PROJECT STATUS AND DEVELOPMENT APPROACH

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP85B01152R001001310017-6
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
36
Document Creation Date: 
December 21, 2016
Document Release Date: 
June 11, 2008
Sequence Number: 
17
Case Number: 
Publication Date: 
September 26, 1983
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP85B01152R001001310017-6.pdf844.58 KB
Body: 
Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 0 CHRONOLOGY OF EVENTS: o PROJECT RE-DIRECTION - SUMMER 1982 o DATA BASE MANAGEMENT STUDY -FALL 1982 o SYSTEM DESIGN REVIEW -FEB. 1983 o SAFE EARLY CAPABILITY DEVELOPMENT APJD IMPLEMENTATION - WINTER 1982 AND SPRING 1983 o TECHNICAL RE-DIRECTION CONFIRMATION - APRIL 1983 o PARALLEL ACTIVITIES -SUMMER 1983 - SYSTEM DESIGN UPDATE -- SYSTEM DESIGN DOCUMENT -- HARDWARE COPJFIGURATION DOCUMENT -- DELIVERY 2 REQUIREMENTS TRACEABILITY MATRIX -- DELIVERY i DESIGN. AND IMPLEMENTATION -- DELIVERY 2 PRELIMINARY DESIGN -- DELIVERY 3 PRELIMINARY DESIGN ~ ~ SEP 198 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 RE-DIRECTION APPROACH 0 MINIMIZE SOFTWARE DEVELOPMEPIT BY TAKING ADVANTAGE OF: o EXISTING AND AVAILABLE EXPERTISE - IBM P1VS AND UM OPERATING SYSTEMS o EXISTING SOFTWARE WITH AUGMENTATIOPJS - IPIQUIRE AND P1-204 DATA BASE MAPAGEMENT SYSTEMS - AUTOMATIC IPlFORMATION MANAGEMENT (AIM) SYSTEPI - MESSAGE PROCESSING SYSTEM (MPS) - HOST BASED WORD PROCESSING (HBWP) - SAFE~EARLY CAPABILITY SYSTEM EXTERNAL INTERFACES -- CIA DATA EXCHAPIGE (DATEX) COMMUNICATION FACILITY -- DIA PENTAGOPJ COPJSOLIDATED TELECOP1MUPJICATIOPJ SYSTEM (PCTCS) -- DIA DEFENSE SPECIAL SECURITY COMMUNICATIONS SYSTEM (DSSCS) Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 PROJECT STATUS AND DEVELOPMENT APPROACH RE-DIRECTION APPROACH (CONT.) 0 INCLUDE QUALITY ASSURANCE CONTRACTOR TO: o OBTAIN AN INDEPEP~DENT AND OBJECTIVE PROJECT PERSPECTIVE o PROVIDE ASSISTANCE IN: - VERIFICATION AND VALIDATION ACTIVITIES - CONFIGURATION MANAGEMENT ACTIVITIES Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 SAFE PROJECT PLAN OVERVIEW 0 BASED ON TECHNICAL FEASIBILITY DEVELOPMENT APPROACH o CONTINUE EARLY CAPABILITY APPROACH o PERMIT EARLY INTRODUCTION TO DIA CONVERSION ACTIVITY o FACILITATE ENHAP~CEMENTS TO EARLY CAPABILITY SYSTEMS o INCLUDE DELIVERIES AS BRIDGE TO INTEGRATED SYSTEM o MAINTAIN INTEGRATED DEVELOPMENT APPROACH Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 SDR SYSTEM DESIGPJ MODIFICATIONS 0 P~0 SYSTEM PRELIMINARY DESIGN BECAUSE OF TIME COt1STRAIPlTS IMPLEMEPIT SYSTEM INCREMENTALLY AS DELIVERIES ALLOCATE ALL REQUIREMENTS T0: o COMPUTER PROGRAM CONFIGURATION ITEMS (CPCIs) o COMPUTER PROGRAM COMPONENTS (CPCs) o DELIVERIES 0 FOLLObJ FORMAL DEVELOPMEPJT PROCEDURES FOR EACH DELIVERY o PRFLIMIP~IARY DESIGPJ REVIEWS ( PDRs ) o CRITICAL nESIGN REVIEWS (CDRs) o PRELIMINARY QUALIFICATION TESTS (PQTs) o FIPIAL QUALIFICATION TEST (FQT) o SYSTEM TEST o ACCEPTANCE TEST o OPERATIOPJAL EVALUATION PHASE Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 SYSTEM DESIGPJ MODIFICATIONS 0 TAKE ADVANTAGE OF: o EXISTING SEC SOFTWARE COMPONENTS - AUTOMATED INFORMATION MANAGEMENT (AIM) - MESSAGE PROCESSING SYSTEM (MPS) - HOST BASE WORK PROCESSING o ADDITIONAL EXISTING CAPABILITIES - AIM IMPORTIEXPORT - IBM 30$8 CTC - INQUIRE TEXT STREAMING 0 REDUCE VM DEVELOPERS DEPENDENCIES 0 EMPLOY DISTRIBUTED VICE CENTRALIZED RECOVERY - EXISTING PRODUCTS' RECOVERY FACILITIES - DUAL WRITE OF IMPORTANT DATA FILES (MAP JOURNAL AND DAP INQUIRE RECOVERY FILES) Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 PROJECT STATUS APJD DEVELOPMENT APPROACH SYSTEM DESIGN DOCUMENTATION CHANGES SYSTEM DESIGN DOCUMENT (SDD) HARDWARE CONFIGURATION DOCUMENT 0 MAIN BODY - OVERALL SYSTEM DESIGN 0 APPENDICES - ONE PER DELIVERY. 0 CURRENT STATUS: o FIPJAL STAGES OF REVIEW o BASELINED AT PDRS Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 PROJECT STATUS AND DEVELOPMENT APPROACH SYSTEM DEVELOPMENT SCHEDULE DELIVERY i SAFE-C (SEPT - NOV 1983) SAFE-D (SEPT -DEC 1983) 0 NEW DISSEMINATION ALGORITHM - CRW 0 INQUIRE DATA BASE MANAGEMENT SYSTEM PROTOTYPE - INF,ODATA 0 MODEL 204 DATA BASE MANAGEMENT SYSTEM - TRW/CCA 0 USER POPULATION - 3001150 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 SYSTEM DEVELOPMENT SCHEDULE (CONT.) DELIVERY 2 SAFE-C (NOV 1984) 0 SINGLE USER LOG-ON - CRW 0 DOCUMENT AND SYSTEM CATALOG FILES IN INQUIRE DBMS - INFODATA 0 INITIAL INTEGRATIOPI OF AIM AND MAIL FUNCTIONS - CRW ~ ODP 0 INTRODUCTION OF SAFE USER LANGUAGE COMMANDS AND BASIC SCREEN CONFIGURATIONS - CRW 0 INTER-MACHINE (MVS-VM) COMMUNICATIONS - ODP 0 USER POPULATION - 500/250 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 PROJECT STATUS AND DEVELOPMENT APPROACH SYSTEM DEVELOPMENT SCHEDULE (CONT.) DELIVERY 3 SAFE-D (MAR 1985) 0 ALL FUNCTIONS INCLUDED IN DELIVERY 2 0 SECOND PASS DISSEMINATION, CRD AND HUMINT FILE CONVERSION - CRW ~ TRW 0 PROTOTYPE DODIIS NETWORK FRONT-END - TRW 0 SIMPLE INDEX FILES IN INQUIRE DBMS - INFODATA ~ CRW SAFE-C (MAR 1985) 0 SIMPLE INDEX FILES IN INQUIRE DBMS - INFODATA 6 CRW . Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 PROJECT STATUS AND DEVELOPMENT APPROACH SYSTEM DEVELOPMENT SCHEDULE (CONT.) DELIVERY 4 SAFE-D (AUG 1985) 0 AIF, DIOBS AND ELINT FILE CONVERSIONS - TRW 0 OPERATIONAL. INTERFACE TO DODIIS - TRW 0 USER INTERFACE EPdHANCEMENTS INCLUDING MODEL 204 DBMS INTERFACE - CRW 6 TRW 0 BATCH PROCESSING SUPPORT - TRW 0 COLLATERAL PRODUCTION - TRW Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 PROJECT STATUS AND DEVELOPMENT APPROACH SYSTEM DEVELOPMENT SCHEDULE (CONT.) DELIVERY 5 SAFE-C (DEC 1985) 0 USER INTERFACE ENHANCEMENTS FROM DELIVERY 4 AND ENHANCEMENTS TO SUPPORT SYNCHRONOUS TERMINAL ACTIVITIES - CRW 0 CENTRAL INDEX FILE AND RELATED PRODUCTS IN INQUIRE DBMS - INFODATA, TRW ~ CRW 0 USER POPULATION - 1000/500 SAFE-D (FEB 1986) 0 - USER INTERFACE ENHANCEMENTS TO SUPPORT SYNCHRONOUS TERMINAL ACTIVITIES - CRW . 0 USER POPULATION - 10001500 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 PROJECT STATUS AND DEVELOPMENT APPROACH SYSTEM DEVELOPMENT SCHEDULE (CONT.) 0 CURRENTLY 5 DELIVERY PRELIMINARY DESIGNS UNDERWAY 0 SUBSEQUENT DELIVERIES WILL: o SATISFY REMAINING REQUIREMENTS o FACILITATE USER FEEDBACK Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 SAFE REQUIREMENTS BASELINE 0 SYSTEM REQUIREMENTS SPECIFICATION (SRS) 0 CONVERSION REQUIREMENTS SPECIFICATIONd (SAFE-C CRS) 0 CONVERSION REQUIREMENTS SPECIFICATION (SAFE-D CRS) 0 EXTERNAL INTERFACE SPECIFICATION (SAFE-C IFS) 0 EXTERNAL INTERFACE SPECIFICATION (SAFE-D IFS) 0 USER INTERFACE REQUIREMENTS SPECIFICATION (UIRS) Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 PROJECT STATUS AND DEVELOPMENT APPROACH DELIVERY REQUIREMENTS ALLOCATION METHODOLOGY 0 ALLOCATE HIGH LEVEL FUNCTIONAL REQUIREMENTS 0 DOCUMENT ALLOCATION IN DELIVERY RTM 0 VALIDATE RTM 0 VERIFY DEVELOPERS' DESIGPJ Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 REQUIREMENTS MANAGEMENT 0 REQUIREMENTS CHANGES ARE HANDLED VIA FORMAL CONFIGURATION MANAGEMENT PROCEDURES 0 UPDATE PROCESS ALLOWS CHANGES RESULTING FROM: o VALIDATION OF USER INTERFACE THROUGH PROTOTYPING o LESSONS LEARNED FROM EARLIER CAPABILITY RELEASES o NEW USER NEEDS Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 SYSTEM CAPABILITY DESCRIPTION FUNCTIONAL CAPABILITIES O MESSAGE PROCESSING O DATA BASE MAINTENANCEIRETRIEVAL O BATCH PROCESSING O ON-LINE PROGRAMMING 0 REPORT GENERATION O ANALYST-TO-ANALYST COMMUNICATION 0 EXTERNAL LINKS - DIA UNIQUE - CIA UPJIQUE Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 SYSTEM CAPABILITY DESCRIPTION FUNCTIONAL CAPABILITIES (CONT.) 0 jSTRUCTURED FILE REPORT GENERATION .0 SAFE USER LANGUAGE DATA BASE CONVERSION iTEXT COMPOSITION USER POPULATIOPJ: 1000/500 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 SYSTEM CAPABILITY DESCRIPTION SAFE DATA BASES 0 MAJOR SYSTEM DATA BASES - DOCUMENT FILES - STRUCTURED FILES 0 MAJOR USER DATA BASES - PRIVATE FILES Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 O SYSTEM-LEVEL REQUIREMENTS HAVE BEEN DECOMPOSED AND ALLOCATED TO ELEVEN COMPUTER PROGRAM CONFIGURATION ITEMS 0 CPCI SPECIFICATIONS ARE THE TECHNICAL ALLOCATIONS OF DEVELOPMENT ACTIVITIES 0 REQUIREMENTS TRACEABILITY ENSURES COMPLETE COVERAGE OF SYSTEM REQUIREMENTS Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 MAPPING OF DEVELOPMENT COMPONENT TO OPERATIONAL ELEMENT Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 OPERATIONAL ELEMENTS Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 COMPUTER PROGRAM CO~JFIGURATION ITEMS MODEL 204 , - DATA MANAGEMENT MESSAGE ANALYSIS PROCESS ~_7 DISSEMINA TION ANALYSIS l INQUIRE USER DATA BASE 7, DODIIS COMMUNICA TION COMMUNICATLON SERVICES AfANAGEMENT INFORMATION SERVICES SAFE SYSTEM SERVICES Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 7 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 OVERVIEW SYSTEM DESIGN HARDWARE IBM 308X VM IBM 30BX VM USER FILE SUPPORT IBM 308 X MVS IBM 308X MVS SYSTEM FILE SUPPORT Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 ~~ It-.. ~t Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 INTER-MACHIPJE COMMUNICATIONS 0 CTC/HASP APID AIM IMPORT/EXPORT 0 SHARED DISK o DAP AP~lD UDR FOR MAIL FILES o INQUIRE FOR SYSTEM CATALOG/DOCUMEPJT DATA BASE 0 REMOTE SPOOLIPIG CONTROL SUBSYSTEM (RSCS) o SYSTEM RESTART o REMOTE PRINT CONTROL o BATCH PROCESSING SUPPORT 0 COMMLINICATIOPJ NETWORK SUBSYSTEM (CPlS ) o ODP COPJPJECTIVITY o BACK-UP TO CTC HASP Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 MANAGED AT CPCI A~JD CPC LEVELS 0 COMPUTER PROGRAM CONFIGURATION ITEMS o MESSAGE A~JALYSIS PROCESS (LOGICOPIIOSD) o DISSEMINATION ANALYSIS PROCESS (CRW) o DATA MANAGEMENT (TRW) IN(?UIRE DATA BASE MANAGEMENT SYSTEM (IPJFODATA) MODEL 204 DATA BASE MAPJ!AGEMENT SYSTEM (TRW/CCA) USER DATA BASE (CRW) o AUTOMATIC INFORMATION MANAGEMENT (ODP/IBM) o DODIIS COMMUP~JICATIONS (TRW) o COMMUPJICATION SERVICES (ODP) o MANAGEMENT INFORMATION SERVICES (TRW) o SYSTEM SERVICES (TRW) Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 MAIL FILES DOCUMENT DATA BASE ~.~ SHARED INDEX CRD HUMINT FILES SHARED Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 DESSIMINATION ANALYSIS PROCESS INQUIRE DATA MANAGEA9ENT VM DATA MANAGEMENT MESSAGE ANALYSIS PROCESS VM AIM VM INQUIRE Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 EXTERNAL MESSAGES TRUCTUR DATA BASE SAFE Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 USER DATA BASE DATA MANAGEMENT MAIL FILES SHARED DOCUMENT DATA BASE SHARED INDEX \ CRD HUMINT FILES MVS MVS MAP DAP DAP INQUIRE VM HOST CONFIGURATION? DODIIS COMMUNICATIONS I 'USER FILES MESSAGE ANALYSIS PROCESS -MVS INQUIRE MVS DATA MANAGEMENT Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 PROJECT DEVELOPMENT MILESTONES 0 DELIVERY is - SAFE-C NOV. 1983 - SAFE-D DEC. 1983 0 DELIVERY 2 PDR SEP. 1983 0 DELIVERY 3 PDR NOV. 1983 0 DELIVERY 2 CDR JAN. 1984 0 DELIVERY 4 PDR MAR. 1984 0 DELIVERY 3 CDR MAY 1984 0 DELIVERY 4 CDR AUG. 1984 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 PROJECT STATUS AND DEVELOPMENT APPROACH PRELIMINARY DESIGPd REVIEW PROCEDURE 0 IDENTIFY AND DOCUMENT PRELIMINARY DESIGN ISSUES: o SYSTEM AND DELIVERY DESIGN INCONSISTENCIES o DELIVERY COMPONENT INTERFACE INCONSISTENCIES 0 ASSIGN ACTION ITEMS FOR DOCUMENTED ISSUES 0 WITHIN 30 DAYS. o RESOLVE ALL POR ISSUES o UPDATE AND BASELINE ALL PDR DOCUMENTS - PRELIMINARY DESIGN SPECIFICATIONS - INTER-CPCI INTERFACE CONTROL DOCUMENT . - DATA SPECIFICATION DOCUMENT - DELIVERY 2 REQUIREMENTS TRACEABILITY MATRIX o BASELINE ALL UPDATED SDR DOCUMENTS - SYSTEM DESIGN DOCUMENT AND APPENDICES - HARDWARE CONFIGURATION DOCUMENT Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 AGEPJDA 26 SEPTEMBER 1983 TIME 0800-0815 0815-0830 0830-0900 0900-1000 1000-1015 1015-1045 1045-i?_00 1200-1300 TOPIC IPJTRODIJCTION ATTENDANCE ADMINISTRATIOPJ PROCEDURES SAFE DESIGN STATUS AND DEVELOPMENT APPROACH SAFE SYSTEM DESIGPJ ----BREAK----- DELIVERY 2 REQUIREMENTS SUMMARY DELIVERY 1 APJD 2 DESIGN ----LIJCH---- PRESEPJTER STAT Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 AGENDA (CONT.) 26 SEPTEMBER 1983 TIME 1245-1300 1300-1315 1315-1430 1430-1445 1445-1530 1530-1600 1600-1615 TOPIC LOGICONIOSD EXECUTIVE SUMMARY MAP ARCHITECTURAL DESIGN MAP MVS DESIGN EXTERNAL MESSAGE IPJTERFACE CPC MESSAGE RESOLUTION PROCESS CPC ----BREAK---- MAP MVS DESIGN (CONT.) MESSAGE SEQUENCE AND CONTROL CPC MAP MVS DESIGN ISSUES AND ACTION ITEMS SESSIOPI WRAP-UP PRESEP~ITER LOGICO~! LOGICOPJ GEODYNAMICS STAT STAT Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 SAFE DELIVERY 2 PDR 26-29 SEPT. 1983 AGENDA 27 SEPTEMBER 1983 TIME 0830-0845 0845-0900 0900-1000 1000-1015 1015-1130 1130-1200 1200-1300 TOPIC REMARKS CRW EXECUTIVE SUMMARY DAP MVS DESIGN PROFILE COMPILATION AND MAINTENANCE DISSEMINATION ANALYSIS CPC ----BREAK----- COPJT. nAP MVS DESIGN DATA BASE MAINTENANCE CPC DAP THREADS SAP SUMMARY DAP MVS DESIGPJ ISSUES APJD ACTION ITEMS ----LUNCH---- PRESENTER CPC GEODYPJAMICS STAT STAT Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 AGENDA (CONT.) 27 SEPTEMBER 1983 TIME 1300-1315 1315-1330 1330-14~+5 1445-1500 1500-1600 1600-1630 1630-1645 TOPIC INFODATA EXECUTIVE SUMMARY INQUIRE REQUIREMENTS SUMMARY IPIOIlIRE MVS DESIGN ----BREAK---- INOUIRE VM DESIGN IPlQUIRE SUMMARY INQUIRE MVS AND VM DESIGN ISSUES APJD ACTION ITEMS SESSION WRAP-UP PRESENTER INFODATA INFODATA GEODYNAMICS STAT STAT Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 AGEP!DA 28 SEPTEMBER 1983 TIME 0830-0845 0845-0900 ?0900-1000 OQ45-1000 1000-1030 1030-.1100 1100-1200 1200-1300 .TOPIC REMARKS AIM REQUIREMENTS SUMMARY AIM VM DESIGP! ----BREAK---- AIM VM DESIGN (CONT.) AIM VM DESIGP! ISSUES AND ACTION ITESM MAP VM DESIGN MESSAGE ERROR CORRECTIOP! ----LUNCH---- PRESENTER GEODYNAMICS LOGICOPJ STAT Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 AGE~lDA ( COPlT. ) 28 SEPTEMBER 1983 TOPIC PRESEPJTER L~ 1300-1330 MAP SUMMARY LOGICO~J 1330-1400 MAP RECOVERY AND RELIABILITY MAP PERFORMANCE MAP IMPLEMENTATIOPI MAP VM DESIGN ISSUES AND 1400-1415 ACTION ITEMS ----BREAK---- GEODYNAMICS 1415-1515 SAFE-C CONVERSIOPJ STAT 1515-1545 RSION ISSUES APJD ACTION ITEMS GEODYPIAMICS 1545-1600 SESSION WRAP-UP STAT Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 AGENDA 29 SEPTEMBER 1983 TIME 0830-0845 0845-1000 1000-1015 1015-1100 1100-1130 1130-1145 1145-1245 TOPIC REMARKS UDB VM DESIGPJ UnB SUMMARY ----BREAK---- UDB VM DESIGN (C0~lT. ) UDB VM DESIGN ISSUES AND ACTIOP?! ITEMS SESSION WRAP-UP DELIVERY 2 DESIGPJ ISSUES AND ACTIOPJ ITEMS Approved For Release 2008/06/11 :CIA-RDP85B01152R001001310017-6 PRESENTER GEODYPJAMICS GEODYNAMICS STAT STAT