CUBAN CRISIS COMMENTS ON LEHMAN PAPER

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP85B00803R000200090010-3
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
5
Document Creation Date: 
December 16, 2016
Document Release Date: 
March 10, 2005
Sequence Number: 
10
Case Number: 
Publication Date: 
November 7, 1962
Content Type: 
BRIEF
File: 
AttachmentSize
PDF icon CIA-RDP85B00803R000200090010-3.pdf119.88 KB
Body: 
1 :1 DDR Chron-2 NRO review(s) completed. Approved For Release 2005/05/16 : CIA-RDP85B00803R000200090010-3 TS-185134 7 Nov 1962 DDR to DCI Subj: Comments on Lehman Paper Generally believes subj paper excellent presentation of facts insofar as he knows them. ...a few corrections: a. P. 12 para 23,This sentence im lie that there was some external directive that the fits shld be carried out Neither I nor Col Ledford know 25X1 of any such directive. In fact, all missions which the Agency ran over Cuba either before or after Sept 5 were designed to have maximum altitude over target with the only compensating factor being the rgmt for sufficient fuel after coast-out to reach the refueling point or alternate landing field. b. Page 26, para 49. Criteria for launch as Cat II (2/8 cloud cover) or better ove: critical target areas. In some cases fits were authorized with Category III over appreciable parts of the flt. c. Page 28, para 53. Documentation on the presentations made to the SG can probably be pulldd together--actual recommendations were NRO recommendations as opposdd to unilateral CIA recommendations. However, these were concurred in by CIA. Primary objective was to cover suspect MRBM site on western end of Cuba and at same time pass over one of the SAM sites which was considered most nearly 'op eratiol AoproQed' Re4tfa 005O051t :tCI DP 4B 3 0 ' -3determine opnl status in order to assess risk to further U-91 msns required to get complete coverage of Cuba asap. MRBM site at San Cristobal was not a secondary objective. Approved For Release 2005/05/16 : CIA-RDP85B00803R000200090010-3 It was considered at least if not more important than the SAM coverage. I do not believe it was true that the mission would not have flown over San Cristobal if the most likely candidate for an opnl SAM site had not been in Western Cuba. In fact, the coverage of the SAM site was only desired to see if one could fly with impunity over western Cuba. d. Page 28, para 54+. I would suggest deletion of the words "by the Pres." in the 3rd line since I believe this was a unilateral DOD decision rather Approved For Release 2005/05/16 : CIA-RDP85B00803R000200090010-3 Approved For Rel 25X1 DD/R - CUBAN Crisis (Soviet military in Cuba) ~- a ew-e-Yee-e~~~e~-~egeaeas-w Chron-2 25X1 00803R000200090010-3 Staff Meeting Minutes 13 Nov 62 eported that Cuban air defense traffic indicates that their air defense system is still being run by the Russians. It was observed that we must anticipate and be prepared for the fact that some day they are going to shoot. It was urged that maximum alertness on the part of everyone be maintained in order to get any possible clue of impending plans to take action against our aircraft." Approved For Release 2005/05/16 : CIA-RDP85B00803R000200090010-3 (DDR SMM) 25X1 Approved For Release 2005/05/16 : CIA-RDP85B00803R000200090010-3 DD/R - Cuban Missile Crisis SMM 13 Nov 1962 25X1 DD/R announced to staff that an inquiry would be made into the intelligence coverage and reporting of the missile build-up in Cuba and said that a post mortem from the standpoint of how more timely and precise intelligence might have been achieved would be a good idea. His fear was that there might be some buckpassing and he wanted OSA to review carefully all factors leading up to the 14 October date, (when missiles were actually discovered) taking into account all requirements, COMOR actions, Special Group actions, weather factors, etc. Approved For Release 2005/05/16 : CIA-RDP85B00803R000200090010-3 By 14AWJ99 FeV fWaMe2~kq'Tr 6anCbi- I .O( W9OOac4R090010d3COMOR members with regard to long range planning for aerial reconnaissance of Cuba saying that evidence of deactivation of the IRBM and MRBM sites coupled with observation of missiles and missile associated equipment either on the docks or aboard ships made daily coverage of the deactivated sites no longer necessary. Coverage of ports should be continued and coverage of ports when ships capable of carrying missiles are in port. Suspect caves to be covered once each and low level night photography, and the entire island covered once a week by BRASS KNOB photography. 25X1 Ch/JCS (Gen Taylor) notified DCI on 4 Nov 62 that nothing should be done to the U-Z's in the way of installing ECM equipment until Gen Powers, CINSAC completes a study on implications of installing this equpmt in these a/c. Approved For Release 2005/05/16 : CIA-RDP85B00803R000200090010-3