4E Corridor f-or-the return of
the'Office of Soviet Analysis (SOYA), DDI, to Headquarters is
65 percent complete. The contractor has worked the last two
Saturdays and plans to work the next two Saturdays and
Sundays. All work is expected to be completed by 29 August
1984.
The contractor is continuing; demolition as space for
SOVA becomes vacant in the SE Corridor. Final drawings and
specifications for renovations were delivered to the contractor
on 31 July 1984 for a cost proposal, which is due on 15 August
1984.
Renovations in Rooms 1E4810-4822 for the Office of
Central Reference, DDI, and in Room 2D45 for the Evaluation
Planning Staff, DO, were completed last week.,
The GSA Electric Shop has completed 40 percent of the
work on the relocation of the critical power in Room GG10 for
the Career Management Staff, DO. This work resulted from
changing the entrance to the room.
k. Buildin : The heavy rains have caused
flooding o e underground parking garage in Building
and resulted in water damage to several automobiles owned by
.Agency employees.
1. Transportation: Limousine service was provided to
the Near East Division from 7 through 9 August 1984.
III. Significant Events Anticipated During the Coming Week:
None.
Chief
eadquarters Operations, Maintenance
and Engineering Division, OL
ADMIk(STR4TIVE---IYTER~'a(, USE O!Ly