FOLLOWUP ON 'STATEMENT OF REQUIREMENTS TO SUPPORT CAMS'
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP86-01019R000200030011-9
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
2
Document Creation Date:
November 17, 2016
Document Release Date:
June 8, 2000
Sequence Number:
11
Case Number:
Publication Date:
March 9, 1978
Content Type:
MFR
File:
Attachment | Size |
---|---|
![]() | 92.47 KB |
Body:
Approved For Release 2OOO/08/10 : CIA-RDP86-01 O19ROOO2OOO3OO11-9
9 MAR 1978
STA
INTL
SUBJECT: Pollowup on "Statement of Requirements
to Support CANTS"
1 'March 1978, the undersigned contacted
Deputy Director for Processing, to
I status of the subject paper. The original
paper was formulated it of 1977 but was held
back for redra rr , Director of Data
Processing. said t at we would not likely
see the paper very soon. It was then agreed than. RBCD
would not proceed until the redraft of the paper was
available.
STATINTL
STA
INTL
STATINTL
2. While on the subject of CAMS, the timing of
interim CANIS was discussed The following sequence of
events was provided by
a. ODP procures and installs a new
rNI processor in GC03.
b. ODP relocates a 158 from GC03
to GC47 for interim upgrade (needs no
400 Hz power or chilled water).
STATINTL
c. ODP relocates a 360/65 from
GC47 to a location outside of Headquarters.
Further!, stated that he could never see more
than three computers in GC47 and that the earlier;t a
new riach.ine could be made available that might require
400 Hz power would be the fall of this year.
STATINTL
Uflie:L
Headquarters Engineering Branch,
I OL
Distribution:
Sri;. OL/RECD/IIEJ, Official
I - OL/RECD STATINTL
Approveec Rb/R,O6~i1MO :CIA-RDP86-010198000200030011-9
OL/LZECDD/HfB sbt/7543 (9 Mar 78)
1 40
X\ 1_9
Approved For Release.2000/08/10: CIA-RDP86-01019W02Q(% R E C U
DC ~,L
Ex
SA
C/REB
Bt0
ODP-028-78 (:!o;8
6 January 1978
CAN 5
MEMORANDUM FOR: Chief, Real Estate and Construction Divisi
STATINTL Office of Logistics . T-0
FROM 6 i dp.
Chief, A ministrative Staff, ODP
SUBJECT Space Projection Fiscal Year 1980
REFERENCE Your Memo, Same Subject, dtd 22 December 1977
STATINTL
We have a requirement for additional space and parking
at i Building to accommodate the buildup in staffing the
STATINTL CAMS project. It is anticipated that by FY-80 we will need
space for 50 people and 20 plus CRT's. Our parking require-
ment at will increase proportionately. Presently 3700
STATINTLsquare tee (1600 and 2100 at Headquarters) is dedi-
cated to CAMS. By FY-80 CAMS must be consolidated
2. ODP has previously indicated the priority need to
relocate our Special Project Staff, which presently occupies
7000 square feet at Ames Building, into appropriate space in
the Headquarters Building. If this relocation is approved
by FY-80 we could relinquish the 7000 square feet at Ames.
STATINTL
STATINTL
Approved For Release 2000/08/10 : CIA-RDP86-01019ROOO2 03 01, -9
8~ X3101