' ON CAMPUS ' MASTER PLANNING STATUS - PLAN A
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP86-00244R000200010005-9
Release Decision:
RIFPUB
Original Classification:
K
Document Page Count:
13
Document Creation Date:
December 12, 2016
Document Release Date:
March 4, 2002
Sequence Number:
5
Case Number:
Publication Date:
January 1, 1972
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP86-00244R000200010005-9.pdf | 490.48 KB |
Body:
JAN 1j,E'?
Approved For Release 2002/03/25 : CIA-RDP86-00244R000200010005-9
(Plan A includes Scat(erp;ood-Thorne Tract)
Approved For Release 2002/03/25 : CIA-RDP86-00244R000200010005-9
Apps`6CVW4Zb- Rb1badd26Ci 0 f25A115i 4WW 4ft60O'fl010005-9
'Action to be Taken
Building Planning Staff - Planning Status
Basic Percent ACTION PHASE
In+orrna of Readi >PSMaster Pre-A&E A&E
tion 9, ' ness (9 Planning (Rework ach new
Desifni_15 Dec it 30 Apr 72 constr_ur.tion job
Planning 'T'ools:
Assemble basic land maps
T opographi.cal data
Features
Property description of site to be used
Make up-to-date inclusive ni p (1" -= 200
Set up collection of photos covering
present site
Construct basic planning model. (1"=200')
Collect and review engineering and
architectural literature for latest
techniques, advanced equipment,
and research projections
Tabular form alloca Lion of land within
facility by acres
Architectural character of existing
structures
85
80
60
80
I. = Information being acquired
C = Considered and some research by BPS
- = Does not require action at the indicated phase of planning
= Planning and design preparation
X = To be used in part for the Preliminary Master Plan presentation
Y = Special studies under contract; and collection of detailed information and supporting
architectural desi s plus BPS staff analysis and studies
Z = Develop merr~`rr~ZS~PfcY~~[~fgi~e~~i~~~1R010005-9
Approve(lg :Q44/ PC,RM650:f12'nKM0A0005-9
-Action to be Taken Building Planning Staff - Planning Status
Basic
Inforrna
tion &
Resin .
zone identifications
Patterns of working relationships -
clustering of buildings
Circulation systems - personnel,
information, and supplies
Security buffer zone
Utilities construction to be added
Percent ACTION PHASE
of Rcadi-BPSMaster Pre-A&E AFL
ness (~7c) Planning (Rework each new
1.5 Dec ~Il 30 Apr 72 construction job)
I. _ Information being acquired .
C = Considered and some research by BPS
= Does not require action at the indicated phase of planning
= Planning and design preparation
X = To be used in part for the Preliminary Master Plan presentation
Y =. Special studies under contract; and collection of detailed information and supporting
archit ctural designs plus BPS staff analysis and studies
Z = Develop t'ICP WoF ~efee s~ r ? Os3~ i ti l i~i e 49R005-9
Appeove # ' ihiWi'26O$12& :11 1AMMM-S'U2Ad44BM2WOlVO005-9
Action to be Taken
Site Development:
Relationship of structures and place-
ment within "Use Plan" zones
Type of activity
Space utilization for each structure
Bulk floor space required in each
structure
Site cross sections
Models (plus photos of models) of
separate facilities and unique
detail
Basic
Informa-
tion#
I7esi.gn _;
Building Planning Staff - Planning Status
Percent.i ACTION PH SE
of Readi-1BPSMaster Pre-A&E A&E
ness (J) Planning (Rework ach new
15 Dec ~/l 3O Apr 72 constru tion job)T
I. = Information being acquired
C = Considered and some research by BPS
- = Does not require action at the indicated phase of planning
= Planning and design preparation
X = To be used in part for the Preliminary Master Plan presentation
Y = Special studies under contract; and collection of detailed information and supporting
architectural designs plus BPS staff analysis and studies
Z = Developmc pWP 1F@I~ g a Q r~~ 44c Qp c `~ i RgApRl0005-9
Approved For Release 2002/03/25 : CIA-RDP86-00244R000200010005-9
ON MPUS" MAS'1.'ER PLANNING ST. Nsig PLAN A
-Action to be Taken
1/4 mile radius re access roads -
Rte 123, GW Pkwy, Rte 1.93
On site pattern including entrances
Changes in present internal network
Parking plan including covered areas
Commercial. vehicles and buses (pul)lic
transportation availability)
Building Planning Staff - Planning Status
Lion 9, ness (7)
Design 15 Dec /1
as
ercent I
c i
Informa- of Readi
B
i
P
ACTION PHASE
BPS Master Pre-A&E A&E
Planning (Rework 4ach new
30 Apr 72 con:,trudtion 'ob Qj
1. = Information being acquired
C = Considered and some research by BPS
- = Does not require action at the indicated phase of planning
Planning and design preparation
X = To be used in part for the Preliminary Master Plan presentation
Y = Special. studies under contract; and collection of detailed information and supporting
architectural designs plus BPS staff analysis and studies
Z = DevelolAW6i c v%-d-Wr i6gsig~bdDd3 'S? AA6kt 0 41,6dd1 bq-6605-9
Approved For Release 2002/03/25 : CIA-RDP86-00244R000200010005-9
"ON .MPUS" MA`>TliR PLANNING STAImoS PLAN A
'Action to be Taken Building Planning Staff - Planning Status
Basic
Inforina '
Lion &
Design
Personnel Circulation (exterior):
Walks and crosswalk locations
rftlnn el s
Shuttle service "On Campus"
Percent ACTION PHASE
of Re$~OfPls1 ~~R~$944I~9'A~g9A~A5-9
'Action to be Taken
Services:
Cafeteria expansion or branch
Snack bar locations
Blind stand locations
FAA -
Recreation
Stores
Credit Union
Reception- & processing
Medical, emergency rooms
Civil Defense
GSA Requirements
Basic
Informa
tion &
Desig ? .
Building Planning Staff - Planning Status
Percent ACTION PHASE
of Readi- 3PSMaster Pre-A&EI A&-,
ness (J) Planning (Rework ach new
15_l)c:ec 11~ 30 E1pr 72 coTistruction~j.oh)_
I. = Information being acquired
C = Considered and some research by BPS
= Does not require action at the indicated phase of planning
= Planning and design preparation
X = To be used in part for the Preliminary Master Plan presentation
Y = Special studies under contract; and collection of detailed information and supporting
architectural desi~n s plus BPS staff anal is and st z s
AIRppp ~~c ForkRelease 2002/93/25.:IA-RDdP86-00 Aft 00010005-9
Z = Develop or c zrectrve a.nc specs .u. gui ance or cons .rue ion
Approve ,~ j pLC iR Q6SQOR"RO0Q. ' OA0005-9
'Action to be Taken
Internal Space Configurations:
General office
office landscaping
Special purpose categories
Elevators, escalators & moving walks
Internal architectural designs, details
8- layouts
Basic
Informna '
tion &
Dc si n
Building Planning; Staff= Planning; Status
Percent ACTION PHASE
of Rcacli BPSMastcrP're Ag,E A&E
ness (~7) I Planning (Rework each new
16ec IIIN0 Apr 72 constructionioll).
I- = Information being acquired
C = Considered and some research by BPS
Does not require action at the indicated phase of planning
= Planning and design preparation
X = To be used in part for the Preliminary Master Plan presentation
Y = Special studies under contract; and fcollection of detailed information and supporting
arch tfipproV a Q el~aAe UO IOJ/2 n GIyAS and 80 244RO9fl200~1aR005-9
Z = Development of work directive an specific guidance or con. c
Approved
Action to be Taken
Fast tra cking 8& construction manage-
ment need and economics
Pre-A&E tests R analysis, borings,
vibration, EMI, relate advance:.]
?state of the art" in security devices
systems, CCTV, commo, clean
air, etc. for construction planning.
Construction timing S. cost data
Space directive 9, scope of work
Work directive
Basic
Informa -
tion &
Desig?1_..
Building Planning Staff - Planning Status
Pcr-cent ACTION PHASE
of Readi--,BPSMaster Pre-A&E1 A&E
ness (%) Planning (Rework ?ach new
1,5 Dec /l~ 30 Apr 72 constr uctionjob) J,
I. = Information being acquired
C = Considered and some research by BPS
Does not require action at the indicated phase of planning
= Planning and design preparation
X = To be used in part for the Preliminary Master Plan presentation
Y = Special studies under contract; and collection of detailed information and supporting
architectural designs plus BPS staff analysis and studies
Z = Develop r0.YledT E 10@4.$Af i0 I ~~ZOQafI R~Pi 05-9
Approvedor$eleaseS20I"T 72~"411~`adf)~b~ c05-9
Action to be Taken
Master Plan Statement Before NCPC (ins
addition to applicable parts of preceding
information):
Environmental & ecological impact
(from OMB Circular A. 95)
Impact on surrounding area (from
"Procedures 8. Criteria for. Submis-
sion of Master Plans, " by NCPC
Personnel impact data -
Number R- type of employees
Housing availability
Employees commuting time
Number low & moderate income
personnel
Basic
Informa-
tion &
Design_
Building Planning Staff - Planning Status
Percent ACTION P H A S E
of Readi- I3PS\MIaster Pre-A&Ej A&-E
Hess (/,) Planning (Rework yach new
15 Dec ~I1 30 Apr 72 con traction job)
90
10
50
90
1. = Information being acquired
C = Considered and some research by BPS
- = Does not require action at the indicated phase of planning
= Planning and design preparation
X = To be used in part for the Preliminary Master Plan presentation
Y = Special studies under contract; and collection of detailed information and supporting
architectural designs plus BPS staff analysis and studies
Z = Developii)r? iWFb-r~ ~. 20Dd/0,3gWfiCl?u (f024 G1fl@@ZM-0005-9