ANALYSIS OF AGENCIES COMPUTERIZED FINANCE AND RESOURCE MANAGEMENT SYSTEM

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP85-00988R000700020001-3
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
149
Document Creation Date: 
December 16, 2016
Document Release Date: 
July 1, 2005
Sequence Number: 
1
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP85-00988R000700020001-3.pdf6.14 MB
Body: 
Approved For R CIA-RDP85-00988R000700020001-3 MANAGEM NT SYSTEM Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 20 tHinoTKII:85-00988R000700020001-3 MEMORANDUM FOR: Director of Logistics SUBJECT-: ADP Systems Study 1. Attached is a study entitled "Analysis of Agencies Computerized Finance and Resource Management System." That study identifies components of the finance and resource management system and their operating characteristics in order to flag inefficiencies and recommend alternatives. Recommendations contained in paragraph four were an integral part of that study and are being forwarded for review and approval consideration. 2. The computerized system network consists of four stand alone ?systems (SAS) maintained independently of ICS, several internal systems under the command jurisdiction of OL, and OL controlled systems designed for interfacing with components of DOD and the Office of Finance. Maintenance responsibilities for the four, SAS are as follows; Data bases for the SAS network house essentially the same data elements, yet these systems Data elements resident to other systems were programmed independently often in. different languages. as well as agent With this mOnor exception data include those common to the names, equipment frequency, etc. elements residing in the network are roughly comparable to those in ICS. T. CONFIBENIIAL Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 idthc tifki4 Approved For Release 2005 . - 1411-00988R000700020001-3 Subject: ADP Systems Study 3. Internal OL administered systems belong to two classes; first, those already operational and; second, those in various stages of design. CONIF and AWCS are illustrative of the former class whereas PARS, the Vehicle Control System and the stand alone procurement system represent the latter. Like the SAS network, this component consists of independently programmed applications. Item Identification Branch, SD, .manages one system which interfaces with the Defense Logistics Services Center. This application, together with that designed to bridge data to the Office of Finance, constitute the only computerized interfaces of the network. The configuration of this network contributes directly to inefficiency and exorbitant overheads. The design of an integrated system offers the most promising option for improving performance capabilities of the total system at less cost. Integration has the potential of increasing operational efficiency because ICS and other updates translate into system updates which decreases dependency on manual update. 4. Analysis of Supply Division workload factors confirm a downward spiral. This trend is believed attributable to five factors; first, external components are relying increasingly on SAS networks for resource management which tends to decrease reliance on logistics; second, the Director of Central Intelligence C3EliLlEti Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 25X1 rir1.1 7:2 rlrr Approved For Releaset2005/07.A2k thUbFi85OO988ROOO7OOO2OOO13 Subject: ADP Systems Study routine logistic support which is certain to impact on logistics in terms of reduced workloads; third, certain operational programs are being retrenched or deactivated altogether; fourth, recent OC procurement of organic spares required to maintain major systems for their entire life expectancy, together with purchase of repair and return materiel from direct materiel procurement allotments, has resulted in a decrease in transaction processing because directs are excluded from formal accountability, and; fifth, inability of the computerized system to flag repetitive demand to provide a wider base for stockage. Implementation of an integrated system will reverse this trend and permit logistics to play a more positive role in resource management. 5. Based on the foregoing it is recommended that: a. Staffing of the Systems Analysis Branch be expanded to include logisticians having credentials in automation technology in order to esynthesi;-:?. requirements of operating components for reduction to design specifications; b. Operating Divisions organize a cadre of system analysts to formulate data processing requirements in response to guidance from sAa Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/011.2! Cl.fi,l-REII'8R-.20988R000700020001-3 - 4 - Subject: ADP Systems Study c. Systems personnel be tasked to define specifications for an integrated system together with a sound strategy for implementation. Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 25X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 TO : Chief, Supply Division SUBJECT: Analysis of ICS - Limitations and Capabilities 1. This study is being submitted in response to your request that limitations and capabilities of ICS be analyzed, particularly with reference to its capability to interface with; a) internal computer systems such as etc, serving components other than OL; b) external DOD computerized systems and; c) other OL stand alone systems now operational or in the process of being implemented such as CONIF, AUCS, EARS, etc. It was also requested that the performance capabilities of ICS be related to current 25X1 and future ADP requirements. represents the most critical element of the Agency logistic system. This stems from the fact that resources allotted to these,systems are divisible into shelf stocks positioned at forward storage facilities for release in response to 25X1 demand with residual resources emplaced for operational use. Four independentry programmed and maintained computer applications have been activated to exercise budget and management control over this network; namely, 25X1 lone common denominator links this system network together. That linkage derives from the fact that the four computerized systems have the capability to control the acquisition, storage, maintenance, and distribution of electronic resources. Basically, the mission of ICS can be expressed in similar terms which makes this system network compatible in terms of intent and purpose but incompatible in terms of maintenance and operation because the four systems exist independently of one another. 3. Collectively, the dollar value of materiel prepositioned at foreward storage facilities (stock), monthly transaction counts, and the number of line 'IgX1 Items maintained in the four stand alone systems (SAS) are nearly comparable to their counterparts in ICS. This proposition can be confirmed by contrasting Approved For Release 2005/0742 :-CtA-RDP85-06988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 SUBJECT: Analysis of ICS - Limitations and Capabilities line items were maintained at CD as of 31 Dec. 1977 compared to an estimated 12100 for SAS the count of which is predominately non-expendable. Comparision of these quanta lead to the conclusion that system workloads are nearly evenly divided between ICS and the SAS network. One notable difference exists between these systems; namely, ICS engages in volume processing whereas SAS transactions normally represent singular equipment transactions. Original versions of SAS were designed to achieve low level data processing tasks. Enhancement of these early versions augmented the applicable components inventory management and control potential. This, in turn, encouraged components to become more actively involved in resource management responsibilities. Seemingly, the shift toward decentralization impacted on ICS in terms of declining workload. 4. The four SAS were programmed independently of ICS and one another, often in different data base management or programming language. This exclusionary principle is also an essential property of peripheral OL systems now operational or soon to be activated in logistics. FARS, AWCS, CONIF, and ICS clearly demonstrate the ascendancy and acceptance of SAS doctrine. Systems included in this network may be individually efficient and yet be extremely inefficient from the stand point of total system operations This contradiction is attributable, in part, to the fact that the output of one system must be manually entered in the next system of the data processing chain. Thus file updates in the ICS/SAS network entail double inputs which increases overheads. Elements of this system are so numerous and complex that it is pro- bably not feasible to link the system together via computerized interface. Five reasons contribute to inefficiencies and high maintenance cost associated with this network; first, systems comprising the network must be programmed and enhanced separately which increases development costs; second, duplicate keying of identical or similar inputs for updating these systems increase manpower burdens and computer costs; third, file redundancies exist throughout the network which increases computer utilization costs; fourth, yields associated with Integration are forfeited in SAS networks because enhancements must be implemented separately which is not true of the integrated system and; fifth, the continued activation and deactivation of different software systems essential to the operation of the ICS/SAS network is extremely costly. 25X1 5. Supply Division workload factors have decreased rather precipitously in recent years. This decrease is believed attributable to the interplay of five factors which are self reinforcing; first, the Director of Central Intelligence maintained by cognizant offices have decreased dependance on logistics; third, accentuation of trends to purchase organic spares and repair/return materiel Approved For Release 2005/07A-CIA-RDP85=00988R000700020001-3 -2- Approved For Release 2005/07/12 : CIA-RDP85-,00988R000700020001-3 SUBJECT: Analysis of ICS - Limitations and Capabilities from direct materiel procurement allotments, the accountability of which is excluded from ICS, has decreased transaction densities in ICS; fourth, implementation of systems designed to control the acquisition, storage, surveillance, and distribution of the logistic resource such as the computerized repair/return system recently programmed for OC to control 15,000 line items outside the formal supply system, and; fifth, the throttling down or deactiviation of operational activities. 6. Certain propositions described earlier can be verified statistically. For example, ICS processed an estimated 9834 transactions monthly in FY75, 6492 monthly in FY76, 6450 monthly in 77, and 5526 monthly so far in FY78. Similarly procurements financed from direct materiel procurement allotments, expressed in dollar terms, accounted for 57% of total purchases in FY76, 69% in TQ, 77% in FY77, and approximately 80% to date in FY78. Statistically it can be argued that ICS processing levels are decreasing as a result of direct shipments. This phenomena can ue reversed; provided, ICS is redesigned in such a manner that it is capable of flagging repetitive demand and the trend toward decentralization is reversed. The impact of decentralization is best illustrated by example. Supply Division maintained 13,257 line items at CD as of 31 Dec. 1977. Assuming OC's computerized repair/return system spans control of 15000 line items rici that the four SAS continue to manage approximately 12100 line iters in the future, external systems will control twice as many line items as ICS. If these trends materialize In the future they may lead to a totally decentralized system in which logistics plays quite a different role in resource management. 7. Factual data for the analytical phase of the study was assembled on the basis of personal interviews, dollar value distribution reports furnished by Office of Finance, statistical reports provided by SOB and DCB, and special computer reports supplied by DCB. Raw data was subject to a verification rate approaching ninety percent. Accordingly, a certain margin of error may be Inherent in the study. These errors, however, are not sufficient magnitude to distort projections presented therein or negate the validity of the study. 8. The study concludes that present trends toward decentralization can be reversed through the design of an integrated inventory management and control system. Concurrently, it is concluded that efficiency and economy of operations can be maximized through integration. Approved For Release 2005/07/1-2 : CIA-RID-085-00988R000700020001-3 -3- 25X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 ANALYSIS OF AGENCIES COMPUTERIZED FINANCE AND RESOURCE MANAGEMENT SYSTEM Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 S.. TABLE OF CONTENTS 1. PURPOSE Page 1 2. LEGISLATIVE AND REGULATORY SETTING 1 a. CURRENT 1 b. PROPOSED 4 3. SYSTEMS INTEGRATION STANDARDS 5 4. SCOPE AND INTENT 7 5. CHARACTERISTICS OF INVENTORY MANAGEMENT SYSTEM 8 6. SYSTEM DATA FLOWS 11 7. SYSTEM INTERFACES, DOCUMENT GENERATION, AND DECISION MAKING POTENTIAL OF AUTOMATED SYSTEMS 14 8. QUANTITIVE ATTRIBUTES OF SYSTEM OPERATION AND SYSTEM PERFORMANCE CHARACTERISTICS 17 9. ADP SYSTEM PLANNING FOR FUTURE - CAPABILITIES AND LIMITATIONS 27 10. PROPERTIES AND PERFORMANCE CAPABILITIES OF INTEGRATED SYSTEMS 37 11. CATALOGING INTERFACE 43 12. FINANCE AND ASSOCIATIVE INTERFACES 47 13. SYSTEM REVIEW AND APPROVAL STANDARDS 52 14. TRENDS AFFECTING DESIGN REQUIREMENTS OF ADP SYSTEMS 58 15. DOD SOFTWARE SYSTEMS 61 16. CONCLUSIONS 63 17. RECOMMENDATIONS 65 18. GLOSSARY OF TERMS 67 Approved For Release 20047/12 : CIA-pDF.15-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 1. PLECIMI: Succeeding paragraphs describe characteristics of several inventory management systems designed, developed and implemented independently of the Logistics Inventory Control System (ICS). The objective of this research effort is to determine whether or not the proliferation of stand alone systems is in violation of statute, regulation, or operational efficiency. Findings presented in this study must be regarded as pre- liminary as time precluded comprehensive analysis actual or planned autonomous systems operate. Legislatizr_lattory Setting: a. Current: Exclusionary clauses in CIA enabling and of environments which associative legislation provides a basis for implementing financial property accounting and control systems independently of statutes, regulations and GAO system audits per- taining to other government instrumentalilities. This exclusionary feature has seemingly been interpreted to mean the Agency nay adopt such procedures as may be necessary to ensure compliance with both the spirit and intent of legislation governing other executive agencies. The Agency s exemption from GAO audits is directly traceable to statute. The Central Intelligence Agency Act of 1949, as amended, states that the Agency may expend confidential funds within approved limitations "without regard to the provisions of law and regulation relating to the expenditure of Government funds." (50 U.S.C.A. r Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 403j(W) (See Appendix A). This act further states that the director's certification on expenditure documents "shall be deemed a sufficient voucher for the amount therein stated" and "are to be accounted for "solely on the certification of the Director" or the Deputy Director per authority contained in 41 Comp. Gen. 429 dated 2 January 1962. (Appendix D) Provisions of this act have been interpreted to mean that audits "would be limited to deter- mining that such certifications have been made" which precludes comprehensive confidential fund audits by GAO. Public law 04-863 reinforces the exclusionary principle by vesting responsibility for the establishment and maintenance of internal property control systems in the "head of each executive agency" (31 U.S.C. GG a (c)) (Appendix C). This individual is also responsible for executing such internal audit procedures as may be necessary to protect the public interest. This statute, in concert with decisions rendered by the Comptroller General, authorizes the establishment of such CIA internal audit procedures as may be deemed appropriate; providing only that comprehensive internal audits be conducted to eilsure resource management and control. Viewed in this per- spective the design of stand alone systems does not violate any known statute or regulation. Moreover, development of autonomous systems is consistent with past command directives. Paragraph 3, OL 2 0024a, dated 19 January 1972, provides a testimonial to this approach wherein it is stated :;i)at "the Office of Communications and Technical Services Division" Approved For Release 2005/07/12 : CI:RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 .?$-,';',-74fW7111 r , nay "wish to maintain certain in-use records under the new Materiel Resources System." (Appendix D) Provisions of this memorandum also state that this office (OL) is not qualified to address those requirements and suggests that the Task Force (ODP) take up such questions with those offices and other offices that might be concerned." The intent of 3L-2-092.4a was not to delegate carte blanche authority for independent systehs development to technical components, yet this interpretation did in fact prevail. Accordingly, tire cellular approach to design became rooted in tradition. Current organizational function and mission statements do not delegate responsibility for ADP system design to either the Director of Logistics or his designee (Appendix E). Planned mission- updates, however, do vest responsibility for the design of a worldwide supply system in the Office of Logistics. Pursuant to provisions of the planned mission statement the Director of Logistics is also responsible for establishing and approving pro- perty accounting systems whether automated or manual. These responsibilities Ar derive from paragraphs c100 and (p) wherein it is stated that the Director of Logistics shall "develop, establish, and administer a worldwide supply system" and concurrently "establish and/or approve Supply Management systems for maintenance of decentralized accountable records and their adoptations to automated processes where necessary and cost effective." (Appendix F) Implicit in these delegations is the responsiblity for the Director of Logistics to periodically review all on-going systems to ensure effective control over the acquisition, use, and accountability for the logistic resource. ^ ? ? ' ? 111,-, Lu 4.1.e Approved For Release 2005/07/12 : Clps-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 b. Proposed Provisions of Title I, Section 113 of the proposed "National Intelligence Reorganization and Reform Act of 1973", seemingly rescind previous legislation concerning the applicability of legal and external regulatory requirements to Agency operations. This legislation states that entities of the intelligence community "shall be subject to financial and program management audit and review by the Comptroller General of the United States", provided such audits are either commissioned or approved by designated committees of the Congress. (Appendix G) Pursuant to provisions of this act, the director has discre- tionary authority to exempt certain activities from review for national security reasons. Exercise of this authority, however, will require that the director notify the appropriate Congressional committee of the exemption together with reasons for granting it. This statute, unless amended, leaves little latitude for interpretation with regard to the question as to whether or not internal reviews are authorized. 41!1=1.0MWMMUM Property-management reviews conducted by GAO are normally system audits designed to determine whether or not; a) management information and control systems are efficiently organized and administered and; b) management policies and procedures are consistent with applicable legal and external regulatory requirements such as those uefined in the "Budget and Accounting Act of 1950, Public Law 04-863 approved August 1, 1956", etc. The "National Intelligence Reorganization and Reform Act of 1970" does not specifically exclude the intelligence community from statute and regulation, therefore, r Approved For Release 2005/07/12 : CIA:RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 the act presupposes compliance. Given this setting, it seems safe to predict that the director's authority to restrict the scope of audits and system reviews nay be circumscribed. Assuming the Comptroller General rules that compliance with legal and external regulatory requirements is mandated by the act, GAO may recommend; a) adherence to accrual accounting procedures for reasons of budgetary and property control; b) implementation of an inte- grated inventory management and control system to eliminate waste associated with the maintenance of a profusion of computerized systems performing essentially identical tasks and; c) the adoption of a centralized line item reporting and control system to provide better property accountability. Currently a multitude of stand alone data bases must be accessed to deter- mine the asset posture of a given item worldwide. The "National Intelligence and Reform Act of MO" does not set forth specific standards or objectives applicable to the comptroller general's audit and review functions. Consequently, the precise impact of the act cannot be anticipated at this time for planning purposes. Certain initiatives might be .undertaken for preparatory purposes such as the design and implement- ation of an integrated inventory management and control system to reduce overheads and enhance system performance capabilities. Endorsement of this option has the advantage of preparing the system for comprehensive review as well as streamlining operations. 3. Systems Integration Standards: Organizational elements tasked with system review and approval respon- sibility normally define standards which are linked to the degree of integration Approved For Release 2005/07/12 : C.14.:RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 desired in system operations together with system performance requirements. System integration may assume three forms which frequently overlap to some degree; first, the highly centralized system in which system components are automated and controlled centrally; second, the centralized management infor- mation system coupled with a decentralized command and control structure and; third, the decentralized system consisting of autonomous components marginally capable of integration. Centralized control systems function best in automated process control operations such as power distribution systems-refineries, etc. The centralized management information, decentralized command and control system is normally capable of capturing, storing, and producing management Information needed by the decentralized command structure. Military systems are of this variety and consist of highly integrated-interactive systems which preserve traditional logistic command structures. Contrastlyjthe Agency's system consists of numerous stand alone systems which are marginally capable of direct interface and integration. For example, the ICS does interface to some degree with General Accounting System (GAS) but operates independently of other system components such as 25X1 System integration standards normally relate to the identification of external and internal systems with which computerized interface is desired together with software compatibility requirements. An external system interface might provide a capability to bridge data exchanges between ICS and MILSTRIP, 25X1 DIDS, DAAS, and other systems. Contrastly, internal interface might be expressed In terms of computerized bridges between ICS and .T*1 Approved For Release 2005/07/12 : Clt-RDP85-00988R000700020001-3 4. Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 CONIF, and other internally programed systems. The chemistry of integrated systems demands hardware/software conpatibility because modularization requires that the output of the relinquishing nodule be formatted for input to the receiving module. System integration standards also influence hardware/software system selection. For example, feedback loops are normally designed into highly automated systems in order to reduce routine repetitively performed clerical operations. A feedback loop nay consist of a prepunched IBH card containing DCN, stock number, location, and quantity ordered for release by depot personnel. After pulling stores the warehouseman inserts the prepunched card into a card reader and keys the quantity released into the reader. Similarly, keying operations are performed at each discrete control center within the job order stream to provide for system update. Scope and Intent: The scope of research effort described in this study was limited to a cursory analysis of seven stand alone systems identified in Appendix H; namely, AIMS and ICS. Stand alone systems serving similar property management and control objectives are normally more costly to maintain and operate than integrated systems and are generally less efficient. These high cost and low performance factors are frequently attributable to several causes; first, input and output information flow streams cannot be efficiently automated in stand alone systems due to incompatibilities in programming language and other factors; second, considerable data redundancy is Approved For Release 2005/07/12 : GI4-RDP85-00988R000700020001-3 25X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 " essential to the operation and maintenance of stand alone systems because the self-sane data elenent must be replicated in multiple file structures; third, components comprising the stand alone network must be programmed separately thereby augmenting overall development costs and; fourth, stand alone systems compete for scarce computer resources, thereby degrading response times and performance. The intent of this study is to determine whether or not ICS is organized for efficient and economical operation. J. Characteristics of Inventor, Management stem: ICS is a stand alone system because of its isolation from other computer- ized internal systems. Also, ICS currently lacks the capacity for direct inter- face with the Defense Integrated Data System (DIDS), the Defense Logistics Services Center (DLSC), the Defense Logistics Agency (DLA) and other external computerized systems which furthers its estrangement. Isolation has also encouraged the design of internal stand alone systems such as These systems lack the capacity for direct interface with one another and with ICS thereby completing the circle of isolation for the conglomerate of systems involved in inventory management and control applications. Architectually, these systems are roughly comparable in terms of data base content, however, the systems do diverge in the retrieval or report generation node of operation. This divergence is attributable to the fact that one system may be designed to support property budget and planning 25X1 objectives while another system may be designed for financial 25X1 property accounting control (example - '71-7 Approved For Release 2005/07/12 : C1A-RDP85-00988R000700020001-3 25X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 .; 1 Z'Alr? Data element differentiation does exist within this system framework, however, differentiation appears more definitional than real. For example, relies on a stock number (SN) as the key descriptor for updating and retrieving data from the system. 25X1 number (REID) and 25X1 25X1 relies on the reference identification relies on the reference number (RENO). Establishment of the stock number as the key descriptor for interchanging data between these systems would provide an initial step in constructing the ladder of standard 25X1 ization. Further illustrating the gulf in these systems are data elenents used to identify user installations. or activity codes maintained in Finance registers. Another nay assign an Identifier from internal logs. These identifiers are of markedly different configuration than those maintained by Finance. Obviously, standardization of location codes is another requisite problem as well as the design of an Certain data elements resident application. to the resolution of the definitional integrated system. 25X1 in the system network are unique to a given rates are commingled with management oriented data elements. The design of a separate mini-computer system to handle operationally sensitive information offers one viable alternative to this problem. Similarly, the design of a system providing corridors for the passage and retrieval of data within the same system network offers a second potential alternative; provided, OTS is the only component capable of triggering sensitive data flows. '"171 Approved For Release 2005/07/12 : CIARDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 , The seven stand alone systems analyzed in this study were designed to record materiel acquisition, storage, and distribution actions. Secondary objectives such as the capability .oef track equipment locations on the basis of serial number, together with historical profiles, were designed into certain of these systems. Essentially, systems designed for property management, tracking, historical, and financial property accounting purposes are dependent on data elements common to most inventory management systems. These systems trap unit price, characteristic data, stock numbers or alternate identifiers, location, date received, etc., which provide a capability for generating output reports for a wide range of property management and accounting purposes. The majority of these systems are organized to generate property distribution reports on the basis of geographical area and projects or activities within geographical area. Reports are also subdivided in accordance with equipment categorization e.g., receivers, transmitters, audio, and associative reports. Generation of financial property accounting and other reports are easily pro- grammed in this environment and make design of an integrated system a feasible objective. The present system contains no conduits for the computerized interchange of data. This attribute has virtually isolated one system from another and fostered evolvement of even more sophisticated systems along the periphery of the network. Host elements of this network commenced as low level data processing systems. Complexity was introduced through enhancement and today several of these systems are equal to or surpass ICS in capability and Approved For Release 2005/07/12 : CIMRDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 -.A performance. Moreover, these systems perform many operations currently per- formed by ICS and are therefore duplicative systems. For example, records dues-in, dues-out, in-transit, etc., transactions in response to 25X1 the receipt and processing of supply actions. also relies 25X1 on computerized flags to signal reorder point violations. ICS has been moderately enhanced since it went operational. These enhancements did improve ICS efficiency. This inward focus discouraged development of computerized data paths to external systems notwithstanding the fact that data elements residing In ICS are coincident with data elements housed in other systems. Moreover, reports generated by these systems are dependent on similar data elements which removes another obstacle to integration. 6. System Data Flow: Data entering ICS is trapped in internal file structures even though certain of this data is manually keyed into other systems. Information flows depicted In Appendix H indicate that ICS generates no computered data flows to companion systems. Four of the seven systems account for the majority of ICS initiated transactions processed; Maintenance25X1 of these four systems creates uneconomical clerical burdens because data elements contained on shipping documents are manually keyed into companion systems. Given this network, systems reliability factors are also degraded because computerized data flows are nearly error free whereas keying errors are an essential property of manual operations. Accordingly, duplicative input costs, together with degraded reliability, affect performance levels of this system. Approved For Release 2005/07/12 : C1A1RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 The seven systems were coded separately in several programing languages which cannot help but hamper design of an integrated system. Considerable manpower was expended in the original design and enhancements to each of these systems. The alternative, design of an integrated system would call for a heavy commitment of manpower in initial design because of interface requirements associated with external and internal systems with which ICS interacts. Inter- dependencies of these systems, in concert with comparable data processing objectives for each of its members, make design of an integrated system an economical option. The integrated system has the potential of eliminating duplicate development costs as well as reducing clerical overheads. Another advantage is that systems now performing low level data processing tasks would be enhanced through the introduction of an integrated system. This is because benefits of standardization and integration are automatically telescoped to all components of the system. ICS is programmed in "Generalized Information Management" System (GIMS), data 25X1 base language. is programmed in NIPS (National Military Command System Information Processing System). ICS invokes GINS software in response to supply actions, queries, report generation requirements, data element change, and associative transactions. Activation of GPIS is costly in terms of both manpower overheads and utilization of the computer resource. After (IMS transaction processing is complete, the system is deactiviated and NIPS soft- 25X1 ware is invoked to update files because this system is separately Approved For Release 2005/07/12 : ailDP85-00988R000700020001-3 25X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 ? maintained. The continual invocation and swapping of separate software packages to drive this complex of systems is not only costly but also grossly inefficient. Another source of inefficiency and excessive cost derives from the fact that file structures are duplicated within the total system network which augments data storage requirements. Appendix I identifies source documents containing data entering ICS and systems. The chart tracks data movements between these systems. The front end assembly of the computerized system is the Supply Management Branch, Supply Division. Requisitions are validated for terminal input by SMB personnel for stock releases at this point. The next entry in the mechanized chain is issue verification which is initiated by Depot personnel. Shipping documents are manually prepared with distribution to OTS and consignee. 4usi OTS systems personnel extract data from shipping documents and add data elements 25X1 unique to the system for update purposes. The final step in this processing chain is consignee acknowledgement that shipment was received. Four incidents of input exist in this structure which involves essentially the same or comparable data elements. Assuming availability of an integrated system OTS files would be updated on the basis of original SIM inputs with unique data elements being entered by OTS. Thus, the integrated system has the potential of reducing clerical overloads while at the same time enhancing organizational efficiency. The stand alone system network promotes inefficiency and provokes excessive maintenance and operation expense for five reasons; first, the 'AIY1m,1 Approved For Release 2005/07/12 : GI1l3RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 several systems comprising the network must be separately programmed; second, the manual keying of common inputs for updating each of these sytems increases rather than decreases manpower burdens and computer costs; third, file re- dundancies are replicated throughout the network which appreciatively in- creases data storage and computer utilization costs; fourth, yields associated with integration are forfeited in the autonomous system network because enhancement must be implemented separately which consumes manpower and increases computer utilization costs and; fifth, the continued activation and deactiviation of different software systems essential to the maintenance and operation of this complex represents an extremely costly processing alternative. Another cost associated with this autonomous system complex is that the system nay saturate with concomitant degradation in response tine. This degradation factor, in turn, discourages enhancements because more computer time and memory must be committed which has the potential of further aggravating an already critical situation. 7. S sten Interfaces Document Generation, and Decision Making Potential of Automated Systems: Computerized inventory management systems normally improve response times, increase performance capabilities, reduce hard copy documentation, mechanize the flow of information between components of the network, make low level decisions and mechanize repetitively performed tasks. Computerization has modified perceptions of audit trails in the sense that hard copy documentation is no longer required to support transaction data preserved in computer I Approved For Release 2005/07/12 : C,111413DP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 storage. Given this situation the first objective of computerization is, more often than not, the elimination or reduction of hard copy documentation which exerts a correlative effect on system manpower requirements. Considered in this context four criteria are available to measure the impact of computer- ization; first, the degree to which documentation has been reduced or eliminated; second, the extent of overhead reductions resulting from diminished filing, mechanization of repetitively performed tasks etc.; third, the improvement of response time resulting from computer query in contrast to manual file search; and fourth, the degree to which low level decision processes have been auto- mated such as the generation of purchase order requests in response to reorder point violations. ICS must engage in message exchange with highly sophisticated external systems such as MILSTRIP, FEDSTRIP, DIDS, and DLA. These systems contain sentinels such as router indicators and addressee codes for directing and controlling the flow of data within the computerized network. Logistics has not attempted to develop automated interfaces with external systems, therefore, information passing over this network must be manually processed. Message content of transactions passed over this network either reside, or could be programmed to reside, in the ICS data base. Conversely requisition status information generated via MILSTRIP/FEDSTRIP is received in punched card format and is manually processed. Other external systems are also programmed to generate output in machine sensible format. For example, the Cataloging Management Data Notice (Mud) constitutes a most significant source of Logistics Approved For Release 2005/07/12 : C1#51RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 r.'711.1 CID data identifies the Depot responsible for stocking materiel, unit price, unit-of- issue, etc., and all changes appropriate thereto. C=I feedback is received in machine sensible format, reduced to hard copy and, where appropriate, manually keyed for purposes of updating ICS. ICS was not designed to interface with external systems. The one exception to this statement is DLSC's manufacturers part number to stock number cross reference guide. ODP was able to program this interface quickly because those few data elements were involved. ICS's isolation from other systems, both external and internal, has prevented Logistics from harvesting other benefits associated with computerization. ICS cannot be classified as other than a passive system by any evaluative standard. The system is neither designed to respond to the receipt of messages in machine sensible format from external systems nor is it capable of passing data in machine sensible format to internal systems such as etc. ICS responds only to manual keying via predefined menu. This limitation discourages mechanization of repetitively performed tasks and reduction of hard copy documentation. ICS query capabilities are definitely superior to those involving manual search, however, the system is not capable of tracking the status of supply actions from date of entry into system to date of exit. This lack of tracking capability lowers performance thresholds and degrades yield. ICS is not capable of affirmative response to the receipt of transaction data. Data keyed into the system does trigger the release of the Depot Issue Approved For Release 2005/07/12 : Clip6-13D08500988R000700020001-3 25X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Notice. This is the only document associated with the materiel release process which is computer generated. Shipping document and purchase order preparation remains a manual process. Horeover, no effort has been made to harness the computers capability to record, monitor, and schedule the movement of materiel transitting the supply pipeline. For example, predefined routines could be invoked for purposes of scheduling shipments from point of receipt through test and inspection, packing and crating, and transportation. One outgrowth of this capability is that it provides a basis for consolidating materiel release actions in accordance with destination and shipment mode. Advantages associated with this class of system are five fold; first, clerical personnel can be displaced; second, work flows can be scheduled; third, repetitively performed tasks, such as shipping document preparation are automated; fourth, bottlenecks in the supply pipeline can be identified with relative ease; and, fifth, performance standards can be developed for purposes evaluating efficiency. 8. Quantitive Attributes of System Operations and System Performance Characteristic: As of 4 Hay 1977, the Property In-Use (PIU)* system consisted of of 25X1 25X1 definition departs from the official description of PIU under which Logistics maintains accountability for materiel in the departmental area and designates a responsible officer to maintain property control. e Approved For Release 2005/07/12 : CIRORDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 N t Appendix J shows that the majority of these accounts are capitalized at $500,000 or less. The average capitalization, expressed in terms of the arithmetic mean, amounted to approximately $80,400 whereas the median capitalization for the array was $43,575. Accountable property consigned to these activities is normally divisible into office machines, office furnishings, house- hold furniture appliances, 25X1 Classifica- tion of the PIU system in accordance with value distribution factors indicate that eighty two percent of the total number of PIU accounts control only seven percent of the dollar value of materiel maintained in the PIU system. The most salient characteristic of this component of the system is that resources allocated to it are not subject to rapid turnover and are quantitatively relatively static. Materiel replacement and retirement programs are predominately responsible for supply actions initiated by these activities. Computerization of this component of the Agency's inventory management system as a prime design objective is probably 25X1 not justifiable in terms of anticipated yield. materiel residing in the PIU system. These system components differ both struct- urally and in terms of mission objectives. Resources allocated to small PIU accounts are relatively fixed and used primarily for internal support. Large accounts are primarily responsible for the Logistical support of other projects. Approved For Release 2005/07/12 : CI8RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 25X1 evidenced in attachments to Appendix K. The remaining thirty one percent consist of activities in which resource allocation is for the direct support of internal operations such as !WIC, ODP and others involving high capital investment. These two components of the system command maintenance of highly sophisticated and responsive inventory management systems, a point especially applicable to activities engaged in supply distribution. Otherwise personnel responsible for materiel management would not be aware of what materiel was available for issue at what location. 25X1 means. Combining he sixteen percent capitalization factor applicable to fixed plant with the forty eight capitalization in mobile resources reveals that sixty five percent of the total dollar value of assets maintained in the PIU system are managed via computer means. Analysis of the PIU system confirms that most significant components have already been computerized the essentiality of which is not open to challenge. Given this situation, the area offering the most potential for advancement is that of designing an integrated, unified, and economical inventory management system tailored to meet multiple user requirements 1 `1 Approved For Release 2005/07/12 : C943DP85-00988R000700020001-3 25X1 25X1 25X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 net"7r/ruk-71..- j ICS processed approximately 6459 transactions monthly in FY77. Transaction clusters included in this count are identified in Appendix L, page 1 and Appendix M. Figures set forth in these two appendices confirm a significant reduction in workload between June 75 and Oct 77. Transactions initiated in external system elements were roughly comparable to those of ICS in FY77. Transaction counts applicable to external systems contained biases not easily identified for removal. 25X1 These biases were compensated for by scaling down external system transaction counts to arrive at more realistic comparability factors. For example, processed 790 transactions weekly which was reduced to 500 in order to reduce bias. Another bias contained in PIU transaction counts is that receipt of property must Lie acknowledged in certain PIU systems which results in two inputs per transaction. 25X1 No effort was made to eliminate this bias. Transaction counts for five external systems were included in the study, namely, Transactions for these systems averaged 6370 monthly contrasted with 6450 for ICS. These figures demonstrate that input burdens are nearly evenly divided between external and internal systems. Comparative dollar value figures for the PIU system and ICS were formulated on the basis of total system and select system segments. As of 30 December 1)77, the dollar value of property positioned having a book value of ? 71 r."'" Approved For Release 2005/07/12 : GIEGRDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 - 25X1 ICS data processing burdens equate generally to those of four major external PIU systems tasked with resource management responsibilities. The accuracy of this proposition can be validated within the context of three standards; first, counts of transactions initated and processed; second, comparison of values associated with resources maintained in ICS and the four external PIU systems, and; third, the nm:)er of line items maintained in each of the several systems25X1 rT, r, 17.1 I Approved For Release 2005/07/12 : C1413DP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 . 1 25X1 The actual ICS inventory count total of 13257 line items, degraded by a estimated factor of one third to eliminate expendable supplies and materiel for which there is no demand, leaves an active non-expendable inventory count estimated at 3332 line items. Contrasting these two figures, it is evident that the four principle PIU accounts of the system are responsible for the maintenance of more line it 25X1 than ICS. Ho effort was made to eliminate duplications in PIU accounts. Costs associated with the operation of external systems were not available for analysis. Projected ICS operating costs are compiled periodically by ODP and accounted to $815,000 in FY70 which includes manpower development costs, (see appendix P). Computerization of companion systems entailed initial development and implementation expense as well as operational costs. neither initial development nor system maintenance cost for external systems were available for purposes of documenting these factors in this study. ODP does, however, compile estimated maintenance cost data for each component involved. Data processing costs directly attributable to the operation of the external system complex are probably less than those associated with ICS. This estimate is based on the fact that updates are batched in external systems whereas updates are processed on-line in ICS. Generally speaking, the batch mode is more economical and efficient than the on-line mode. Moreover, external systems rely ,1171171' Approved For Release 2005/07/12 : ClaRDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 ,1 on different software packages presumably with different levels of efficiency to drive their system. The absence of external system cost data together with other factors forbid development of meaningful comparative cost relationships. Notwithstanding these limitations several general conclusions regarding cost and efficiency can be stated; first, initial development and implementation costs are incurred for each computerized component of the system which increases overall development cost; second, components of the system generate similar input/output streams via manual means which increases clerical overhead and promotes inefficiency in hardware and software utilization; third, maintenance of autonomous systems generate file redundancy in the network which is costly and degrading in terms of performance and response times, and; fourth, enhancements in one system cannot be telescoped to other systems without expensive redesign. Contrastly, integrated system enhancements are automatically communicated to all system elements at minimal expense. The capabilities of any system, whether hardware or software, are finite. Assuming boundaries of these systems are violated, additional computer resources must be appended or the system must be redesigned in order to better use the computer resource. Data base management systems undergoing frequent enhancement ultimately become potmarked with hastily devised routines required in file maintenance operations. As saturation points are approached minor enhancements; a) . require excessive applications of manpower and commitments of time; b) create a need for additional storage; c) degrade response times and; d) quickly transform the system into the marginally efficient category. Seemingly, enhancements to ICS `11 Approved For Release 2005/07/12 : C*3RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 F ? g ,;gp. are already becoming more difficult to implement and may force the system into a static state. Certain computerized PIU systems surpass the capabilities of ICS. Whether or not ICS has the potential for enhancement to match these capabilities was not a subject for affirmation or denial in this paper. ICS probably cannot be enhanced to the extent necessary to meet assocative data processing requirements of procurement and depot operations. Accordingly, the path of the future must be in one of four directions; first, redesigning Girs in such a manner that interactive data base structures can be maintained; second, displacing GINS as the propelling software system; third, development of a distributive network system in which mini-computers are programmed to perform highly specialized tasks so as to free the prime computer system for higher order tasking or; fourth, combining certain of these approaches in future design. The concept of distributive networks is easily described. Mini- computers are programmed to serve as both terminals and local processors. Data processing operations in this environment are highly structured which involves finite tasking for both the prime computer system (PCS) and the terminal processor (TM. For example, PCS's are frequently programmed to transmit supply actions for release of stores to the TIP. The TIP is programmed to generate depot release orders and to record feedback confirming completion of the stores retrieval operation. Next the TIP prepares a summary of materiel scheduled for shipment in accordance with both consignee and shipment mode and triggers the release of shipping documents without human intervention. Distributive network systems are designed to free PCS's from time consuming tasking thereby ' 701.k7 Approved For Release 2005/07/12 : CINRDP85-00988R000700020001-3 25X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 z enhancing - enhancing response capabilities of the system. Appendix Q identifies components of the organizational inventory management and control system, both current and planned. This appendix confirms that future planning simply perpetrates the current concept of designing systems capable of meeting requirements specified by the component involved. Traveling this pathway rendors computerized linkage between similar or comparable systems a difficult objective to obtain. This has encouraged development of self contained systems because ICS lacked the capability of meeting total system requirements. This outcome can be verified on the basis of comparative workload factors covering a three year interval. For example, ICS processed 9334 monthly transactions in FY75 (Appendix L), 6402 monthly in FY7G (Appendix R) and 6450 monthly in FY 77 (Appendix M). Part of this drop is attributable to declining workloads. While external components were unable to provide reliable workload factors for the three year tine interval it was generally conceded that growing numbers of transactions were processed. This assessment adds credence to the proposition that the organization nay be moving in the direction of a decentralized support system because of ICS limitations. The trend toward decentralization can only be reversed through development of an intergrated system capable of meeting system data processing requirements. Declining rates of issue are believed attributable to three factors; first, shrinkage of global support requirements; second, Office of Communication's increasing reliance of direct procurement for printed circuit boards, nodules, and subassemblies processed as Repair and Return Materiel (RRM) Approved For Release 2005/07/12 : GIARDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 0-74' 't? in the supply system; and third, the growth of self contained systems which has encouraged development of a microcosm of inventory management and control systems. Direct procurement of this un circumvents the need for maintaining formal accountable records because acquisition costs are expensed at tine of receipt and issues need not be formally documented. RRM, in-turn, displaces numerous individual components such as diodes, transistors, vacuum tubes, capacitors, etc, comprising the circuitry of older generation equipment. Naturally the shift.to RRM precipitated a decline in the number of line items maintained in the system for the support of staff communications equipment. The most recent OC audit report noted that accountability was not maintained for non-expandable RRM and recommended that OC "comply with prescribed accounting procedures for non-expendable property or obtain the approval of Director of Logistics for the current deviations from the regulations". (Appendix S, page 4) Prior to the advent of printed circuit board and nodularization technology, equipment update programs, or the introduction of advanced equipment, exerted up- ward pressure on the number and quantity of operational spares maintained in the system. Previously, the Item Identification Section, SD, metered the number of new items introducted into the supply system. Counts associated therewith provided a reasonably accurate barometer for monitoring the impact of equipment replacement or update programs on the system. Compilation of this statistic was suspended in the recent past, therefore, the impact of equipment programs on the supply system cannot be accurately measured. Personnel assigned to the Item Identification Section advise that the number of new items maintained in the system as operational spares has been reduced from a constant flow to a dribble. Accordingly, it is " r 771,1 , Approved For Release 2005/07/12 : CWRDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 reasonable to project ever declining workloads in the Supply Division unless action is taken to enforce centralized control over property acquisitions and distribution programs. The most recent OL audit report recognized the impact development of self con- tained systems and enhancements thereto have on efficiency and system development and maintenance costs. These observations were made manifest in Appendix T, para- graph 7, page 4, wherein it is explicitly stated that the duplication of effort required to develop individual automated property systems is uneconomical and inefficient" and, further, that "the development of automated accounting systems should be centralized in the Office of Logistics". The posture of the audit staff regarding responsibility for management of the Agency logistic resource is that "Agency regulations assign responsibility for contol of property to the Office of Logistics" (Appendix T, page 3, paragraph 5). Implicit in this delegation is the responsibility for designing the most efficient, economical, and responsive system tailored for total system applications. The report implies that the integrated system route is the most favored for reasons of efficiency and cost. 9. ADP System Planninf7 for Future - Capabilities and Limitations: Current planning seemingly encourages design of stand alone systems. Several systems scheduled for activation, or in the process of review, are identified in Appendix Q, the description of which confirms this' proposition. The Federal Automated Requisitioning System (FARS) represents one such system ODP has defined specifications for this system which provides an interface with elements of DOD systems. FARS's primary data processing objectives are; a) to relay requisitions via electronics means, to appropriate DOD or GSA L'3:11firi...: Approved For Release 2005/07/12 : Che472DP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Inventory Control Points for supply action; b) to update both ICS and FARS files on the basis of feedback relayed via AUTODIN, and; c) to generate formaVld copies of receiving reports for Receiving Section, 25X1 and others. Activation of FARS involves preparation of outgoing messages in accordance with requirements specified in the Defense Automated Addressing System (DMS). This facet of the program represents low level tasking. Feed- back from Inventory Control Points is in machine sensible format and consists of status information such as date materiel is due-in, price changes, sub- stitutions, cancellations, etc. Initially, FARS will not provide the capabi- lity for instantaneous ICS file update, because processing methodologies for cross referencing WASH stock numbers to federal stock number for directs as well as the problem of substitutions has yet to be resolved. The FARS feasibility study recommended acquisition of a mini-computer for automating that application. Conceptually, FARS involves the maintenance of two data base systems; namely ICS and FARS. The study is silent with respect to file maintenance methodologies, however, it appears evident that the same data elements are maintained in t;oth systems. Tuning this network requires that both systems be updated in response to the receipt of status information such as acquisition price differences, unit-of-issue change, substitutions, and other system updates such as cancellations, order quantity changes initiated by requisitioners, etc. As near as can be determined, the FARS's development plan commands concurrent update to two independent data base systems in order to maintain synchronization. Assuming that system objectives have been properly described and that processing Approved For Release 2005/07/12 : W.DP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 methodologies have been accurately defined, installation of the mini-computer will increase rather than decrease system processing burdens because of the dual input doctrine. One anticipated benefit associated with the maintenance of duplicate systems is that response capabilities will be enhanced because FARS will be accessed for routine queries which relieves GUMS of that burden. Mini-computers are routinely programmed to execute data processing routines where large scale data transformation is involved. Consolidation of line items in accordance with consignee and shipment mode for automated generation of shipping documents illustrates data transformation. Similar processing methodologies apply to automation of the packing and crating nodule. Line items consolidated on the basis of consignee and other criteria in order to schedule multiple line item packaging box emp9 data transforuation in this application. Data transformation is alien to FARS because updates' simply replace one value with another. The FARS feasibility study explicitly defines a requirement for the preservation of historica data which commands concurrent update of FARS and ICS. Apparently, FARS is not being designed to decrease ICS main frame tasking. This being the case, benefits accruing from FARS`may have been matched or even surpassed through ICS redesign. Interdepartmental Support Branch's off-line text processing equipment is programed to generate the Form 2216, and the IBM punched card needed for the initiation of data transfers over the AUTODIN system. Data transposed to these documents are retrieved from; a) the ICS data base; b) data elements identified on the incoming requisition or amendments thereto and; c) microfiche files maintained in Supply Management Branch. ICS redesign has the potential of automating the preparation of the Form 2216 and formating messages transmitted - , Approved For Release 2005/07/12 : CIP:A:ADP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 over the AUTODIN system because data elements contained therein either reside, or could be programmed to reside, in ICS files. The possibility of upgrading ICS to perform this very essential reproduction task offers an alternative to the installation of a mini-computer system. While assignment of the forms production task to the mini-computer has the potential of freeing the prime computer system for alternate use the savings may not offset cost associated with the maintenance of two systems. Office of Communications relies increasingly on the acquisition of organic spares for the maintenance of staff communications equipment. Printed circuit boards and other modularized components of the system are frequently unique to that equipment which is not marketed commercially. Uniqueness poses pro- visioning problems with respect to maintenance of operational spares because production necessitates retooling for each order received. The economics of this situation may favor the purchase of sufficient operational spares to maintain equipments over their estimated life expectancy. Recent trends affirm that organic spares are in fact being purchased on the basis of equip- ment mortality rat. Extrapolating this trend into the future, it seems reasonable to predict increasing reliance on one time purchase of operational spares. This attribute of system operations has shifted processing priorities from these associated with stockage of spares to that of maintaining a quick response posture because stockage of organic spares is presupposed. Office of Communications solicited OUP assistance in the development of a Repair and Return [lateriel System (REIS). This program has already been Approved For Release 2005/07/12 : CIMIDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 I 4,4-.? debugged and will become operational after peripherals are installed at The system was designed to control approximately 15000 line Items with an estimated transaction frequency of 2000 per month. OC envisions purchase of organic spares from direct materiel procurement allotments. This acquisition means circumvents the necessity of maintaining formal accountability in the OL Logistics System. The most recent audit report, however, took exception to the storage of high dollar value property without maintenance of accountability. This report stated that "there are about 5000 property line items at the Central Repair Facility (CRF) which are defined by regulation as non-expendable, but are administered as expendable property". DC's planned computerization of REMS is believed to be in response to exceptions defined in the Audit Report. Apparently, OC intends to purchase ever increasing quantities of repair and return property from direct procurement funds which has the effect of skirting OL's formal accounting system. REMS is the first application in which a directorate, other than Logistics, assumed responsibility for materiel required in support of non-sensitive operations. PreceLnts for delegating responsibility for resource management to external components are available for reference, however, these examples have normally been associated with operational projects or programs affecting national security interests. Such projects may be endowed with internal support mechanisms to avoid external referrals. Property procurements incident to the maintenance of REM are financed from CIA appropriated funds, therefore, do not qualify for exemption from normal operating procedures. OL has traditionally , la;.suill 4 Approved For Release 2005/07/12 : CLDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 been tasked to manage and maintain accountability for these resources. Implementation of REM will sever OC's umbilical chord with OL for an important segment of materiel maintained in the supply system. The impact of separation may be catapulted into other components of the system. For example, OC cannot warehouse organic spares without a storage capability. Considerable pressure may-be exerted on OL in the future to meet these space requirements. Moreover, personnel, peripherals, and secure work area requirements inevitably lead to separation which constitutes duplication. Perhaps the most serious disadvantage associated with maintenance of autonomous supply management systems is that they disenfranchise incentives for maintaining a comon support capability. The cost of maintaining separate yet comparable systems is also prohibitive. Systems Analysis Branch, OL, examined the feasibility of computerizing certain routines in the Procurement Division. This study concluded that computerization was economically feasible. Further it was recommended that the procurement subsystem be interfaced with CONIF and ICS in order to fuel that subsystem with information resident in other systems. Procurement Division declined acceptance of the integrated systems approach. Apparently, rejection was based on the proposition that the approach was not responsive to requirements. Specifications were tan defined to guide formulation of a follow-up study. Essentially these requirements reduced to those associated with a mechanized forms management system having memory modules capable of capturing and reproducing history of procurement buys. Subsystem specifications for procurement are being defined without reference to data processing requirements ?, I Approved For Release 2005/07/12 : GIA2RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 of associative systems which eliminates the need for interface. Ramifications of this approach will be an additional flowering of disjointed systems. Logically, procurement subsystem requirements can not be framed without reference to data processing requirements of the larger universe. The present system is only marginally capable of tracking supply actions as they pass through that system largely because of the autonomous configuration of systems comprising the network. Supply Nanagement Branch identifies control points assigned pending purchase actions (IDSB, Gen Proc. Contracts, etc.) and 25X1 fingerprints that assignment in the ICS data base. This entry constitutes one of a chain of entries essential to the maintenance of a system tracking module. Next, Data Access Center personnel enter due-in dates in ICS suspense files on the basis of dates annotated on purchase orders prepared by Procurement Division. This combination of entries in ICS provides a limited tracking capability, however, tine gaps inherent in this system preclude automated response to requests for status information. For example, SHB may have processed a requirement to Procurement for purchase action and updated ICS so as to record referral. Tine Ialses between the date referrals are made to Procurement and the date completed purchase orders are received at DAC nay be considerable. Time lapses, together with the fact that the system is dependent on the transmittal of manually prepared documentation rather than computerized transmissions, normally requires that both manual and computer files be accessed in order to ensure integrity of response to requests for status information. The integrated system provides a capability for bridging time gaps built in manual systems. This bridging process facilitates response to requests for Approved For Release 2005/07/12 : Cf4.31DP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 nr711 .eri a status information and provides the basis for the development of a procurement management system. The integrated system provides a vehicle for; a) flagging delinquent procurement actions; b) generating formated follow-up letters to suppliers in response to time frame suspense violations governing delinquent actions; c) generating multiple line item purchase instruments based on sorts by vendor, etc; d) identifying the Procurement Officer assigned responsibility for purchase order execution; e) modifying item descriptions, stock numbers, manufacturers part numbers, unit-of-procurement, price, order quantity, due-in dates, and other data maintained in the system in response to feedback from vendors, requisitioners and Supply Division personnel; f) measuring workloads handled at select procurement control points of the system; g) tracking the movement of procurement actions within the system so as to provide automated responses to requests for status information, and; h) such other management objectives as may be designed into the system. Normally, requests for materiel stocked in the system are not bottlenecked because response tines are relatively short for stock releases. For this reason procurement lead tine represents the volatile element in the process the control of which holds promise for yield. Integrated process control systems require that data be sequentially keyed into the computerized system. Illustrative of the sequential chaining of data elements is the procurement module which is capable of; a) acknowledging and time dating receipt of requirements for purchase action; b) identifying the Procurement Officer responsible for purchase order execution, together with the date assignment was made; c) recording vendor selection and the date materiel is due-in at destination; d) consolidating multiple line items on a single ? L Approved For Release 2005/07/12 : CI4DP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 purchase order; e) cross referencing Document Control Number to Procurement Instrument-Number for tracking and retrieval purposes; f) modifying data elements resident in the system in response to substitutions, price variances, and other changes occurring subsequent to initial entry; g) time stamping date materiel was actually received which provides a criteria for vendor performance evaluation and; h) accepting and time stamping receipt of partials and split orders for identical items between two or more vendors. Efficiency of procurement modu)e operation is related to the kind of feedback mechanisms available for update and the degree to which the computer can track, sort, con- solidate, and flag delinquencies for the attention of management personnel. Certain data elements resident to CONIF are also maintained in ICS. Examples of dual residency are; a) order quantity; b) acquisition price; c) item characteristic data; d) stock number; e) manufacturers part number; f) date due-in; g) etc. Frequently, this date is modified in the negotiation or production process which prompts secondary update. Formal extension of a due-in date illustrates a secondary input requiring concurrent update of both the COIF and ICS because data ements are resident in both systems. Implementation of an independent procurement subsystem nay require that certain initial transactions, together with associative secondary updates, be manually keyed into three systems; namely, ICS, CONIF, and the autonomous procurement subsystem. Synchronization in this sytem network requires concurrent inputs which represents an objective beyond the realm of realization. Because of this limitation the impact of designing an independent procurement system will; a) multiply clerical burdens required in system maintenance; b) result in an additional proliferation of ? Approved For Release 2005/07/12 : CAIN4DP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 '77:77s77r!fil 3..;; data base structures; c) further degrade reliability factors because of high error rates and lack of synchronization; d) require the installation and maintenance of duplicative hardware/software, and; e) degrade system response times. Computer tasking requirements of the Procurement Division may well justify the installation of a mini-computer to consolidate line iters in accordance with vendor and to generate purchase orders for transmittal to vendors, provided, the design of the mini-computer is an adjunct of the integrated system. ODP recently implemented the Agency Automated Weapons Control System (AUCS). Computerization of this application involved manual interfacing between ICS and AWCS. Seemingly, updates recording the issuance of firearms will be pro- cessed against both ICS and AUCS files with serial numbers being added to the AWCS entry. Permanent separation of these systems is ensured unless both ICS and AWCS are redesigned because AUCS is coded in NIPS and ICS in GINS. Accordingly, AWCS's design objective was not perceived to be that of an integrated system but rather that of a small independent system. This notwithstanding the fact that integration has the potential of eliminating dual inputs, improving system response time, enha'ocing reliability of system operations, and avoiding computerized maintenance of nearly identical segments of the total system. OL requested that Systems Analysis Branch, OL, automate the Vehicle Information Manangement and Control System. It seems reasonable to predict that this application, like its pre- decessors, will also be programmed as an independent system. This outcome will further augment the population of autonomous sytens maintained in the inventory management network. 7 3 Approved For Release 2005/07/12 : GIARDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Inventory management responsibilities cannot be efficiently executed in a totally decentralized environment because elements of the stand alone system network perform essentially the sane tasks. Decentralization involves duplicative; a) clerical and management skills; b) hardware/software systems and; c) capabilities to initiate and control message flows throughout the network. The totally decentralized system is fraught with yet another danger; namely that the decision to integrate may necessitate design pf an entirely new system because existing resources such as hardware/software cannot be efficiently and economically organized for integration. 10. Properties and Performance Capabilities of Integrated Systems: The proliferation of systems involved in inventory management and associative applications are neither organized to track supply actions nor to monitor, performance of the system via tine frame suspense routines. Tracking modules are normally designed to record and monitor the movement of supply actions through predetermined points of the network. These control points nay span several functIonal jurisdictions such as inventory management, procurement, depot operations and finance. For example, Supply Hanagenent Dranch generates suspense ICS updates for non-stock materiel release actions prior to passing comrend and control to procurement. Procurement in turn, passes that same action through several discrete control points in that system prior to passing command 25X1 and control to DAC, and alternate receiving locations. Tracking modules monitor the movement of supply actions between nodes Approved For Release 2005/07/12 : 01A7RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 of the system whereas the time frame suspense nodule predicts time Intervals supply actions are expected to remain at select nodes or control points in the network. Stated another way, time frame suspense modules are designed to record arrival and departure times at control points and to estimate time lapses at each on the basis of past performance, current workload requirements, and resource availability. Systems designed for tracking and time frame suspense normally qualify as sophisticated inventory management information and control systems. These two nodules combine to provide a systems capability to; a) respond to requests for status information with little or no human Intervention; b) establish performance standards governing system operations together with the measurement of deviations therefrom; c) identify actual or potential bottlenecks in the processing chain; d) eliminate document processing and, where appropriate, filing require- ments at control points in the network and; e) extrapolate trends so as to maintain balance between projected workloads and resources required to sustain that lev.21 of effort. Tracking and time frame suspense modules cannot be efficiently annexed to autonomous systems because of discontinuous data flows. The stand alone system normally requires manual entry of data in order to activate the system; hence continuous and logic data flows arc interrupted if output of one system is passed to a companion system for manual update. This attribute renders the stand alone system network marginally capable of; a) computerizing repetitively performed I . Approved For Release 2005/07/12 : G1gRDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 ^,.1-.'"'?'"",7I 1:41 2% tasks; b) monitoring performance characteristics of the system; c) monitoring and recording the mover,ent of supply actions in the system; d) preparing advisories for management review in response to slippages in time frame suspense; e) conserving manpower and; f) quick and reliable response. Integrated systems are capable of generating whatever hardcopy documentation is required via the prime computer, or alternately, a mini-computer system. ICS is programmed to generate the Depot Issue llotice in response to receipt of transaction data. Other forms required in the materiel acquisition, storage, and distribution system are prepared manually. Computerization of ICS has reduced neither the number nor frequency of doucments circulating in the system. The was not designed to displac(25X1 a form but rather supplements data contained in the original requisition (Form 83) without actually displacing that form. Performance appraisals of ICS lead to the conclusion that this system has not succeeded in reducing manhours invested in document preparation and distribution and has automated no known process associated with tho management of the logistics resource. ICS's decision making capabilities are nonexistent. For example, lead tines together with acquisition cost analysis frequently determine procurement source for low value repetitively consumed supplies. Computers can be routinely programmed to preserve procurement lead times associated with the delivery of identical items from two or more vendors. Similarly, these systems normally capture and preserve acquisition costs for identical items available from two or more suppliers. Given the availablility of this Approved For Release 2005/07/12 : CiXRDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 n information, the computer can be programed to select the most advantageous procurement source given the tine element necessities and sterility of the requirement. High dollar value materiel is normally excluded from automated decision processes in order to reduce the probability of costly replenishment and programing error. Economic order quantities for materiel subject to repetitive demand can be determined on the basis of average turnover and other factors arrived at via the computer resource. ICS design does not; a) harness the decision making potential of the computer resource; b) provide for automated generation of documentation; c) transmit data between control points in the system on the basis of pre- defined decision rules and; d) interface with external systems so as to eliminate duplication. ICS, therefore, must be classified as a bookkeeping system which, from the standpoint of the total system, consumes rather than releases manpower for alternate applications and offers few manageriel yields. Computerized inventory management systems are capable of flagging repetitive demand.'' Several methods or combination of methods can be specified for the attainment of this objective; first, entry of part number, model number, or manufacturer is treated as mandatory to provide a capability for sorting and merging requirenents for materiel not managed in the system; second, requisitioners are held responsible for determining whether or not materiel is subject to repetitive demand and to code the ordering instrument accordingly and; third, components of the resource management system are tasked with the responsibility for 1761,,Ifi Approved For Release 2005/07/12 : CAtRIDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 identifying materiel to be stocked in the system either on the basis of requirement forecasts or actual consumption patterns extrapolated into the future. Generally the third alternative has been applied internally because reasonably accurate requirement forecasts are compiled for equipment and associative spares. This system removes the initiative for introducing new items into the supply system from Supply Division, and except for specific categories of materiel, vests that responsibility in cognizant offices. Cognizant offices are in a position to influence the structure and content of inventory. Still, the position of the cognizant office is one step removed from actual requisitioners. Separation nay represent an obstacle to efficient resource management because certain requisitioners consume resources outside the control of the cognizant offices of which they are a part. Given this setting, requirement forecasts may be formulated for; a) major equipment or operational spares incident to the maintenance of that equipment, and; b) strategic reserves maintained in a ready-for-issue condition to meet contingency situations. These forecasts may exclde collateral requirements for furniture, appliances, maintenance supplies, vehicular spares, hand tools, etc. Requirements for these items occur randomly throughout the system yet the present system is not organized to flag repetitive demand to ensure pursuance , of a rational stockage scheme. Another shortcoming is that requirements for materiel not maintained in the system may be assigned WASH numbers. This assignment precludes execution of sort and merge routines capable of identifying materiel subject to repetitive demand. Capture of Approved For Release 2005/07/12 : CA1RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 ? 11.. manufacturers part or model number for subsequent sort and merge re- presents the most practical and economic means for flagging repetitive demand. Comparision of obligations/expenditures against Materiel and Direct Procurement Allotments over tine offers a reliable index for gauging the degree to which the system is capable of supplying demand from inventory as opposed to purchase. Analysis of these two quantums definitely confirms that the percentage of demands supplied via direct procurement exhibits a steady increase. Expressed in dollar value terms direct procurement accounted for 57% of total purchases in FY76, 69% in Transitional Quarter, 77% in FY77, and 84% so far in FY78. Assuming present trends continue, approximately 85% of organizational requirements for materiel in terms of dollar value will be met' through direct procurement in FY73. The design of a system capable of flagging repetitive demand has the potential of reversing this trend by closing gap between direct procurement and replenishment. Minor applications computerized in ICS design are; a) S0111c locator system and; b) the generation of status reports to facilitate physical inventories. According to personnel the manual 25X1 25X1 locator system continues to be maintained in tandem with the automated system. The rationale underlying the maintenance of parallel-duplicative systems is apparently attributable to low confidence factors in the automated system. Displacement of one of these systems has the potential of reducing overheads. Analysis of the automated system designed to facilitate the conduct of physical inventories was not subjected to in-depth study. Approved For Release 2005/07/12 : C14\eRDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 1 A ,,. personnel have advised, however, that they periodically request inventory balances of all items within a Federal Commodity Class. Items selected for count are then manually selected from the composite listing so as to flag any deviations between actual and recorded balances. The computerized approach has the advantage of displacing the cumbersome system relied on at present and has the potential of; a) systematizing the physical inventory function; b) eliminating bias in the selection of items to be inventorad, and; c) ensuring that a representative cross section is covered in each count cycle. For example, algorithms allowing random selection of ten percent of items maintained in a given Federal Commodity Class might be considered representative whereas a five percent random might be applied to another Federal Commodity Class. 11. Cataloging interface: Item Identification Section relies on four primary sources of information in cataloging operations; first, maintenance and status Information received from DLSC in magnetic tape format; second, microfiche received periodically from DLSC identifying materiel maintained in the federal system; third, item characteristic and correlative management data contained on Cataloging Action Requests processed by Supply ilanagement Branch; and fourth, screening actions processed against the DLSC data base to determine if the item is a constituent of the federal supply system. Approximately fifty percent of the total number of managed items in ICS are identified by federal e, ktO. Approved For Release 2005/07/12 : CIReRDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 1 ,???9, F.A.1 ; stock number, therefore, the federal supply system constitutes a prime procurement source for materiel managed in the Agency system. This dependency pattern makes a partial or total computerized interface between ICS and DLSC a meaningful design goal. Information maintained in DLSC is segmented for storage and retrieval purposes. Segment A identifies an item maintained in the federal system by; a) stock number; b) item name code; c) FIIG number; d) criticality code, and; e) related data elements. Segment C of the DLSC data string contains manufacturers part number to stock number cross reference data. Decision rules and logic operations governing maintenance of the DLSC system are extremely complex. This complexity in turn makes development/len automated interface between DLSC and ICS a formidable design goal. DLSC transmits all data residing in a given segment in response to item updates. This transmission node requires that recipient systems have the capacity to determine which data element or elements residing on ULSC data string have been changed prior to internal system update. System update could be accomplished by overlaying ICS data elements with those contained in the segment. Continuity of system operations also requires that changes be preserved for reference purposes to ensure that they can be tracked and explained. ODP designed a program to present data elements contained in these segments in hard copy. Cataloging personnel manually compare hard copy entries with data elements residing in the data base and generate such menu updates as may be required. The only d Approved For Release 2005/07/12 : CI4NTRDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 computerized interface in the system is that contained in segment C which is, manufacturers' part number to stock number cross reference. This component of the system is automated. DLSC and ICS contain several incongruities in design. For example, item descriptions nay be housed in a field displacing in excess of one thousand characters under DLSC. Contrastly, ICS has allotted a maximum field of three hundred characters to retain descriptive data. Given this discrepancy in field length implementation of an automated interface would require that the GEIS record length be lifted or expanded, because a large percentage of items maintained in DLSC exceed this limitation. Another incompatibility between these systems is that of decimal point (unit price) management. DLSC's_decimal system is maintained in cents whereas GINS currently allocates three positions to the right-of the decimal which is mills. Accordingly, a computerized interface would demand invocation of a routine to add a non-significant zero to DLCS's incoming unit price prior to updating GINS. Alternatively truncation of the right most digit in the price field in GIZ would accomplish the sane objective. Further aggravating compatibility factors is the fact that DLSC drops cents for line items having a unit price in excess of, say, $10 million. Hateriel now maintained in the Agency system does not penetrate this barrier and is not expected to do so in the future, there- fore, the example is illustative only. Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 "4:)- Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 3 System incompatabilities, other than those described in preceding paragraphs, exist between DLSC and ICS. Reconciliation of these divergencies for computerized interface might prove prohibitive in terms of initial design and system maintenance cost. Moreover, a large per- centage of DLSC maintenance actions require cognizant office approval prior to acceptance and ICS update. These delays in the decision process would require that DLSC transaction updates be held in obeyance pending acceptance. Profiles of these interrupts can best be illustrated by example. The stock number and description of an accepted replacement item must be recorded in suspense in response to DLA notification as well as the effective date of the change. Updates of this type may require referral to cognizant offfices for acceptance or rejection which requires maintenance of a suspense file for monitoring purposes. Moreover, in order to adhere to DLSC's effective date doctrine, the internal system would have to rely on simple time frame suspense routines for maintenance purposes. Basically, GINS and DLSC are incompatible systems. The design of conversion programs capable of computerizing this interface would be complex and costly to develop. Given these restrictions interfacing represents a long range design goal. The design of ICS, however, should be such that interface requirements can be meshed sometime in the future without dramatic redesign. Interface problems explained herein are illustrative only and are not intended to imply that these specific ' t Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 -46- Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 computerized interfaces between DLSC and ICS are either planned or desirable. 12. Finance and Associative Interfaces: Interfaces between ICS and the Office of Finances General Accounting System (GAS) are computerized but do not qualify as automated interfaces. For this reason the logistics and finance subsystems are more analogous to stand alone than integrated systems. ICS is programmed to generate file entries in response to supply actions affecting PRA accounts. Periodically GAS extracts data from ICS files, reformatA that data and batch updates that system for subsequentil entry into the Financial Resource System. Time wise these systems are not synchronous because ICS updates on-line whereas GAS is subject to batch update. Both systems generate PRA status reports, ICS the PRA Tracking (PRAT) kind Finance the Status of Operating PRA (SOPRA) report. The fact that PRAT and SOMA report generators involve access to two separate data bases (ICS/GAS) makes reconciliation of these reports difficult, Another obstacle to reconciliation is limitations in ICS design. Comparison of balances maintained in the two systems confirm the proposition that output discrepancies are legion. For example, a $5,562.773 unresolved difference existed in FY76, a $131,563 difference in TQ, a $1,174,972 in FY77, and a $25,763 difference to date in FY78. Differences in PRAT and SOPRA reports are attributable to two primary factors; first, the financial system relies on cents for PRA computation purposes whereas ICS relies on mills, and; second, information extracted from ICS files and copied on GAS files includes reimbursable u Approved For Release 2005/07/12 : GIA7RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 e ? ..tg PRA transactions whereas reimbursable PRA transactions are excluded from SOPRA reports. nanual adjustments to SOPRA and PRA reports are capable of resolving some differences in these reports, however, unresolvable gaps remain. These gaps prompted implementation of a manual PRA tracking system to ensure operationaL integrity of the accounting system. The output of the manual system yielded yet another balance which diverged from those of SOPRA and PRATS. This system has since been deactivated but gaps the system was designed to bridge persist. Another potential souce of error is attributable to the configuration of data flows between ICS and GAS. ICS is programmed to pass data to GAS, however, the system cannot reverse this data flow pattern. This constraint allows Finance to update its data base without concurrent ICS update. Finance updates consist mainly of Project Number changes. Logistics is not notified of changes involving the last four numbers of the P11 but is advised of those affecting the third and forth digits of the P,N. Accordingly, the system rendors reconciliation of project level a questionable enterprise. 25X1 ICS is not programmed to accept and evaluate transactions for the purpose of selecting routines for systems update. Management personnel intervene in this process because menu's must be selected prior to processing supply actions. Accordingly, system maintenance relies heavily on judgemental factors which increase in complexity for certain transaction categories. Procedures associated with stock number and unit price change illustrate this complexity. For example, Item Identification Section can execute a stock Approved For Release 2005/07/12 : C14813DP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 t 4 number change simply by calling forth the appropriate menu and processing the update. Price changes may be associated with stock number change which requires that command and control responsibility be transferred to MI where a separate menu is invoked for update purposes. Processing is further complicated by the fact that the stock number change menu is incapable of reaching into suspense files in which dues-in and dues-out are layered. This constraint requires execution of a query to determine whether or not a suspense exists for the item involved. If so, another menu must be called in order to update the suspense. ICS dependency on human interfaces for file update and maintenance favors high error rates, low reliability, and degradation of system response tines. Error corrections represent a tine consuming and complex process which have been reduced to the extent possible through; a) manual validation of updates processed in response to certain classes of supply action and; b) diffusion of update responsibilities within the system. Simple errors such as those associated with the keying of an erroneous price at tine of receipt frequently corvand the invocation of eight separate menus for correction. Updates of this kind normally span several files as well as multiple data elements within files for which no computerized linkage exists. Error rates are certain to increase exponentially in this type environment. SHB has pre-euptedrifrom keying the 25X4 receipt of stock replenishment materiel in order to reduce the incidence of process- 25X1 ing error. has, however, retained responsibility for updates associated with directs. Accordingly, updates confirming receipt of materiel arc t.?.1 Approved For Release 2005/07/12 : gl4NRDP85-00988R000700020001-3 Approved For Release 2005/07/12: CIA-RDP85-00988R000700020001-3 processed by two widely separated components. This spatial separation complicates transaction processing and degrades response time because multiple components of the system may have to be accessed for status information. Another property of system operations is that associated with manual -?palyTA5 validation of transaction data. JA? personnel manually validate all supply actions reflecting a cost of $10,000 or more in order to flag and correct errors. Data Management Section workload statistics indicate that approximately three and one-half man years of effort is expended annually in data validation and verification operations, error correction, manual reconcilia- tion of PRATS and SOPA reports, and evaluating the impact of enhancements on reliability factors. This manpower expenditure pattern demonstrates that ICS is a marginally reliable system which entails a substantial manpower commitment to maintain. The degree of data integrity needed for the financial interface has proven particularly burdensome. Processing procedures described in this and preceding paragraphs were designed to ensure that data lifted from ICS for entry in GAS is reasonably accurate. Notwithstanding efforts to enhance data integrity via manual means, gaps in these systems persist and will continue to do so unless an effort is made to design an integrated system. Another obstacle to implementation of an integrated system is the lack of a unified numbering system needed to identify and track transactions through the supply system. Requisitioners are responsible for assigning a document control number (DC(I) to requirements forwarded to logistics. This number identifies that action in all intermediate processing states except those actions passed to procurement division. Initially SMB assigns a Logistics hrl TTS. .! A ? - .AL Approved For Release 2005/07/12 : CRRDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 ? ,L,? Control Number (LCD) to transactions passed to procurement. Subsequently the procurement entity assigned responsibility for executing the purchase instrument modifies the LCN. At this point the modified LC il is redesignated as the Purchase Instrument Number (PIN) for purposed of updating ICS. Frequently, the LCD is not used to identify the actual purchase instrument but rather represents an intermediate number which stands midway between the DON and the number finally assigned the purchase action. For example, requisitions passed to the CONIF systen.for appropriate action pick up a unique identifying number which may differ from both the DCN and PIN. Similarly, requirements passed to IDSB are assigned a fourteen position DCN for processing via the MILSTRIP or FEDSTRIP system. IDSB assigns a DCN to requisitions entering the MILSTRIP/FEDSTRIP system. MILSTRIP/FEDSTRIP requisitions do not set aside fields in which to inscribe the PIN, therefore, DOD billings are keyed in the DCN. Finance does not reference CD receiving reports in connection with the DOD billing and reimbursement process. Consequently, the computerized system lacks the capability to maintain DCN an PIN cross reference data for requisitions passed to DOD for supply action. IDSD compensates for this gap in the data processing stream through maintenance of a manual cross reference log. Periodically this log is forwarded to finance to provide a capability for cross referencing the DCN and PIN prior to effecting reimbursement. One design objective of FARS is to computerize generation of the PIN/DCN cross reference listing so as to close this gap in the data processing chain. Activation of FARS has the potential of streamlining interfaces with FRS, r1?,' 0?"?'"n"1"4 /if; Ajt Approved For Release 2005/07/12 : Cpa1RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 however, the creation of another stand alone system offers little promise of enhancing ICS performance capabilities. Already, :ICS depends on two systems to feed information to FRS; namely SNO and CONIF also feeds data to FRS gX1 constitutes a third system. Adding FARS to this data path network cannot help but add a forth feeder and aggravate rather than ameliorate discontinuties in the data exchange network. Grafting EARS to ICS for integrated operations may surface such complex design problems that the two systems will be forced to co-exist with little or no computerized linkage. 13. System Review and Approval Standards: Standards associated with systems review and approval processes are normally related to missions defined for the application involved. One standard Hight reference the capacity of the proposed system to conform with reporting requirements of the Agency's Financial Property Accounting System (FPAS). Exclusive linkage to this standard, however, would be both impractical and restrictive. This standard can not apply universally because several applications now operational, or currently in process of review, cannot be evaluated in these terms. For example, the prime mission of EARS is that of interfacing with MILSTRIP, FEDSTRIP, and the Directorate of Finance, whereas AUCS is firearms control sytem designed to track weapons issued to authorized recipients. Analysis of these and other systems confirm the proposition that the review and approval process cannot always be related to specific reporting requirements. Most computerized inventory management systems are capable of capturing stock numbers, descriptions, serial numbers, and associated data Approved For Release 2005/07/12 : GIIMRDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 elements and are easily programmed to generate prescribed FPAS reports. This attribute of conputerization frequently relegates compliance with reporting requirements to a subordinate position. Cost effectiveness frequently serves as a system review and approval standard. Application of this standard presupposes that most benefits and costs associated with conputerization can be quantified for donparative analysis. Concepts underlying this strategy normally relate to the degree of integration specified for system operations. For example, the design format of DOD inventory control systems centralize information management responsibi- lities but decentralize connand and control. Application of this organizational concept provides an adhesive for joining components of the system into a finely tuned and integrated whole. Initial design cost for the integrated system may exceed those associated with the design of a profusion of stand alone systems. Offsetting these high initial development costs are much lower operation and maintenance costs. Perhaps the most redeeming feature of the integrated inventory control system is the efficiency with which it executes its data processing tasks. This offshoot of integration takes the form of intangibles not capable of precise quantification. The capacity to flag repetitive demand, enhance response tines, decrease error rates, execute tasking objectives cutting across two or more administrative or operational jurisdiction etc; are illustrative of these intangibles. Analysis of intangibles clearly demonstrate the risk of excluding then from the evaluation process. Stand alone systems performing essentially identical data processing tasks, yet programmed in different languages, hold little potential for tangible yield at the systems Approved For Release 2005/07/12 : C4ANDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 level of operation. Reliance on the strategy of cost effectiveness in the evaluative process entails consideration of hardware/software efficiency. Efficiency thresholds for computerized systems range from totally inefficient to extremely efficient. Inefficient systems exact exhorbitant overheads and, more often than not, prevent users from harvesting benefits of computerization; particularly, those belonging to the intangible class. GAD is becoming increasingly critical of federal agencies maintaining incompatible software systems. Articles setting forth the GAO position in this matter have appeared in several issues of Computer World published by CU Communications Inc., Newton, Massachusetts. Responsibility for defining software standards reside with ODP, therefore, the Director of Logistics is not in control of, but rather, is controlled by ODP in matters associated with hardware/software system selection. The efficiency of hardware/software systems configurations cannot be measured in todays environment from the users perspective. For example, projected development and implementation costs associated with computerization under GIMS compared with costs of implementation under a different system would provide a comparative base for evaluation. Traditionally cost distribution factors have been formulated on the basis of projected stand alone system development expense without reference to the alternative; namely, integrated system development. Current review processes naturally lead to the selection of stand alone systems which are less time consuming and costly to design. This process does not offer a means for evaluating hardware/software efficiency. Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 -54.. Approved For Release 2005/07/12,:,,41 R9Z5,5-00988R000700020001-3 1,7.1 lilt' Given this setting, efficiency standards can not play a meaningful role in the selection process. Application of cost effectiveness standards require that; a) organizational concepts be defined and; b) the decision to enhance or redesign the system be made on the basis of cost versus benefit studies. Adoption of this standard presupposes that hardware/software efficiency is being maximized. Cost and urgency of demand may have been responsible for the configuration of the internal system network. Time certainly influenced the system selection process because integrated system design requires extensive manpower commitments over long tine intervals. Given the immediacy of the system design requirement it became necessary to forego long range advantage for short tern gain. These, together with the interplay of other factors, are believed to have been causal in the development of a system in which efficiency occupied a subordinate position. One paradox is common to stand alone system networks; namely, that efficiency of any particular system of the network may be exceedingly high while total system performance is marginal. Analysis of ICS and its satellites convincingly demonstrates that efficiency and inefficiency can coexist within the system particularly in those networks not stressing integration and the design of computerized interfaces. The design of an integrated inventory management and control system holds promise of erasing this contradiction. Moreover, adoption of integrated system concepts provide a better foundation for the review and approval process in which system development or enhancement can be more extensively analyzed in terms of cost versus benefit. ei " . L',111 u t Approved For Release 2005/07/12 : CD-ik9DP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 t.. IL?L. Statute, regulation, and command and control normally determine operational characteristics of supportive computerized systems. Enabling legislation frequently specifies that a federal agency is subject to GAO audit reviews. GAO's perception of an efficiently organized computer system provides a base for the evaluative process. For example, GAO may flag the maintenance of incompatible software systems for inventory management as a potential source of inefficiency. System reviews nay also search for inefficiencies associated with the maintenance of stand alone systems performing essentially identical tasks as another source of inefficiency. ;lormally, stand alone systems are designed especially for components they support and must therefore be considered a derivative of command and control relationships. For this reason, efficiency of the total system is not an essential property of the stand alone system approval process. Legislation specifies that federal agency's are required to; a) adhere to accrual accounting procedures for budgetary and management control purposes and; b) formulate such policy and procedural controls as nay be necessary to manage the logistic .resource. Internally/statutes are interpreted and reduced to a body of regulations controlling day to day operations. Regulations pertaining to the field of inventory management specify the accepted methodologies for exercising property control. Provisions of HR- pecify delegations of 25X1 authority with regard to the property management function and concurrently define the general capabilities of the supportive property control system. According to this regulation the Director of Logistics is responsible for the development and management of "an accurate and reliable system of inventory Approved For For Release 2005/07/12 : Cps6RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 C control", with enforcement responsibilities clearly specified in that section which states that he shall "establish and/or approve supply management systems ... and their adoption to automated processes where necessary and cost effective". The scope of inventory management is defined in section (2) (0) of this publication wherein it is stated that the Director of Logistics shall "develop, establish, and administer a worldwide supply system". Accordingly, statute, regulation, internal cbaland and control relationships, and the eventuality of a GAO system audit reinforce the need to commence design of an integrated inventory management and control system in order to maximize efficiency and minimize cost. The data processing system is not organized to respond meaningfully to urgency of demand factors. Consequently, most supply actions are accorded equal priority for processing purposes. Responsive computerized systems require that the system process high priority requirements prior to those assigned low priority. Inclusion of urgency of demand factors in systems design is essential because requirement processing always triggers competition for scare resources. Accordingly, the efficiency with which computerized systems operate is determined, in part, through the enforcement of processing disciplines. Neither tine frame suspense nor tracking routines can be effectively joined to a system in which most requirements are assigned essentially identical processing priorities. Urgency of demand standards, therefore, are an essential property of systems design. Approved For Release 2005/07/12 : ClpsDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 25X1 14. Trends Affecting Design Requirements of ADP Systems: the impact of that directive translated into declining workloads in Supply Division. Reinforcing that decline was the fact that many operational programs were throttled down or deactivated. Analysis of requisitions processed through the supply system confirm a rather precipitous decline since FY76. Contrastly, analysis of line items purchased by the Small Purchase Branch (SPB) exhibit nominal 25X1 change. Average monthly line items processed in FY76 by SPB amounted to 1507, 1599 in TQ, 1303 in FY77, and 1530 to date in FY73. SPB is not an integral part of ICS, therefore, transactions diverted to that branch are not recorded in thn computerized ICS. Extrapolation of present trends into the future portends further declines in ICS workloads. 25X1 LSD purchase actions are excluded from ICS statistics. Yet, these procurement sources are essential componenis of the total system notwithstanding the fact that activities occurring in that universe cannot be quantified. Accordingly, it is theoretically possible for ICS to be inactive while transaction densities mount in external support systems. Considering the configuration of that system the decline in ICS may be attributable, in part, to requisitioners preference to acquire materiel from sources external to the formal supply system. Recent retrenchments in operational projects also curtailed the issuance of firearms and other materiel categories to some degree. Requisitioners may now be Approved For Release 2005/07/12 : CI4jfDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 t_f?_4t.41 concentrating on the acquisition of inexpensive materiel through sources other than those comprising the formal supply system. ICS is neither structured nor organized to yield intelligence and performance data upon which to analyze these trends. This shortcoming derives naturally from the fact that ICS workloads represent a small fraction of total activity occurring in the support system. Accordingly, strengthening data collection capabilities via computer means holds promise to; a) improve efficiency of system operations; b) flag repetitive demand so as to realize economies of large scale purchases; c) provide an infbrmation management system capable of generating necessary logistic intelligence for decision making and planning purposes, and; d) provide a response capability which will decrease requisitioners dependency on external support mechanisms. Long ago, logistics maintained a reasonable facsimile of a centralized property control system. Gradually, maintenance burdens forced a shift to the less rigid decentralized system. The shift to decentralization spawned the need to exploit capabilities of computer technology in order to properly exercise resource management at component level. Emerging from this pattern was a proliferation of stand alone computer systems each presumably designed to meet unique reporting and management requirements of the component involved. Orginally, these systems were designed to accomplish low level data processing tasks but in the course of evolution and enhancement, stand alone systems assumed the properties of higher order inventory management and control systems. Augmentation of resource management capabilities, in turn, encouraged components to develop independent management doctrines. This process is believed to have partially responsibl2 for . Approved For Release 2005/07/12 : CIMDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 (1,77A71774-,:m7-1 otwq,k, the drop in Supply Division workload factors which has been matched by increased workloads in the stand alone system network. This conclusion is convincingly demonstrated in comparative system analysis. Three indices support the conclusion; a) comparision of asset worth between logistics inventory and four PIU systems; b) comparision of line items processed between logistics and the four PIU systems, and; c) comparision of line items maintained between logistics and the four PIU systems. Analysis of these three quantuns indicate rough comparability which means that total system workloads are now evenly divided between logistics and four PIU accounts. Assuming perpetration of present trends, it is reasonable to conclude that components will assume residual resource management responsibilities now being exercised by logistics. The Office of Communications plans on implementing a stand alone system for the express purpose of managing approximately 15,090 line items now positioned, or 25X1 soon to be positioned, Apparently, OC plans to finance the acquisition of materiel to be allocated to ram and associative systems from direct materiel procurement allotments so as to circumvent formal accounting control procedures. Impler,entation of REM will impact on logistics in several ways; first, it will automatically delegate responsibility for the management of approximately 23,000 line items 25X1 13,000 plus items now managed maintain in the system to external components which exceeds the by a multiple of two and; second, the success of these ventures has the potential of encouraging other components to follow suit. Accordingly, programs now in progress may restrict the director of logistics sphere of influence in resource management. These shifts, while contributinD Approved For Release 2005/07/12 : C1AeRDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 to the efficiency of operations at component level, can be expected to degrade efficiency at systems level. Analysis of Materiel Procurement Allotment obligation and expenditure patterns indicate that the dollar value of directs has increased. Uhether this trend is permanent or transitory cannot be determined at this point. The trend does seem to reflect an Agency wide pattern. 41oreover, with regard to OC the trend has the appearance of being permanent. This component plans to augment its procurement from direct Materiel Procurement Allotments which may reinforce trends occurring in the support of other Agency components. Collectively these trends have the potential of further decreasing ICS workload factors. The design of a system capable of flagging repetitivt79a4iya)reverse this trend. 15. DOD Software Sys tens : Attachment -T" defined specifications for the Uni ted States Army 's automated Commodity Command Standard System (CCSS). A cursory analysis of this system indicates that it may have applicability in the Agency's environment; provided, minor modifications are made in the software system. CCSS operation and maintenance personnel are assigned to the Army Logistics Nanagenent Center and have the capability to install the system at user request. The only stipulation is that the user installation not effect software change subsequent to installation. CCSS has features of interest to logistics and is capable of performing data processing tasks GINS is not organized to execute. For example, GINS is not programed for high level computerized interface with external systems and is not likely to be so programmed in the future. These interfaces are designed into CCSS. The advantage of considering CCSS as a candidate Approved For Release 2005/07/12 : Cr4-IRDP85-00988R000700020001-3 Approved For Release 2005/07/12: CIA7RDP85-00988R000700020001-3 system is that the program is already coded. Whether or not.CCSS has the capability to meet Agency requirements could not be ascertained except through detailed analysis of that systems capabilities and limitations. GSA and other DOD components have developed specialized inventory management and control systems for distribution to user installations. The only stipulation in connection with installation is that the system not be modified in the absence of command approval. The probability of commercial systems meeting data processing mquirenents of the federal supply system are remote. This is because no counterpart to DLSC exists in the commerical world requiring complex interfacing techniques. 1116%)1;..% Approved For Release 2005/07/12 : C*213DP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 -7-1r1 _ 16. Conclusions: This study concludes that: a. Stand alone systems comprising the network perform their data pro- cessing tasks responsively and efficiently. These benefits, however, are not transferable to the total system because neither computerized interfaces nor integration has been established as a system design standard. Consequently, few benefits have been harvested at the total systems level of operation as a result of computerization, particularly those associated with cost, efficiency, and quick response. Operational characteristics of the current system, together with the autonomy of its elements, make redesign of the entire system the only logical approach to the problem. b. ICS's information storage and retrieval operations are very limited In scope and relate primarily to inventory control. This system is marginally capable of; 1) automating repetitively performed tasks; 2) eliminating manual file structures and manually controlled logs; 3) document preparation and distribution; 4) time frame suspense and tracking operations; 5) generating status information in response to queries or in response to violations of time frame suspense routines; 6) flagging repetitive demand; 7) computerizing routine decision making; 8) integrating subsystem activities such as those associated with CONIF, EARS, AWCS, the Vehicle Control System and the four SAS into a unified system; 9) reducing error rates associated with system operations and; 10) inter- facing with external systems such as DLA, DIDS, DAAS, and others. _ Approved For Release 2005/07/12 :_cslitRDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Given these gaps, implementation of ICS may well have increased rather than decreased manpower burdens with concomitant loses in efficiency. c. The SAS network occupies a crucial position within the total system context. Without computerization of this component of the system, additional increments of manpower would be required to discharge finance and resource management responsibilities. Accordingly, it is imperative that any effort at redesign take tasking requirements of externals into account in order to ensure that component efficiency is not jeopardized. Redesign will require considerable time because data processing requirements must again be defined and be translated into a program. Concurrent with this phase of the development effort, feasibility studies associated with hardware/software selection could be conducted to ensure operational efficiency. d. Statute, external regulatory requirements, the probability of future GAO system audit and review, the most recent Audit Report and provisions 25X1 of Implicitly suggest that the integrated systems approach represents the most economical and efficient route to a computerized finance and resource management system. This study also concludes that the integrated system has the potential of being more cost effective and efficient than a proliferation of stand alone systems performing essentially identical data processing tasks. The totally decentralized ADP system yields few manageriel benefits because logistics personnel cannot be meaningfully and efficiently utilized in this environment. Perpetuation of current Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 -64-. Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 L trends into the future, therefore, runs the risk of rendering certain components of logistics obsolete notwithstanding the fact that decentral- ization is much more inefficient that a centralized information management system. Existing command and control structures can be preserved in the integrated system, therefore, this argument cannot be used in countering the integration scheme. 17. Recommendations: It is recommended that: a. Systems Analysis Branch be chartered to develop requirements for an Integrated finance and resource management system and that this branch be staffed by professional logistics personnel faMilar with logistics operations and systems techology as well as the contingentof ODP personnel now assigned. b. The initial redesign effort be directed at the computerization of supply division operations.- Presumably the scope of this effort might include, but not necessarily be limited to integration requirements for ICS, depot operations. FARS the vehicle control system, AWCS, and the cataloging module. c. Phase two of the redesign effort logically follows and entails integra- tion of CONIF, the Procurement Module, and the design of an updated GAS -interface. d. Design specifications for phase three may well be addressed to the definition of interfaces with companion DOD systems such 'as DIOS, OMS, DLSC, DLA and other. e. Phase IV, the integration of the four SAS will entail considerable effort in order to cop. data from the four data bases and reformate that data for the resident data bate. Approved For Release 2005M7412,...CIA-RbP85-00988R000700020001-3 -65- Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 f. The content of candidate internal and external training programs be explored to enhance the potential of those assigned systems development responsibilities. Approved For Release 2005/07/12 :416;RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-ROP,85-00988R000700020001-3 GLOSSARY OF TERMS AWCS ? Agency Weapons Control System programmed to record the serf el number of weapons maintained in the system. 25X1 CCMS - Commodity Command Standard System. Automated system used by Army for resource and budget management. CMDN - Cataloging Management Data Notice. Machine sensible output of DIOS notifying authorized subscribers of data base updates. CONIF - Contract Information System designed for OL use. DAAS - Defense Automated Addressing System. Defines standards and operating procedures for transmitting and receiving electronic messages over DOD communications system. DAC - Data Access Center, OL. DCN - Document Control Number. Control number assigned requisitions by submitter for control purposes. 25X1 DIDS Defense Logistics Data System. This system maintains the data base for the DOD inventory management and assocative systems. Approved For Release 2005/07/12 :Q9:RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 DLA - Defense Logistics Agency. Elements of this system are responsible for the issuance of supplies and equipment to authorized entities of the U.S. Government. DLSC - Defense Logistics Services Center. DOD element responsible for the management of item identification and management data. DOD - Department of Defense. FARS - Federal Automated Requisitioning System. Internal system designed to format, transmit, and receive electronic messages over DOD communications system. FEDSTRIP-Federal Standard Requisitioning System. This system is GSA maintained and defines procedures for requisitioning materiel through the GSA system. FRS - Finanical Resource System. Automated system designed to provide summary accounting data. GIMS - Generalized Information Management System. ODP maintained data base management system used by OL for the maintenance of ICS, CONIF, and other applications. ICS - Inventory Control System. This system was developed by ODP as an internally maintained inventory management and control system. LADS - Automated inventory management system developed by ODP for implementa- tion ? 1 t*, Approved For Release 2005/07/12 : WRDP85-00988R000700020001-3 25X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 LCN - Logistics Control Number. Control Number assigned to supply actions diverted to Procurement Division. MILSTRIP-Military Standard Requisitioning System. This is a DOD maintained system and defines procedures for routing requisitions to DOD storage centers for supply action. NIPS - National Military Command System - Information Processing System. Data base management system developed by DOD. NPIC - National Photographic Intelligence Center. OC - Office of Communications. Responsible for maintenance of REMS. OTS - Office of Technical Services. Responsible for maintenance PRA - Property Requisitioning Authority. Provides a cost ceiling to requisitioners against which to charge issuances of materiel. PIN - Purchase Instrument Number. Control number assigned by Procurement Division, IDSB, and, where appropriate the decentralized procurement teams to identify contracts. PRAT - Property Requisitioning Authority Tracking System. This system is maintained by OL and was designed to maintain current balances of PRA In the system. PCS - Prime Computer System. Identifies the main frame computer in a distributive network consisting of component terminal processing or mini-computers. Approved For Release 2005/6/12-:-C1A-RDP85.00988R000700020001-3 -68- Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 PIU - Property In Use. Signifies that accountability/responsibility for materiel issued by OL or acquired by other means resides with the REMS - Repair and Return Materiel System. OC computerized system soon to be implemented for the control of organic spares or spares, subassemblies, and components of major systems returned to internal facilities for restoration and return. SMB - Supply Management Branch, OL. SOPRA - Status of Operating Property Requisitioning Authority Report. Prepared periodically by Office of Finance to provide status information to authorized components of the system. SPB - Small Purchase Branch, OL. T/P - Terminal Processor. Mini-computer normally programmed to relieve PCS of routine data processing burdens. Approved For Release 2005/07/12 :_y6tRDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 . , Approved. For Release 200ticl7/12 : CIA-RDP85-00988R000700020001-3 . . ? - . . - ?.! ? -; equrnen and dov;ces, inclmling tc)cgrapl a.d tektyp.: crielpment; iicLas, ir..-1;ntanance, operation, repair, and kre at passengf?r i'tor and aircraft, and vesw.ls? of all kin0:; subjt:ct to polices es tal )1is!: :A by tho 1)5: actor, banspoilatim o: CI.;c7e.rs arid caip3oyees of the Ag:.-..y in Governc71:1;!-ov.,nc.?:.1 atta- ve ecnip:n3.)t betv.,ecn their d(;miosles and 1.*:ccs V. Ii such personn,71 are engap,c41 in v.'ork ?,,-hich makes transportati necessary, and transportation in such c':_i_7.7.2:nent, to and horn s'clooi, of children of Agency pc rsolinel who have quarters for them-;:h..-s acl.theS3- families z)t. .isulatc,d stations outside the continenta'. United Slates whc:rc adequate public or pr.'?'at::! tm,::;- portation is not available; printing and binding; puichase, rnain- nance, and c7eaning of firearms, inc din purchase, storage, and maintenance of ammunitie;,; subcct to policies est had by the Director, expenses of travel in COMICC:i0D with, and expanses inci- dent to aucr,17:nce at inceting,s at pror,:,..ssional, technicd, and other similar organi7ation3 when such attendance would be a benefit in Cie conduct of die work of the Agency; 'association :Inc; library dues; payment ei premiums or costs of suroty bonds for officers cc ein:lo:,?ccs without regard to the rovision. t,f's.r:ction 1.1 of Title Ci;" pa> ment :of cLdm pursuant to Title 28; nect,.::zition oi necessary- lard and the tlearing ef:-;:c;h crsi;717c'.1.:::77 or .1.)171- 5ngs and facilities without regard to secti4.-ms 259 arr.7 5"7 of Titic 40;" repair, rental, operation, and maintenance of bt:i1cLngs, utili- ties, faciiiti:- 7, and appurtenances; and (2) suppes, equip:7,137:1J, and personnel and contract,.,:li services pLherwise authorized by law and re,t:;tilations, when a:Tio,%.7c..? by the Director." (b) The sums wade availr.ble to the Agency ma?,.. !Jr,. exT3or.3.ed vvithout regard to the provisions of law and regulations relating to the expenditure of Government funds;" and for objects of a con- fidential, extraordinary, or emergency nature, such f:.:1-lenclitul'es to be accounted for solely on. t;-.:e certificate of the Director and every such certifica0 shall.bc,deerned.r.,.tblicient voucher for the Innount therein certified." ? SEPARAEMTY OF PROViSIONS Sc. ::).42if any. provision of thif Act, or the appli,..ation of sucT: p;?ovisien to any pe.-son or eireurns;tances, is hela. invalid, .the Ser.ternber 1070 38 Excerpt From "Central Intelligence Agency Act of 1949" Appendix .A Approved For Release 2005/07/1 : bIA-RDP85-00988R9,00700020001-3 Approved For Release 2005/07/1 : CIAIRDP85-00988R000700020001-3 Approved For Release 2005/07/1 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 726, 3 U.S.C.A. 105) the President s authorized to fix the compensation of the Executive Secretary of the National Security Council at a rate "of compensation not to exceed that of revel 11 of the Federal Executive Salary Schedule." For the rate set for level 11 see Federal Executive Salary Act of 1964 at page 173 of the Guide. 12 The Director is cllsojhe "President's primary advisor on foreign intel- ligence" (subsection 3(d) of Executive Order 119'05), with interagency authorities and responsibilities prescribed primarily by subsections 102(d) and (e) of the National Security Act and by Executive Order 11905. 13 The Act of 1947 did not include the position of Deputy Director and for several years there was no "provision of law establishing a Deputy Director with statutory authority to act for the Director or to perform such functions as the Director may assign to him" (H.R. Rep. No. 83-219, March 30, 1953). The existence of ttle position was given statutory recog- nition by the enactment of the Executive Pay Act of 1949 (63 Stat. 880, P.L. 81-359, October 15, 1949), wbich prescribed compensation for the position. The position of Deputy Director was created by an amendment of 1953 to subsection 102(a) (67 'Stat. 19, P.1. 82-15, April 4, 1953), I , thereby enhancing the authority and stanAing of the position and its incumbent. The statute also served Fto put to rest any contention that the statutory acknowledgement of the position in the Executive Pay Act of 1949 converted the position to an appointive office to which a commis- sioned officer could not be appointed in view of the statutory prohibitions against the appointment of such officers to appointive offices (now 10 ? U.S.C.A. 973). The 1953 amendment also amended subsection 102(b) to render that subsection applicable to the Deputy Director, as well as to the Director. i( 14 In addition to the authority to "act for, and exercise the powers of the Director during his absence or disability," it is considered "inherent In the statutory position of the Deputy Director that the holder will assist the Director in the performance oe his duties, including those vested by law in the Director" (41 Comp. den. 429 (1962), Guide, p. IX-9). the , President has directed that the Direvor "shall, to the extent consistent with his statutory responsibilities, delegate the day-to-day operation of the Central Intelligence Agency to the Deputy Director of Central Intelligence" (Executive Order 11905, subsection 3(d)(3)). #-12 15 November 1977 Excerpt from Footnotes tp the "National Security Act of 1947" Appendix B ? ApProved For Release 2005/07/12 : CIA-RDP85-00988R00070002000,1-3 'A Approved For Release 2005/07/1 : CIA-RDP85-00988R000700620001 3 Approved For Release 2005/07/1 : CIA-RDP85-00988R000700020001-3 Approved For Release ,2005/07/1. ,: CIA-RDP85-00988R0007002_000173'4 1 ACCOUNTING SEC. 6 In the 1950 lax,v, the Congress specifies that the head of each executive agenscyl is responsible for esta:blishing and maintaining syStems of accounting and internal con- trol which conform to tfieP rinP ' ei les standards,t and related requirements preseribed by the Comptroller General of the United States. ' furkhor cfo.rified by Public Law" 84-86.3f rs.pproved August 1, (73 7z)..3), the. law provides -a framework of ij.rialloia;..;,;..:3-.,znager_ICiq within Which an accounting system must necessarily operate in achieving these objectives. Accounting is not an end in itself but is an portant part of each agency's management control systern. Satis- factory accounting systems are necessary to proVide es- sential and reliable irifOrmat'ion to management 'officials for use in achieving efficient and economical operations and to enable them to satafactorily report on the custody and use of resources under their management. Although the head.of each agency is responsible under the law for the accoupting systems in his organization, authority for carrying .out the accounting function is ordi- narily delegated. 14owever, the ultimate responsibility re- mains with him and he Aould atisfy himself that: (1) A proper accounting system is established, based on prescribed 'accounting principles and standards applicable to his operations. (2) The information provided by the accounting system lends itself to Tffective use. (3) Such information is being used by responsible offi- cials in programming the agency's activities, in preparing budget data, and in achieving and main- taining efficient and economical operations. , 'Sections 114, 116, and 119 of the cited act apply to Govern- ment corporations and agencies subject to the Gov? ernment Corporation Control Act (59 stat. 597). .2-7 TS 2-22 8/1/72 Excerpt from "General Accounting office, Policy and Procedures Manual for guidance of Federal Agencies" title 2 accounting. Appendix C Appicoved For Release 2005/07/12 : CIA-RDP85-00988R000700620001-3 1 Approved For Release 2005/07/1 : CIA-RDP85-00988R000700 20001-3 Approved For Release 2005/07/1 : CIA-RDP85-00988R000700020001-3 I 1 r Approved For Release 2005/07/12 : CIA-RDP85-00958R000700020001-3 IvIE:10RANDUNI FOR: Lircctor, Support Information Processing System (SIP-6) Task Force Stja;ECT : Property In-Use REFERENCE : Merao'dtd 3 jnit 72 to OL/ADP Coordinator ix - C/M1Q,SI2S Task Force, same subject I. In response to paragraph 2a of the referent memo,. the Office of Logistics expects to have the necessary staffing coalpleted so that Property. in- Use ad Type HI accounts .can be converted to the simplified Type II Financial Acoo-.1.nt4;. (172A) procedures c;foctive no later than 1. July 1972. hUe the convercion is a si.:Tificant citange in policy and procedure, ve do not antici- pate any difficulty in ei.taining the necessary concurrence. 2. Paragraph 2b of the reference addresses the ,general policy repirciing Logistic:8 records on Property In-Use and recioires a more careful analysis. For c.mpic ve must contInu?::, to coil oat aild record data conz,:erning Ve;IICT(2S. ThiS is being done at present by two mcAhods: (a) t basic line item doScription inforalation i3 carried in the.arpropriata Type In or Pxoperty In-Use account, and (7.:-) that basic description plus additional technical descriptive data Is carried separately in the vehica I information data base. Vhile the latter data base takes on .sorre aspects of Property In-Use, it is and must continue to he maintained for purpos other than to meet the requirements of FPA. N',.e may wish to extend that control and re.:cordkeepina philosophy to other areas of property (e.g., weapons) but those systems also would be something other than the Property In- Use system as we know it today. 7. We believe that the Office of Communications and Technical Services Division will wish to mainzain certain in-use records trader the new Materiel Resources Syst?m. TbAs Calice is not qualified to address those requirements, however, and sugEsts that the sk Force take up such questions with those offices and other offices that might ha concerned.. , .Distribution: Orig & 1 - Addressee - OL/SD/SMB - Officio: ? ? 1 - OLISD/SNILVGNINIS ( 1 - OL Files ? 1 - D/L chron , OL/SD/SMB/ Approv John F. Blake Director of Loxistics OL 2-0112,Lt (1,4 Ian 72) : CIA-RDP85-00985R0007008010011j3( D . ? A . 25M Approved For Release 2005/07/1 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/1 : CIA-RDP85-00988R000700020001-3 25X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Next 1 Page(s) In Document Exempt Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 25X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Next 1 Page(s) In Document Exempt Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 I 1! [, 1,, 1 Excerpt -from "Natioual InLellis_;ence ,and .ReCorm Act or 197F," ,p; -,-; ,,' T c ,-- 1 4 ,-,. 1 i ?-?-?st '? Approved For Release 2005/07/1 : dIA4biP8'5100468Pta00700M001-3 I00111 5 .2-rier. (4) Any activity ,',1-e[=-d from the Fund that -continues after the end of the fiscal year in which such activity was initiated shall be funded thereafter through the regular budgetary process at the earliest practicable time. (c) The Director may approve the expenditure of funds tO cover matters relating to national intelligence activities of an extraordinary or emergency nature. The expenditure of funds for 'such purposes shall be accounted for solely. on the certificate of the Director and every such certificate shall be deemed sufficient voucher for the amornt certified therein, but funds expended for such purpose may be expended only for activities authorized by law. The Director shall report quarterly to the Committee on Appropriations of the House of Representatives, the Committee on Appropriations of theSenate, the Permanent Select Committee on Intelligence of the House of Representatives, and the Select Committee on Intellf.gence of the Senate on expenditures made under the authority of this subsection. (d) (1) All funds appropriated to the Office of the 1 Director, all funds appropriated to entities of the Intelligence Community, and all national intelligence activities, counterintelligence activities, and counterterrorism activiti's conducted by entities of the Intelligence Community, and information and materials relating thereto, shall be subject to financial and program Management audit and review by the Comptrollara_f_eneral of the United States upon the request, or with the approval, of (A) the Permanent Select Committee on Intelligence of the HouseofRepresentatives,(B) the Select Committee on Intelligence of the Senate, or upon the request of (C) , ? t other committee of either Uouse of Congress; except that in the case of any financial and program management audit and review conducted by the Comptroller General ef the United States upon the request of any other committee (other tha . ? the Permanent Select Commi,ttee on Intelligenee of the House of Representatives. and the Select Committee nn Intelligence of the Senate), the abdit and review may not extend beyond _ ? f. (/)-((4prtiged FrorlReleecipe 26135/A5j/12 CIMRDP85-00988R000700020001-3 ? (? f J4 / l'1 aft s. , / -r,-,`4 Appendix G Approved For Release 2005/07/1 : CIA-RDP85-00988R000700020001-3 .?? the activities over whicl_:.luch coE,mittee .as legislativo jurisdiction. _ (2) Notwithstanding the foregoing provisions of this subsection, the Director may exempt from any such audit and review any funds expended for a particular activity, and the activity for which such funds are expended if the Director (A) determines such exemption to be essential to protect the security of the United States, (B) notifies the appropriate committees of the Congress of such exemption and the reasons for granting it, and (C) reports semiannually to the -Permanent Select Committee on Intelligence of the House of Representatives and the Select Committee on Intelligence of the Senate on each activity exempted under this subsection. (3) Any audit or review conducted by the Comptroller General of the United States under authority of this subsection shall be conducted in accordance with such security standards as the Director and the committee requesting or approving such audit shall prescribe. (4) The results of any audit and review conducted under authority of this subsection shall be submitted to (A) the Permanent Select Comnlittee on Intelligence Of the House of Representatives, in the case of any audit or review requested or approved by a committee of the House of Representatives, and shall be made available by such select committee, in accordance with and subject to the provisions of the resolution establi hing such select committee, to the committee of the House of Representatives (other than the Permanent Select Committee on Intelligence) which requested or approved such audit or review, and (B) the Select Committee on Intelligence of the Senate, in the case. of any . . audit or review requested or approved by a cmittee of the Senate, and shall be made available by such select Committee, in accordance with and subject to the provisions of the resolution establishing such select committee, to the committee of the Senate (other than the Selct. Committee on Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/1 : CIA-RDP85-00988R000700020001-3 -30- Intelligence) which rcquestd or approved such audit or review. Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 FARS C.) 4-) VECS, Input 1 Approved For Release 2005/07/1 CIA-RDP85-00988R000700020001-3 Profile of Agency Property Management System Automated Interface DLSC Output Mfrs Part Nbr To Stk Nbr Cross Ref Requisition !Manual lInput OS/TS ilounpvVV Manual Hard Copy ICS GIMMS V NDEPENDENT SYSTEM 15,000 Line items est. Teletypewriter and equipment communicatibn ? spares Manual Hard Copy DLSC DAC Manual Input OTS COMMO NPIC DDS&T Output of DLC/DLSC in machine sensible format yet no machine Approved For Releicsef2OGV07/1kxeRDP85-00988R000700020001-3 Cr; u4 AWCS. NIPS 25X1 NI PC Assembly LADS PL-1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 25X1 25X1 Approved Fot ezeteave 2otrstetm ciA-RDittesl-dritsdiobifiduiinout ICS and System Data Flows Stock Release Transaction Prepare /To Consignee Manua:H.), > / I Update Files DAC Shipping Document ?> Shipping Document Consignee Acknowledge Receipt Manual Input I FZ _ Issue Verification T Input Depot Computer Generated Suspense Files Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Computer System Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 25X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Next 10 Page(s) In Document Exempt Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/1 DP85-00988R000700 Approved For Release 2005/07/1 : CIA-RDP85-00988R000700 20001-3 X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Next 4 Page(s) In Document Exempt Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 20,05/07/1 : CIA-RDP85,-009881400070002000173 ICS Estimated Monthly Volumes, 2 June 1975 exc1udinlz c,7) --r-- *Nkpmber Inputs Menu Transactions of -. No. of Characters X Per Input Total Xo. of = Characters Suspense-File Stock (6's) 1001 Directs (7's) I001 2472 2473 60 60 148,320 148,380 Stock Replenishments (OR) 1001: .373 60 .22,380 Receipts 1006 Directs Coll) 73 31 2,263 Stock Replenishments (1A,2A), 385 31 11,935 Amendments (7 ' s , OR) 1008 , 3000 30 90,000. Cancellations ' 1009 40 13 520 WO Rel 1010 .ease (Mgt) 45--?-: 13 585 Requisition, Confirming 1004 44 60 2,640 (6's,71s) Inventory Adjustments , 1012 310 50 . 15,500 (S-AL-C-Price) hid Inventory Maintenance y 1013 200 ' ?- - 50 10,000 ' (Reorder Point, etc.') Cost Adjustment (9's) 1019 , . . 50 50 2,500 . Property' Turn-1n ? 1005 223 50 11,150 (2's except 2A's) MONTHLY TOTALS: .. 9834 466,173 . ? Daily Transactions 447 Daily Total No. of Characters - 21;200 Xey Strokes Per Minute Capability - 15** ? Daily. Production for OnOperator - 6 hours 21,200-i 15 hey strokes per minute = 1413 minutes 1,413 60 minutes = .24 hours 24..: 6 hours = 4 operators ? NOTE (-umber of Transactions Based on April 1975 Volumes **Considers: Inexperienced Operators System Bohn Time Manual Preparations of Documents for Input.; -Queries Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Appendix L Approved For Release 2005/07/1 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 25X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/1 CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 25X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/1* : CIA-RDP85-00988R00070002000173 Approved For Release 2005/07/1* : CIA-RDP85-00988R000700020001-3 25X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/1 : CIA-RDP85-00988R000i:00020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 25X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 25X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/1 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Transactions Processed ,FY-76 July 6472 August 6186 .September 5992 October 6616, November 5438 December 6613 January 6441 February .6480 March 7080 April 7589 May 5878 June 7121 TOTAL 77,906 Average FY-76 = 6492 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Appendix R Approved For Release 2005/07/1 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release ,2005/07/1 : CIA7RDP45-00988R000700020001-3 241 MEMORANDUM FOR: Director of Communications FROM SUBJECT Chief Audit Staff, 0/IG ?? /-/ t)F.0 Zgo Report of Audit, Office of Communications, 1 November 1974 - 31 August 1976 1. Attached is a copy of subject report. Please advisethe Chief, Audit Staff of action taken on recommendations contained in the report. 2. We appreciate the cooperation and assistance extended to the audit team during the audit. zpo Attachment: as stated Distribution: - D/CO 1 - DDA 1 - 0/Com 1 - ? 1 - fl /Fin 1 NIG ppen Approved For Release MI5/07i12 ! CIA-RDP85-00988R000700020001_3A dix S 25X1 25X1 25X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Next 4 Page(s) In Document Exempt Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/1 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 1 . MEMORANDUM FOR: , 25X1; FROM ' Director of Logistics -V / L General ri THROUGH : - Inspector ? Chief, Audit Staf SULJECT : Report of Audit, Office of Logistics - Supply Division 1 February 1975 - 31 October 1976 1. Subject report is attached. Please advise this office of action taken on .recommendations contained in this report. 2. We appreciate the cooperation and assistance fur- nished the auditor during the audit. Attachment: as stated - Distribution: - fl/Log 1 - DDA 1 - 0/Compt/DCI 1 - fl/Fin 1 - 0/IG 25X1 y 25X1 Approved For Release 2005/07/12 : CIA7RDp85-00988R000700020001-3 ?Appendix T tjr:(71 Approved For Release 2005/07/12: CIA-1431586:dd988R000700020001-3 REPORT OF AUDIT Office of Logistics Supply Division For the Period 1 February 1975 - 31 October 1976 .SUMA1:N OF OBSERVATIONS Supply Division (SD) personnel are dedicated to the. needs of the Agency. They perform their functions in a cempetent and professional manner. Division operations generally are conducted in compliance with applicable directives and regulations. However we believe that some of the directives and regulations should be amended to strengthen controls over non-expendable property in use. The division conti,nues to meet the time requirements of its customers when filling requisitions from existin;,, stock or through its own purchasing facilities. Some cleys occur if procurement action is required. The Procurement Division backlog is discussed in a separate report. Several major Agency components have developed or are developing their own property ac ountability systems, a condition which leads to duplica,ion of effort by Office of Data Processing and the originating component. This rep61t includes comments and recommendations on a variety of subjects including: - Property Accountability - Management Procedures and Controls Other matters were brought to the attention of division officials for appropriate action. Approved For Release 2005/07/12 : CrA-Rur85-00988R000700020001-3 Approved For Release 2005/07/12 : 44fRpli8510988R000700020001-3 - SCOPE DY AUDIT The audit included: a review of controls and procedures related to the requisition and ri:anagement of property in the Agency .supply system an examination of the effectiveness of the changes in SD since its reorgo:lization in 1974 - an evaluation of the extent to which customer requirements were met on a timely basis ? - an examination of controls and procedures to determine the adequacy of safeguards ? over Agency assets a review of operations to determine whether they are conducted in compliance with applicable directives and regulations 25X1 A site audit' will be audited at a later tate. The results of an audit of the Inventory Control System will be reported on separately. 'ExiJnditures related to Supply Division activities were re:lewed during a concurrent audit of the Office of the Director of Logistics. I. Approved For For Release 2005/07/12 : CIA-RDV85-V0488R000700020001-3 APproved For Release 2005/07/12 : OIALAD1565.-00988R000700020001-3 -3- BACKGROUND 14 Tho Supply Division budget for Fiscal Year 1976 is cl154t t as follows: 25X1 2. The division has a table of organization of 202 positions. The charts attached as Exhibits A, (Supply Division) show how the division is organized and indicate the number of people assigned to 25X1 the major units. DETAILED COMMENTS Property Accountability System 5. Agency regulations assign rc:-J;o: control of property to the Office of Director of Logistics has charged task of developing appro7iiate accouli'..? , Approved For Release 2005/07/12 : CI.)1kr161- ?.5 - _08_-00988R000700020001-3 Approved For Release 2005/07/12 : CfAfRpP8$-00988R000700020001-3 L -4- 25X1 6. In recent years several Agency components adopted automated property management systems through which they maintain propeity accountability. Other components are studying the feasibility of developing their own systems. The Office of Technical Services, Office of Communications, and the National Photographic Interpretation Center are among the components interested in having their own property systems. 7. The Components are interested in developing their own automated systems for both. management and property accountability purposes. The components felt that per- sonnel reductions and the size and activity in their accounts made the manual system unworkable. In order to automate their systems some components went directly to the Office of Data Processing for assistance. Others tasked programmers within their own organization to design and program an automated property system., The dupli- cation. of effort required to develop individual automated property systems is uneconomical and inefficient; it may lead to multiple cases of "re7inventing.the wheel". The development of automated property accounting systems shotld be centralized in Office of Logistics. Recommendation fl: Develop automated property accountability systems i:.hat can serve the needs of all Agency ?components. 8. Supply Division is reviewing the property accounting system with the view towards strengthening controls yet retaining simplicity. We too have been concerned for some- time about weakness in the system. The system does not provide a centralized control that identifies the location and value of non-expendable property. There ca:? be no assurance that all non-expendable property is accounted for. In our opinion the fonowing measures should be considered in. any revision to peeoperty account- ability procedures: _ Approved For Release 2005/07/12 : CTA-RDP85-00988R000700020001-3 0 I .11 Approved For Release 2005/07/12 : 64*94440988R000700020001-3 5 a centralized Headquarters control over property to assist management .in knowing where all non-xpendable property is located a procedure to control all non-expendable and expondol)le. property over a given dollar value (now $200) until the receiving component can document the consumption of the property a revised dollar value for non-expendable property from $200 to a higher limit to. take into account the effect of inflation a property control register to control accountability a schedule of shipments to advise responsible property officers what shipments were made a cable or shipping document to support the document recording the transfers between accounts 9. The Audit Staff recently- -17LI.s invited to comment on the proposed revision to the property accountability handbook. Our detailed comments will be the subject of a. separate -report. Test and. Inspection Procedures 10. We previously reported that testing and inspection (TI) of all non-expendable procerty resulted in delay of payment to vendors. We also rer.Jrted a low rejection rate of items tested. We felt that t.le knowledge of the inspectors as to which materiel is likely t.) be rejected justified inspection of property on a test basis. No changes in procedures were made during the audit period. However in February 1977, a supply instruction was revised to provide for inspection on a test basis. The new procedure should help speed the flow of receiving reports and the payment to vendors. Follow-up on Requisitions 11. Each of the three commodity teams within Supply Management Branch (SMB) include one member .vlic) bas the responsibility of follow-up action when a cu,;temol- (1,12tions the status of a requisition. However most re uii Mn:. iac through SMB before foliow-up becomes necessry. C- SMB personnel must refer the on0,-.1-- on to - Data Control Unit at 1 where 1..;1. Approved For Release 2005/07/12 :% IA-RDP85-00988R000700020001-3 25X1 Approved For Release 2005/07/12 : CIAS;tb138,5-p0?88R000700020001-3 -6- action takes place. We also learned that various sections of the warehouse recive direct calls, from customers interested in pafticular requisitions. 25X1 12. The supply system Tecords "due-outs" (unfilled customer requisitions) some of which are quite old. Supply Division has considered iollow-up action to. determine whether the ordered property is still desired. But no procejtre has been established to accomplish this action. Failure to take follow-up action may result in purchase and delivery of property which is no longer needed, Recommendation ?'3: Institute a follow-up program to determine whether old unfilled customer requisitions are still valid. Time Frame Suspense Module i. The Tine Frame Suspense (TES) module, an enhance- ment to the Inventory Control System, is expected to be phased-in during Fiscal Year 1977, This module will enable management to track transctions through the system. Variations from prescribed standards should become apparent thereby enabling prompt orrective action. Oace TFS is ,implemented, the product- vity of those units performing the inventory control functie can be measured. TFS also is expected to allow retrieval of data on Materiel Procurement Allotment (MPA) issues and Property Requisitioning Authority (PRA). MPA and PRA are procedures followed to control the issue and replenishment of property for components. Until the TFS enhancenent is implemented, management cannot effectively determine the efficiency of the various components of Supply Eivision. We plan to review the effectiveness of the TFS nodule during the next audit. 25X1 hoca'cion of pply ManaPement Branch (SMB) Approved For Release 2005/07/12 : DI45-00988R000700020001-3 Approved For Release 2005/0,7/12 :?CliA,RbP$5:00988R000700020001-3 L - . has ciVtsidc.red the move.. in .the past and found merit in the suggestion. 'hit. the move was not made. We believe the beiJefits to be derived from the move should be re- considiered. The move wid provide a chnce for SMB personnel to recpive cross-training in. The move 25X1 would permit more efficient use of: per(J) snn l. Those assigned . to areas with temporary. slack periods in their workload can be reaSsigned to other areas that have a backlog c)7i work. The moye also would eliminate the duplication of requisiti,3a files and should eliminate the. need for follow-up action to more than one location. And finally , the move wou'J d provide branch personnel with a.better understanding of the entir supply operation. 25X1 25X1 Approved For Release 2005/07/12 : CI1-4D138520988R000700020001-3 ? Approved For Release 2005/07/12 : CIA4R9P8500988R000700020001-3 25X1 -8- Property Out for Repair 25X1 18. Classification, Repair. and Disposal Section (CRDS) maintains records at to control property sent out fo-,: repair. No follow-up procedures exist to ensure that the property was returned. No follow-up action has been attempted. Often times the property may be returned by the company performing the repairs directly to the Agency component concerned. Without follow-up action between other offices of Logistics and the repair facility or Agency component concerned, there can be no assurance that the Property was returned. Some property may have been lost. CRDS rcords indicate some items sent out for repair before 1972 have not been returned. Recommendation 117: Establish procedures ich would allow for an annual follow-up on property out for. repairlonger than six months. 25X1 Property Disposals Approved For Release 2005/07/12 : CIA- P85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-13Si.1640i8R000700020001-3 25X1 -9-- On-Loan--Property 21. Supply Management Branch has a procedure Which permits ',gency components to use property for a 90-day period wthout cost to the user. This .on-loan-property procedure was established so that components could acquire property on a temporary basis primarily for test and evaluation purposes. A written justification is required to extend the loan beyond 90 days. The Chief, Supply Division must approve extensions beyond 180 days. The records indicate that some property is held past the initial loan period with little or no, justification offered for the extension. Consequently some components use property kor exterded periods without charge to their account. Recommendation #9: Ensure that property loaned?in excess. of 90 days is justified or approved. ApprovedFor Release 2005/07/12 cCIA-R10085-00988R000700020001-3 Appro ed For Release 2005/07/12 : CIA- r, W-b69138R000700020061-8 2. Property on loan to Agency components originally was placed in allocation code 05 (on loan to Agency activities for t&st and evaluation). Government furnished equipment (GFE)Iconnected with contracts with other Government agencies also yas assigned the same 05 allocation code. Subsequently allocation code 05 was replaced with code 6E. k. The Analytical Section/SMB has had little success in reconciling the on-loan-property documentation with a machine listing of code 6E property. Three problems were identified: identifying and clearing on-loan-property still in allocation 05 identifying and clearing GFE from allocation codes OS and the 6E ensuring receipt of requisitions coded on-loan-property from the Commodity Teams in SMB where the transactions are origi- nally coded. 24. The last problem cited was resolved during the audit: the Analytical Section/SMB must approve all allocation code GE transactions. 25. The resolution of first two problems requires a continuing effort to research past data. Current charges are being monitored by extractig a monthly listing of code GE property from the Inven ory Control System and reconciling any changes which my have effected the listing during the month. These procedures were implemented after our initial discussion aid review of controls over on-loan- property. The new procedures will be reviewed next audit. Recommendation #10: Continue to follow-up on discrepanciesdiscovered during the review of allocation code OS End 6E property. Duplicate Files at Depot 26. The Preservation and Packing Section (PUS) maintains shipping document files. About 75% of the FY 75 ? files we reviewed were invalid because PUS does not reeeive. information on those requisitins canceled or retired to archives by the Data Control RCM. The DCII is respon- ? sible for maintainj e d: conti-01 number (DCN) files at ITbe :21 the IL'j files to 25 1 e4se,2005/97/12 L:CIA-RDP85-00988R000700020001;3. Approved For Release 2005/07i1 : C 5 25X1 25 25X1 Recommendation #11: Keep current the separate sTapping document files in the Preservation and Packing Section. Forklift Maintenance Contract -27. We previously discussed the limited use of fork- lifts at thel We recommended that consideration be given to ieuucing tne number of forklifts on hand. Since the audit seven were disposed of and two were trans- ferred to another division. 28. We reviewed the cost of maintenance contracts for the forklifts and found that in 2 years about $61,000 was spent for 2,000 hours of labor and for small parts. The value of the small parts could not be determined from the records. I personnel support our opinion that consideration _should be given to hiring a mechanic to perform maintenance in lieu of renewing the contracts. The estimates the mechanic's salary would begin at about '14,000 a year. For comparison purposes, overhead costs of about 28% would have to be added to the base salary. Recommendation 1112: Determine the feasibility of hiring a Tirkfat mechanic prior to renegotiating the maintenance contract in September 1977. Vehicle Maintenance Records 29. Logistics Management does not take advantage of the One of the autoAL:-iie mechanics maintains records on 25X1 vellcles/trailers ant:, 7 gas forklifts. The records are summarized each mon4I lo shot; such things as odometer readings, gasoline thP average mileage per gallon for each vehic: lecord shows all main- tenance and repDir, on ch vehicle.. None of the detailed vehicle maintenance records available at Approved_ For Releate 2005/07/1? tfili 4 -00988R000700020001-3 information is is provided to management. Consequently management does not review such things as vehicle efficiency .and maintenance costs.. Recommendation #13: Use available main- reITECT-T?eccirTs?TO" monitor efficiency of vehicle. operations. Value of Property 30. The value of property recorded in the Inventoii Control System exceeded by $116,400 the value recorded by the Office of Finance. The difference has remained sub- stantially unchanged since October 1975. Supply Division concluded that the difference occurred when the entries were made to incorporate the stock value at into the Inventory Control System. Supply Management has been researching the difference. 25X1 Recommendation #14: Furnish the Office of 'Vinance with thj?information to bring the accounts into agreement. Cash Count Procedures 31. The cash counting procedures should be strengthened. The individuals selected to count cPsh each month count all cash and cash items in the pos'ession of the finance officer. But they do not count ino funds held in Small Purchases Branch ($10,000) and the Office of the Chief ($3,000). The funds are ad- vanced by the finance officer informally on hand receipts. The funds should be verified along with the finance officer's cash. Branch Recommendation #15: Ensure that All funds .',C-Earge-a?to th&?Trliance officer are counted each month. Receiving Reports 32. The Offiee of Finance/Audit & Certification Division (A&C) ceentinusd to experience problems with re- ceiving reports. TH:: reports were received on a more timly basis tliutt in the past. But AC personnel did not have a cr0:31 point or contact tc locate missing reports or to le ,e ,e et:her receiving report problems. 25X1 Poi- Release 2005/07/12:!-dlk-RbP85-00988R000700020001-3 I Approved For Release 2005/07/12 : CIA(MDIP815-00?88R000700020001-3 -13- Also, the Office of Finaace and Office of Logistics had not resolved which office had the responsibility to contact ' the vendor when circumstances so dictated. Subsequent to the audit we were inform:3d that as a result of joint meetings between Office of Finance and Office of Logistics that the problems have been resolved. Verification of Aflp.E2ying Officer. 33. Supply Division plans to accept requisitions without verifying approving officers' signatures. The division found that it is a time consuming task to verify the approving officers' signature on each requisition. And the task sel- dom is productive. As an alternative to present procedures, the division yould require each component to be responsible for properly approved requisitions. The effectiveness of internal control procedures and the validity of signatures would be tested during regularly scheduled component audits. The Audit Staff concurs that the proposed plan has merit .25X1 but defers formal concurrence pending further review. Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 25X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 . Approved For Release 2005/07/1 : CIA-111t14,009,88R000700020001-3 -15- 25X1 42. Protection masks are available in the vicinity of the apparatus, but they seldom are worn by the operator. Other employees also work in close proximity to the machine. Recommendation P23: Determine a safe dis- tance from?The apparatus to locate employees other than the operator. 25X1 ' CONCLUSION 43. The report contains 23 recommendations on a variety of subjects. Some relate to matters already being considered by Management; others relate to matters which may not yet have received sufficient attention. We believe Supply Division personnel will give our, recommendations a conscientious review and take appropriate action. Approved For Release 2005/07/1 : CIA- )3,51-009t8R000700020001-3 25X1 25X1 LOW4ctACS Approved For Release 2005M-7744 AAKEFIDIM-00988R0007000200013 Division Orgaruzation Chart Office " of the Chief Operations Sunport Branch ? i ? I. f 1*-1 25X1 Technical Rzgulations Advisory & Procedures Section Section 1Management Control i Section Supply _Management Branch Data Control Branch Analytical Section Data Base Management Section - Commodity Team A Item Identification Section Numbers in lower left corner indicate personnel assigned at 29 October 1976 /Apprlved For Release 2005/07/12 . IA-RDP85-00988R000700020001-3 COmmodity Team 25X1 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 stAT Approved Foft13,pleaspn2q5/07/n1j.:.CIA-RDP85-00988R000700020001-3 r?it'r,-,1,-Nr\ ? "I ".:; : ? 13FORjATION TO: FEWM: 61F3JECT: Chief, Supply Division, OL Clief, Supply ;lanae713at P,ranen,..SD .L Ld)ata .;ase lacAger Review of Departht of Ar;zy Autcmtated Loi? tic; 'ianaLenttc STAT 1 7 FED 1013 1. Attacheat 1 contai,ls a brief ovcrvic.,f of the ArPy's LoIstical LY te.: .2hd is prcsented here as inferrlation only. AJ/i..), attende,3 a tour of a locc.1 Ar:ily installa- L4VA recently and broaat baci: a copy of the tr.ijning manual for this system. , 2. 'this syte;:i contains muc% riore canability than we Th ever eJ bui: it does contain overytnin 1*.a do need. Ary systco is batc.L1 vice on-line. The soEti.mre.paeca!;e is ?free and requires aa Li60 or I:otter for har?jware. are l00%in into a similar Air :Force syste;a wItich is o:1-lihe. 11/4 ' Att. Distribution: Orig. - Addressee w/att 1 - C/3.L3 w/att v1 - 01,/,30/DC:: (Official) Watt STAT / OL/SO/DCn, pata J;ase 141aaLer Pi/373 (17 1ebrunry 1973) Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Appendix U STAT ? i Approvrkkgraalpfua2400i.07/11 1*.et $ .? PoRaPrte98"8119EN7y0020001-3 Review of the Automated Leistics :-Ianagement Systems Activity (\1 \) Al;:-53L123-1 dated :,;arch 1!)77. 1. Tne Co_p:.edity Ce:-Imand Standard System (CCS.)) is an outz,rowth of a U.S. Ar..ly ateriel i(evelop,,Iont and Aeadiness Com!land (nAcDi) preyraat to (level?, s::nndarl operatin(7 on standArJ eui ';ent it1 tfia,lard co?puter softre for wholesale logistics, depot operations, and arsonal/lab operations. 2. CCS 5 is .1-cconized one the largest automatic data processini business and accounting systeLis ever developed. Key features ot tAiS systeia are: a. Extensivo data 1;:a1ntnance and retrieval b. Standard data ?le-tents c. CCSS Co;:lputer/Counication Center (Auto,lin Intera:ac) d. Standard rdanagcc,ent process 3. The key functions of this Army system and the most important features are as follows': a. Provisioning: 1. Auto.aatic )LSC screening for stock numbers. 2. Esterisive editing of input data 3. Capability to retrieve any data stored 4. Autoc.tatic generation of repair parts and special tools list S. AutAatic fleneration of data for establishing an item in the .tional Steck .;umber flaster Data ,ecod (iiSA,IAR) Cataloging: 1 1. Automated record entry to the 24SN:!DR 2. Zxtensive au:Oer identiCication caability 3. Extensive interchaal;caule aad substitutaole item file updates 4. :Taster Data accord CIX1) generated ArLly Master Data fillo (A. ::)F) changes S. Auto:lated deletion system ? C. Supply iianagement: 1. 2.. Activator Li oreclude oot-o2-sto6; situation Pre-requirec.lonts determination and execution system up-date Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 $ !..."1"--,r1 Approved rReleese act5o NI 2 : ellIC4R,OPEL54p0 gpabopt Op 1.1'41 it aim rho 0001-3 3. Computation of requirement levels and execution 4. L%!f,7!n-.It: Utilization 1),rogram (-0)UP) autoclation 5., Autoatic ;uquiroments Computation Systoa Initial Provisioning (ARC31P) 6, 1)017) 1.)unt ztro.tificatioa 7. Pric rcoputation 8. Administrative aad procurement leadtime. rec(Jputation 9. Inventory stratification d. Procurement and, Production: 1. Autoated funding 2. Autoiaated Procurement Work Directives (PWD) 3. Ageing and stain; 4. Autot::ated delivery orders S. Record of all,contractual data in ALSCAP Master File 6. Semi-A.c,tomated .purnase orders and delivery -..orders 7. Procurcont .stlzus inquiries 8. aork Urderingad Reporting Collalunications Syste.0 (,:ORCS) ? 9. Autoaated i;h1ders List (ABL) 10. Breakout update Stock Control: , I. Precise requisition control 2. Systef,is decisions-reuisition processing . 3. ?bacorder establishment 4. sackorr relcose S. reporting 6. Full MILliZIP processing 7. Automated surv:Iillaucc of manual action 8. Invuntory rocqaciliation 9. Station excess 10. Transportation management data f. aintenance: 1. Maintenance programs ? 2. flaintenance -017.orarl asset reporting 3. Overaaul cunsu:aption data 4. Maintenanc3 ...)vdavi. factor reporting syste2 S. Parts explo-sion Approved IForRe.lease 2005107112 : CIA-RDP85-00988R000700020001-3 Approved For e '41,d -1100i-9-48.kRi.:06304Y1 -3 '6. Depot Maintenance Parts Requirenents List (L) 74 Arw.y aintonance Management Data Exchange (AMI=) Financial anagerilont:. 1. Stock fuaa 4. aaeral i7.r ainteaance 3. .:up,.)lyirrocent/FinsIncial integration 4. FILlj rica S. Prosra:-.! ful,d control 6. Custoer biiii 7. Plaaaciai ry,)orting Ii. Depot f.Aandard System (SPEEDEX): 1. Shipent.plannin 2. Transportation movenent and route planning 3. Auto:ated !Iroparation of GBL 4. Automated trLnsportatioa uanagement reporting J. ,fiateriel receipt .control 6. Depot stock locator system 7. Physical irivntory of stocks 8. Inspection schedules of ammunition 9. Quality inforation syten 10. Auto;-.:ated,wofUoad 11. Autoated .update of 1-,:aintenance data bank 12. Automated jlaintenance shop schduling 13. Auto.f,tated parts forecasting for maintenance 14. Expc.:nse appro,p:Aation manage!Aent 15. Work measurement 16. etc 4. It is obvi6a3 many of these features in the Army system are sLailar to those LI our system, except under different nalY;s. The in selling point of the :\17.:y syste:11 is tne total intera- tion of LQ0.2-;tics/iinance functions, elininatin-; the need for numerous 'stand alone syst61;is such as we have today. ? ' , `'' ?? .1 ? rtv,1;ii Approved For Release`2005/0T/12 : Ch4-RDP85-00488k0a0,7. 20001-3 Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 DATA-FLO January/February 1978 Bimonthly Newsletter of Mohawk Data Sciences Corp..1 Series 21 Grows Again For the second time in less than a year, Mohawk Data Sciences announced a major peripheral expansion to its Series 21* line of intelligent systems. The new products include desktop magnetic tape drives, a ten megabyte disk drive and a keyboard rest for added operator comfort during long keying operations. Previous enhancements included three line printers ? 90 to 600 lines per minute ? and a compatible channel for connecting Series 21 directly to larger MDS* data entry/communications systems. Introduced in January, 1977 as the first low cost, easy to use distributed processing system, Series 21 has subsequently gained worldwide acceptance. Present users cite modularity as a principal factor in their choice of Series 21. "MDS Series 21 lets you walk before you run," said one user. "You can start with basic data capture applications on System 21/20, and then when time and workload permit, you can upgrade the system in-place to a user-programmable System 21/40. One by one, local programs can be developed using MOBOL* (Mohawk Business Oriented Language). Eventually, most of your job responsibilities can be autama -ed esentative. Approvea i-ortKeleasgai665/09fli2 a. CIAgRfirite5-00988R00011462000'43 *Trademarks of Mohawk Data Sciences Corp. for greater efficiency and less dependency on mainframe processing." Promise Fulfilled The new enhancement package goes a long way toward fulfilling the commitment made at the introduction of Series 21: "Planned extensions to the Series will provide increased processing power for a broader range of distributed applications. This means Series 21 users will always be assured of a long-term growth path within the same product family, thus protecting prior investments in systems programming, documentation and operator training." The new tape and disk peripherals are favorably priced compared to similar competitive devices, and they have been engineered for a high degree of reliability. Since distributed processing systems are normally widely dispersed, it makes sense to design them for minimal service attention. Desktop Tape Two, new 25 inch-per-second magnetic tape drives for Series 21 are designed to rest on a table or desk. Their compact design and quiet operation make them ideally suited to an office environment, where space The new drives provide a computer- compatible medium, in either 9-track 800 bpi or 1600 bpi formats, for transferring diskette files to central processing. Both drives accommodate up to 1200 feet of industry-standard tape Magnetic tape on Series 21 may serve as an input/output device for MDS data communications and media utility programs. Tape is also accessible via MOBOL programming for customized file manipulation. Series 21 magnetic tape is an economical, reusable medium for long-term file storage, such as customer names/addresses or part numbers/descriptions and pricing information. 10 Megabyte Disk A new, mass storage disk drive is available for System 21/40 ? the user-programmable version of Series 21. This highly-reliable drive incorporates a non-removable disk pack having an on-line storage capacity of 10 million characters. Disk on Series 21 is accessible for data communications, media utilities and MOBOL programs. For example, user-written programs can access disk files, with the information being displayed on the video screen for operator reference or modification of stored data. The 10 mb disk is offered in two configurations: either as a freestanding drive, housed in its own cabinet (similar to the 2.5 mb disk shown above); or the drive can be integrated into the Series 21 Controller Console. Keyboard Rest Keyboard Rest is a convenience accessory for Series 21 Operator Stations. It extends the front of the keyboard, providing a place for the operator to rest his/her wrist during keying. This low-cost option is recommended for large-volume keying operations, where fatigue could 411111 adversely affect production. For further information on these and other Series 21 features, contact your Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 processing objectives. For example, r Decentralization: Boon To Management some businesses find that an intelligent key/disk system, with its pre-processing capabilities provides sufficient localization of computing power. Others, particularly smaller businesses, effectively rely on a locally- placed RJE or intelligent terminal to interface with a mainframe for report processing. D,. however, brings to any business the added dimension of customized processing on a local level, complementing_the high-volume work being done on a mainframe. Any enterprise can increase its managerial efficiency by providing department heads with a DDP management tool. The advantages to be gained go far beyond reduced paper flow. Benefits such as local data base management, improved work scheduling and fewer demands on central computing also result. Adapted from SYSTEMS magazine Current Trend Toward Individualism In pecember, 1977 the U.S. Census Bureau announced that the American population is evidencing a trend toward individualism. Factors such as smaller family size, more single-family dwellings and greater independence of the elderly were cited in the report. Similarly, many businesses have much of the individualism which characterizes the rest of society. Starting as small, personally-run enterprises, they grew into larger structures joined only by management or department heads. Individual managers were charged with the responsibility of meeting common corporate objectives within their own areas of specialization. Reliance On Specialists Reversed With increased specialization and diversification, data processing too developed its own specialists. Other departments had to rely on the combined skills of d.p. professionals for automation of their particular operation. This was understandable, because the high price tag of mainframe computers made it essential to spread the cost over many users. Economies of scale necessitated centralization of the computing function. The early 1970's saw a reversal of this trend. Low-cost componentry made the "personal" computer practical. It was difficult for individual managers to experiment with new methods while locked into a centralized system. Today's manager now has access to the computer-aided innovations which so often herald progress. DDP Is Child of Decentralization Although still in its infancy, distributed data processing (DDP) represents a major trend toward more accessible, up-to-date management information. In recent decades, management has been hampered by a "paper explojon",,Epper has been the traditional vehicle of information. Finding such information as current status of jobs in progress, --Oro -------- received of _g_q_c_l_c9n1:91101-TAAyays meant paging through voluminous ^eports. in the interest of greater efficiency, there is a real need to convert paper flow to information flow. DDP enables operations by extending computer intelligence into local offices, warehouses and factories. DDP Is Management Tool DDP may take various forms. There is no single way to satisfy all distributed Series 21 Highlights Check the following features of Series 21: 0 Building Block Architecture Start with only what you need, and grow as you go to more complex applications. O Turnkey System Formatted Data Entry Program (FDEP) and media utility routines give immediate usability. O User Programming Mohawk Business Oriented Langauge (MOBOL) enables customized processing of source data with System 21/40. O Interactive Processing Enables operator to interface with stored program for entry/retrieval of information in an intelligent environment. O Local File Storage Files can be keyed from source documents or transferred from central to remote sites to allow local data base inquiries. O Utilities MDS-provided programs allow data transfers between devices and edit routines for on-site printing. LI Multiple Operator Stations Up to four operator stations can O Three Keyboard Styles User may select data entry, key- punch or typewriter style key- boards for minimal operator training. D Large Display Screen 15" CRT with variable display attributes, blinking cursor, upper/ lower case, and 480 or 1920 character display capability. O Prompting Displayed messages guide operator step by step through complex transactions. O Operator Statistics Built-in counters in the FDEP monitor operator performance and other production factors. El Data Communications BSC and SDLC protocols for universal network compatibility. MDS 1200/2300/2400 Interface Direct channel interface provides data transfers with existing networks of MDS 2300 intelligent terminals or MDS 1200/2400 systems for high speed data communications compatibility with a wide range of computer the automation of rnany -- V8Zrknielease 2685*Aci'tbiZgrAgSa8R000700and1 -3 Appro Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 MDS Communication Terminals Speed EFT Handling For Manufacturers Hanover And Chemical Bank MDS System 2400 facilitates same-day processing of paperless transactions Manufacturers Hanover and Chemical Bank, both of New York, are two of a number of banks that are using electronic data processing systems to handle customers' "lock box" operations. Lock box is a special service extended to high-volume users like insurance companies and other _banking institutions whereby a bank sets up a collection point (like a post office box) for receiving transactions from the customer. At Manufacturers Hanover, an MDS System 2400 provides 24-hour data input functions, mainly for lock box operations, but with the ability to service other data transmission demands that occur. Peter Prestipino, officer in charge of the Data Entry Department's Technical Admini- stration says: "The new equipment is powerful enough to enable us to communicate with different computer systems and also leaves room for us to add on capabilities such as disks, card readers and printers. In essence, the equipment can grow as our demands for its use grow." According to assistant vice president Nicholas Siragusa, there are currently 1500 transactions transmitted daily to lock box customers. Chemical Bank provides lock box services to some 800 active customers and handles a volume of ,4.0,4 bout two million items. 21 post office pick-ups per day minimize peak load pile-ups and assure same-day handling. Once received, the items are Because Chemical Bank makes multiple deposits as late as 11 p.m., their lock box service assures a greater percentage of same-day deposits than the companies themselves would be able to during their own business hours. To expedite daily updating of accounts receivable records, Chemical transfers payment data to magnetic tape at three of its MDS data communications terminals. Tapes are then delivered to local customers, while distant customers receive their data via telecom- munication facilities. As part of its services, the bank receives tape transmissions from other lock box locations and pools the data as a summary of the day's payment transactions. An MDS communication terminal is then used to communicate data directly to the customer's main computer site. Another type of operation, Deposit Concentration, is one aspect of Manufacturers Hanover's involvement in Electronic Funds Transfer (EFT). They operate this system for bank customers with a large number of branches and provide the most efficient method of concentrating funds from local bank accounts into one concentration account. A daily transaction tape is transmitted via an MDS communications terminal directly to the customer's central office. "This system eliminates mail float as well as 50% of the paper flow involved readied for proces4nOrirvo'i= Pgrhieerreasen2IMO . systems," says Saul Jones, officer in charge of Customer Service for Lock Box and Deposit Concentration. "It is lower in cost and more controllable than wire transfer systems." MDS 21/40 Simulates On-Line Environment "In Series 21, MDS put the processing power where it's supposed to be," said Anthony Barashke pointing to the 15" video display screen. Barashke is data processing manager for Saxton Products, Inc., a manufacturer of decorative telephones and electronic products for the CB and hobbyist markets. An MDS System 21/40 with 3 operator stations and 3 diskette drives is installed at Saxton headquarters in Congers, N.Y.; a 2.5 megabyte disk drive will eventually be added. A second 21/40 with 2 stations is at their distribution center in nearby Nyack Both systems are user programmable via MOBOL (Mohawk Business Oriented Language). Barashke's staff is presently writing MOBOL programs to handle Saxton's order entry and inventory control applications. Initially, both systems are programmed for data entry and validation under control of a Formatted Data Entry package provided by MDS. "The ability to get our systems up and running right away, without having to program it ourselves, was instrumental in our selection of Series 21", Barashke said. Source data is presently hand-carried from the Nyack distribution center for processing at Saxton headquarters. Information from two other Saxton distribution centers ? Rockford, Ill. liell9s81W-W1508ti-V-0988R000700020001-3 Cont. on next page Approved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3 Great Western Sugar Forms DDP Network The Great Western Sugar Company of Denver, Colorado has implemented the first distributed data processing network involving MDS Series 21 systems. Three MDS System 21/40's link Great Western's corporate processing center, sugar cane factory and central headquarters via standard telephone facilities. Information flow between company locations has improved by an order of magnitude, with one week turnaround shortened to one day. Several factors account for the improvement: ? source data entry, ? pre-editing capability, and ? substitution of data transmission for postal communications. Accounting data formerly mailed from Great Western's headquarters in Dallas, Texas to their Denver keypunching center is now captured at the source. A Dallas operator enters accounts payable and general ledger information on Series 21 diskette, and transmits the files to Denver for same- day processing on their Burroughs 4700 mainframe. The remote MDS system is programmed for extensive data validation such as batch balancing, check digits, table lookups and range checks. Richard Gentry, MIS Director for Great Western Sugar said: "The ability to validate data at the source, prior to mainframe processing, is a tremendous advantage. Replacement of 'dumb' data capture devices with intelligent Series 21 gave us pre- editing capability for the first time; there's no way to measure the value of that!" Great Western's sugar cane factory in Louisiana utilizes their System 21/40 to prepare applications involving order entry, payroll, inventory control and standard costs budgeting. There too, extensive use is made of Series 21's ability to pre-edit each transaction. Series 21 intelligence has virtually eliminated error runs on the mainframe, with little need to return exception reports to the source for re- keying. Each day, completed files are transmitted to Denver in unattended mode via Series 21 tape drives at the two remote sites. During the night, the processed files are returned unattended so reports can be produced the next morning on the remote Series 21 printers. Through these daily exchanges, Great Western's corporate, manufacturing and processing facilities remain current and in step with one another. MDS 21/40 cont. and Cerritos, Calif. ? is transmitted from IBM 3741's at the remote facilities. Barashke explained that the 3741 has a small screen which displays only 3 lines of data and has limited operator prompting capability. "With System 21/40, we can emulate an on-line system", Barashke said. "This means we can move terminals out into operating departments, such as accounts payable. Personnel there can learn to use the system simply by looking at the screen. That also means less reliance on data entry specialists who are becoming harder to find." Once Saxton people have developed and tested the needed application programs in MOBOL, the Nyack system will be replicated at the other two distribution centers. The remote systems will include abbreviated customer and item files, stored on disk and available for access by remote site operators. "This will give us data editing capability at the remote locations for the first time", Barashke said. "Local storage capability will also ease the demand on our mainframe". "It does cost a bit more per month to replace an essentially 'dumb' device with a distributed processing system", he concluded, "but the extra capabilities such as user programmability and data formatting will lead to personnel cost reductions, better response to customers and increased efficiency throughout our organization. That's a worthwhile investment!" DATA-FLO Mohawk Data Sciences Corp. Marketing Communications Dept. Palisade Street Herkimer, N.Y. 13350 (315) 797-7445 Data-Flo is a regular publication of- Mohawk Data Sciences Corp., Parsippany, N.J. With this newsletter, we aim to keep Mohawk Data users abreast of the latest time-saving/money-saving techniques being employed in EDP shops worldvlide. We will also supply current information on the continually evolving MDS product line. Editorial comments and story contributions from Data-Flo readers are welcome. To obtain copies of Data-Flo, contact Walt Sexton, Editor at the above address. Printed in U.S.A. by MIAPPFers? losio ved For Release 2005/07/12 : CIA-RDP85-00988R000700020001-3