LOGISTICS SERVICES DIVISION WEEKLY REPORT PERIOD ENDING 26 OCTOBER 1983

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP87-00352R000100100003-4
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
August 6, 2009
Sequence Number: 
3
Case Number: 
Publication Date: 
October 26, 1983
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP87-00352R000100100003-4.pdf105.19 KB
Body: 
STAT Approved For Release 2009/08/06: CIA-RDP87-00352R000100100003-4 LOGISTICS SERVICES DIVISION WEEKLY REPORT PERIOD ENDING 26 OCTOBER 1983 I. Progress Report on Tasks Assigned by the DCI/DDCI: No items this reporting period. II. Items/Events of Major Interest: a. Drawings: Preliminary design layouts were submitted to the Administrative Office, DCI, for their new office space in Room STAT 7D19, Headquarters Building. STAT STAT Design drawings for Rooms 4G29-43, Headquarters Building, were issued to the Office of East Asian Analysis, DDI, for approval. Revisions were made to drawings for the relocation of three SAFE terminal workstations and the installation of five additional workstations for the Office of Central Reference (OCR), DDI. The drawings were submitted to the Space Maintenance and Facilities Branch (SM&FB), LSD/OL. The preliminary design for the renovation of the Courier Lounge, Room GB1911, Headquarters Building, is 90 percent complete. The Architectural Design Staff (ADS), LSD/OL, is awaiting design approval. b. Meetings Attended b ADS: An ADS representative met with Intelligence Community Staff personnel to survey their registry Cosntruction drawings are 95 percent complete for the VTR conversion of Room GA09 and modifications to Room GA13, Head- quarters Building, for installation of a video display setup. met to discuss the feasibility of relocating the watch office. It was determined that the intersection of the B and C corridors would be the best location for a view window from the corridor. A scope of work has been prepared for the A$E firm Kidde. changes necessary to improve the o ice layout and restrict access to the registry area. Also discussed were possible changes to the guard station of the Federal Protective Service. Representatives of ADS and OCR met to conduct a survey of Rooms 1E4810/16/22, Headquarters Building. The design proposal for this work is currently being reviewed by OCR. Representatives of ADS and the Office of Communications and to determine Approved For Release 2009/08/06: CIA-RDP87-00352R000100100003-4 Approved For Release 2009/08/06: CIA-RDP87-00352R000100100003-4 d. Doors for the Handicapped: Tri State Doors, Inc., will begin installing doors for the handicapped at the Northeast en- trance of the Headquarters Building on Monday, 31 October 1983. The work will be done between 0915 and 1600 hours and is expected to be completed within 5 to 6 working days. e. Surve of Sidewalk and Parking Area, Headquarters Garage: SM$FB met with the Assistant Building Manager, McLean Field Office, GSA, and surveyed the sidewalk and parking area in front of the Headquarters Garage. This area is in need of repair and resurfacing due to repairs to broken water and steam lines, which resulted in subsequent patching and settling. The Assistant Buildings Manager stated that due to the settling problem, he would call in a GSA engineer to address the problem. He was re- quested to follow up quickly so that corrective measures could be taken before the onset of cold weather. f. Caulking of Windows and Expansion Joints: A preconstruc- tion meeting regarding caulking the windows an expansion joints of the Headquarters Building was held on 21 October 1983. Repre- sentatives from the contractor (Arlandria), GSA, the Office of Security, and SM$FB were present. The contractor hopes to start positioning equipment on 26 October 1983, and the work is sched- uled for completion in 180 days. Approximately 6 weeks of work may be finished before the end of the calendar year, and the balance will be done in March/April of 1984. SM$FB responsibilities will be, primarily, providing escorts, parking equipment vehicles, and notifying offices re- garding work schedules. All work is to be performed on the exterior of the building. The approximate dollar value of the III. Significant Events Anticipated During the Coming Week: None this reporting period. Chief Logistics Services Division STAT Approved For Release 2009/08/06: CIA-RDP87-00352R000100100003-4