LOGISTICS SERVICES DIVISION WEEKLY REPORT PERIOD ENDING 9 NOVEMBER 1983
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP87-00352R000100110022-2
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
3
Document Creation Date:
December 22, 2016
Document Release Date:
August 11, 2009
Sequence Number:
22
Case Number:
Publication Date:
November 9, 1983
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP87-00352R000100110022-2.pdf | 116.14 KB |
Body:
Approved For Release 2009/08/11 :CIA-RDP87-003528000100110022-2
LOGISTICS SERVICES DIVISION
WEEKLY REPORT
PERIOD ENDING 9 NOVEMBER 1983
I. Progress Report on Tasks Assigned by the DCI/DDCI:
No items this reporting period.
II. Items/Events of Major Interest:
a. DCI Suite Redecoration: New draperies were installed
in the DCI o ice an secretarial area on 3 November 1983.
This completes all redecoration proposals for this suite.
b. Trans ortation: Special transportation was provided
for three days for t e Latin America Division and for two days
for the Office of Training and Education ending on Sunday,
6 November 1983.
On 2 November 1983, 90 requests for transportation
were received. This was the largest number of requests for
transportation in a single day that anyone in the Motor Pool
Branch could remember.
c. Drawin~_s~: The design proposal was approved for the
relocation o~-t~Administrative Office, DCI, to Room 7D19
Headquarters Building. Working drawings are 85 percent
complete.
Construction drawings for the move of the New
Building Planning Office to Rooms 3E36/3E40, Headquarters
Building, were completed and issued to the Space Maintenance
and Facilities Branch, Logistics Services Division, OL on
7 November 1983. This is part of the
backfill.
d. Conversion of Area to VTR: A representative of the
Architectura esign to ogistics Services Branch, OL, met
with a representative of the East Asia Division, DDO, to
discuss their requirements for conversion of Room SC19,
Headquarters Building, to a VTR and the installation of Wang
terminals.
Approved For Release 2009/08/11 :CIA-RDP87-003528000100110022-2
Approved For Release 2009/08/11 :CIA-RDP87-003528000100110022-2
e. Blower for the Hammermill: The Headquarters
Engineering Branc , Real Estate an Construction Division, OL,
has advised the Building Services Branch, that a blower for the
Hammermill was shipped during the week of 7 November and is due
to arrive at Headquarters Building by 15 November.
f. Furniture Deliveries: Last week 119 pieces of
furniture were e were to ysons Corner and 47 pieces of
metal furniture were picked up from Roosevelt Building and were
placed in Lot Storage.
g. Relocation of Workstations: During the past week, 12
workstations were re ocate or t e East Asia Division, 18 for
the Office of Global Issues, and 53 for the Office of
Development and Engineering.
h. Executive Dining Room_Survey: On 8 November 1983, an
Executive Dining Room Survey or fiscal Year 1983 was mailed to
members. The survey will assist the EDR staff in upgrading the
facilities, operations, and guest services. The completed
forms should be returned by 1 December 1983, and they will be
reviewed at that time.
i. Renovations at Headquarters Building: On 7 November
1983 the Carpenter op starte t e relocation and extension of
the mail sorting counter in Room 6B4403 for the Central Cover
Staff, DDO. To minimize disruption to the office, this will be
the only work done until the last week of November because the
two new telephone consoles will not be ready for installation
until early December.
Painting in Room 5D55 for the Office of Data
Processing, DDA, was completed on Tuesday, 8 November.
Electrical work in this area is to be scheduled.
The installation of new double duplex outlets and
modification of existing outlets in Room GA20 was completed on
an overtime basis on 5 and 6 November by the Electric Shop.
The purpose of this work was to allow for installation of word
processing equipment for the Information Management Staff, DDO.
The replacement of sprinkler heads and connecting of
the fire alarm in Rooms GJ56 and GH4008 has been completed.
III. Significant Events Anticipated During the Coming Week:
a. Renovations to Foreign Visitors Lounge: The
Carpenter Shop is scheduled to start work during the week of
Approved For Release 2009/08/11 :CIA-RDP87-003528000100110022-2
Approved For Release 2009/08/11 :CIA-RDP87-003528000100110022-2
STAT
14 November 1983 in Room 6D57, the Foreign Visitors Lounge, with
the removal of four feet of masonry wall for a door and the
installation of a new wall. Work in this area will be
disrupted for some time due to the extensive plumbing and
electrical work.
b. Paintin of the North Parkin Lot: Weather
permitting, t e painting contractor wi be working on
Friday, Saturday, and Sunday, 11, 12 and 13 November,
restriping the parking areas of the North Parking Lot.
c. Painting of First Floor Corridors - Head quarters
Building: painting contractor wit start painting in the
Chief
Logistics Services Division