PROJECT CAMS AND SPECIAL CENTER UPGRADE
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP86-01019R000200030008-3
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
3
Document Creation Date:
November 17, 2016
Document Release Date:
June 8, 2000
Sequence Number:
8
Case Number:
Publication Date:
June 20, 1978
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 94.95 KB |
Body:
Approved For Release 2000/08/10 : CIA-RDP86-0101 8000200030008-3
ODP 8-0797
2 0 JUN 1978
MEMORANDUM FOR: Director of Logistics
STATINTL
Director of Data Processing
SUBJECT Project CAMS and Special Center Upgrade
REFERENCE Your Memo, dtd 3'April 1978,,(OL 8-1298),
Subject:. Project CAMS
Because of the lack of 6,500 square feet of suitable
space in.the Headquarters Building for a dedicated CAMS Computer
Center and serious operational problems associated with locating
it outside of the Headquarters Building we have concluded that
the GC-47 Special Center should be configured to support both
CAMS and the DDO requirements on a permanent continuing basis.
2.. To accomplish this, we would have to utilize all of
the GC-47 floor space currently devoted to offices. This
space could only be released for this purpose if we were pro-
vided 1,000 square feet of office space in the vicinity of
GC-47 prior to March 1979.
3. in addition to space, we also require additional
utility support for GC-47 to ultimately support a center with
three large scale (IBM 3033"or Amdahl V6 type) systems.
Attachment A is a schedule of events affecting the Special
Center from the present through the. installation of the third
large-scale system in FY-81/82 and the necessary power require-
ments. A 400.Hz UPS should also be installed to accommodate
these three systems.
Approved For Release 2000/08/10 : CIA-RDP86-01019R000200030008-3
Approved For Release 2000/08/10 : CIA-RDP86-0101--R000200030008-3
4. We understand that additional air handlers are
presently being installed to. provide additional air condition-
ing for the Special Center. Please ensure that sufficient
cooling capacity. is provided to. handle the heat generated by
the new equipment. The new large-scale systems may require
chilled water. If so, chilled water stubs and valves will
be needed.
5. The use of the Special Center for CAMS will result
in substantial savings in space requirements, manpower and
operational support costs..
ue.~t o~w- 447
- .~u~.c .cam'
STATINTL
Att: a/s
cc: C/RECD/OL
C/AD/ODP
C/ED/ODP
C/MS/ODP
Approved For Release 2000/08/10 : CIA-RDP86-01019R000200030008-3
Approved For Release 2000/08/10 : CIA-RDP86-01019R000200030008-3
Attachment A
GC-47 Power Requirements
(Vendor Specs in KVA)
Date
Event
60HZ
415HZ
April 1978
Install Comten 6
368.2
N/A
May 1978
Remove 2702
366.4
N/A
Add Interim 3350
384.6
N/A
Remove 3330 Mod-II
356.2
N/A
June 1978
AP Red/Blue
368.6
N/A
July 1978
Add Memory
373.8
N/A
August 1978
Install 158-1 and 2314
409.6
N/A
September 1978
Remove 65-1 and Drums
370.2
N/A
Install Interim 3350's
385.6
N/A
October 1978
Install 3350 RFP (8 pk)
399.4
N/A
Remove Interim 3350 (8 pk)
392.2
N/A
Install 3350 RFP (8 pk)
399.4
N/A
Remove Interim 3350 (CNTL/8pk)
385.6
N/A
Install 3350 RFP (8 pk)
399.4
N/A
Remove Interim 3350
383.0
N/A
Install 3350 RFP (8 pk)
391.2
N/A
November 1978
Install CAMS cntls
401.1
N/A
Release four 2314's
351.1
N/A
Install CAMS 3350's
374.1
N/A
Release two 2314's
349.1
N/A
Install new CAMS CPU
356.1
50
Remove 158-1
332.8
50
DASDI Equipment
382.8
50
Install new DDO/CAMS Backup Sys.
386.4
100
Release 158 Blue
363.1
100
DASDI Equipment
388.1
100
FY-81/82 Approv ns al r~ewSpe ~DI 00/08/10 :CIA-RDP86- 3? 1.o00020003QgQ8-3
~1 9E Aga