NPIC DATA SYSTEM DATA AND CONTROL SEGMENT ACQUISITION PHASE APPENDIX C3 WBS DICTIONARY

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP84T00037R000300060001-2
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
120
Document Creation Date: 
December 28, 2016
Document Release Date: 
July 5, 2007
Sequence Number: 
1
Case Number: 
Publication Date: 
March 31, 1982
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP84T00037R000300060001-2.pdf4.3 MB
Body: 
Approved For Release 20077//007//0055: CIA-RDP84T00037R000300060001-2 / e(I d NPIC DATA SYSTEM DATA AND CONTROL SEGMENT ACQUISITION PHASE APPENDIX C3 WBS DICTIONARY STAT Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 NPIC DATA SYSTEM DATA AND CONTROL SEGMENT ACQUISITION PHASE APPENDIX C3 WBS DICTIONARY STAT ? STAT Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 V WBS TITLE Project Management plus senior level managers for Provide Project Management Including NDPO Interface Provide Project Management Including NDPO Interface Provide Project Management Including NDPO Interface Monitor, Control and Report Schedule Status Includes project management for BOC. This covers: Project Manager, Deputy Project Manager and Program Control Manager. It also includes related administrative/ secretarial support. Identical to 641100, except this element covers the FOC phase. Identical to 641100 except this element covers the IOC phase. Covers project control to monitor/control/ report schedule status through BOC. Includes preparation of CDRL's 101, 103, 107, 110, 111, 113, 114. This element also includes Facility Planning Support and Data Management for Pro- ject Control Office and general administrative support. Monitor, Control and Report Schedule Status WBS DESCRIPTION This category includes the project manager Identical to 641200, except this element covers the IOC phase. 641202 4.1.2 Monitor, Control and Report Schedule Status Identical to 641200, except this element covers for FOL phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 V WBS TITLE Monitor, Control and Report Cost Status Monitor, Control and Report Cost Status Monitor, Control and Report Cost Status Provide Quality Assurance Plan Implement Software Quality Assurance Implement Software Quality Assurance Implement Software Quality Assurance WBS DESCRIPTION ? This includes the effort to structure the contract consistent with 7000.2 require- ments, program control reviews, monitoring of subcontracts and overall cost monitor- ing. This element covers the BOC phase and preparation of CDRL Items #102 and #109. Identical to 641203, except this element covers the IOC phase and preparation of CDRL #109 only. Identical to 641203, except this element covers the FOC phase and preparation of CDRL #109 only. Covers the production of the Quality Assurance Plan (CDRL #108). This effort includes: QA program management; document inspection, design, development, and testing monitoring and control; correc- tive action monitoring; configuration assurance; design/code inspections monitor- ing; and contract adherance. This element covers the BOC phase. Identical to 641301, except this element covers the IOC phase. Identical to 641301, except this element covers the FOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 0 w S IBM WBS NO. RFP WBS NO. WBS TITLE Implement Hardware Quality Assurance Implement Hardware Quality Assurance WBS DESCRIPTION This effort includes: participation in all reviews (PDR, CDR, etc.), CDRL review and approval; inspection plan preparation; procurement support; CCB participation; coordination with Data Processing Division on ADPE equipment; safety inspection coordination; and QA program management. This element covers the BOC phase. Identical to 641304, except this element covers the IOC phase. 641307 4.1.3 Implement Hardware Quality Assurance Monitor Subcontractor Quality Assurance Monitor Subcontractor Quality Assurance Identical to 641304, except this element covers the FOC phase. This covers the monitoring subcontractor Quality Assurance Plan and Program. This includes monitoring and auditing of the subcontractors QA program implementation including periodical visits and review of all work products. This element also, covers as required assistance to the sub- contractor in QA matters. This element covers the BOC phase. Identical to 641307, except this element covers the IOC phase. Monitor Subcontractor Quality Assurance Identical to 641307, except this element covers the FOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w WBS TITLE Provide QA Audit Reports Provide QA Audit Reports Provide QA Audit Reports Prepare and Maintain CM Plan and Procedures and Documentation Prepare and Maintain Engineering Change Notices/ Request and Other CM Related Documents Prepare and Maintain Engineering Change Notices/ Request and Other CM Related Documents Prepare and Maintain Engineering Change Notices/ Request and Other CM Related Documents ? WBS DESCRIPTION This element covers the preparation of the QA Audit Reports (CDRL #149) during the BOC phase. Does not include typist and tech- nical publications effort associated with these reports. Identical to 641310, except this element covers the IOC phase. Identical to 641310, except this element covers the FOC phase. This element includes the preparation of the Configuration Management Plan (CDRL #106). It also includes the administration and supervision of CM activities including coordination with subcontractors and the NDPO. This element covers the BOC phase. This element includes the preparation and processing of all change documents (e.g. ECP/ECN/SCN/ECO/etc.) during the BOC phase. Identical to 641401, except this element covers the IOC phase. Identical to 641401, except this element covers the FOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w ? IBM WBS NO. RFP WBS NO. UI 641408 4.1.4 WBS TITLE Perform CM Audits Perform CM Audits Provide Master Product and Document Control Provide Master Product and Document Control Provide Master Product and Document Control Prepare and Maintain Software Version Descrip- tion Document Prepare and Maintain Software Version Descrip- tion Document Prepare and Maintain Software Version Descrip- tion Document WBS DESCRIPTION This element includes the preparation and support to functional and physical con- figuration audits during the BOC phase. Identical to 641404, except this element covers the IOC phase. Identical to 641404, except this element covers the FOC phase. This includes the CM library activity in maintaining baseline products, specifica- tions, and the processing and distribution of SCN during the BOC phase. Identical to 641407, except this element covers the IOC phase. Identical to 641407, except this element covers the FOC phase. This includes the preparation and mainte- nance of the software version Description Document (CDRL #152) during the BOC phase. Identical to 641410, except this element covers the IOC phase. Identical to 641410, except this element covers the FOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w ? IBM WBS NO. RFP WBS NO. rn 641417 4.1.4 WBS TITLE Administer the Contractor CCB Administer the Contractor CCB Administer the Contractor CCB Provide Change Status Accounting Provide Change Status Accounting Provide Change Status Accounting Prepare Project Security Plan and Security Procedures Implement Security Procedures WBS DESCRIPTION This element includes the administration of Project Configuration Control Board. This effort includes preparation of agendas, minutes, etc. for the BOC phase. Identical to 641413, except this element covers the IOC phase. Identical to 641413, except this element covers the FOC phase. This element covers the processing of the monthly system accounting for ECP and baseline management during the BOC phase. Identical to 641416, except this element covers the IOC phase. Identical to 641416, except this element covers the FOC phase. Covers the preparation of the Security Plan (CDRL #105) during the BOC phase. This element covers the implementation and monitoring of special security requirements mandated by the Government. This includes: document control, clearance, physical security, personnel briefings, visitor control, computer security, etc. This element covers the BOC phase. Implement Security Procedures Identical to 641501, except this element covers the IOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w WBS TITLE Implement Security Procedures Provide Monthly Status Reviews Provide Monthly Status Reviews Provide Monthly Status Reviews Provide Management Control and Visibility to Cost Schedule Provide Management Control and Visibility to Cost Provide Management Control and Visibility to Cost Provide Management, Control and Visibility to Cost Schedule Provide Management, Control and Visibility to Cost Schedule WBS DESCRIPTION Identical to 641501, except this element covers the FOC phase. Coordination and preparation of monthly Status Reviews (CDRL #112) during the BOC phase. Identical to 641600, except this element covers the IOC phase. Identical to 641600, except this element covers the FOC phase. This covers the subcontract management coordination of during the BOC phase. Identical to 641700, except this element covers the IOC phase. Identical to 641700, except this element covers the FOC phase. This covers the subcontract management coordination of the during the BOC phase. Identical to 641703, except this element covers the IOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? STAT STAT SIAI STAT STAT STAT STAT STAT ? IBM WBS NO. RFP WBS NO. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w WBS TITLE Provide Management, Control and Visibility to Cost Schedule Provide Management, Control and Visibility to Cost Schedule of Provide Management, Control and Visibility to Cost Provide Management, Control and Visibility to Cost STAT STAT STAT STAT STAT STAT Provide Publication, Main- tenance and Control of All Project Documentation Provide Publication, Main- tenance and Control of All Project Documentation Provide Publication, Main- tenance and Control of All Project Documentation WBS DESCRIPTION Identical to 641703, except this element covers the FOC phase. This covers the subcontract management coordination of during the BOC p~. Identical to 641706, except this element covers the IOC phase. Identical to 641706, except this element covers the FOC phase. ? This covers the publication, maintenance and control of all project documents including the Accession List (CDRL #156) and PDR, CDR, and quarterly review during the BOC phase. This covers the publication, maintenance and control of all project documents including the Accession List (CDRL #156) and CDR and quarterly reviews during the IOC phase. This covers the publication, maintenance and control of all project documents including the Accession List (CDRL #156) and CDR and quarterly reviews during the FOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w WBS TITLE Prepare and Administer Document Management Plan System Engineering Provide Technical Manage- ment of Project Provide Technical Manage- ment of Project Provide Technical Manage- ment of Project Provide/Enforce Software- Opns-Hardware Interface Standards Provide/Enforce Software- Opns-Hardware Interface Standards WBS DESCRIPTION ? This covers the preparation and administra- tive of the Document Management Plan during the BOC phase. This category includes system level engineers and programmer analysts engaged in: system engineering management, analysis, operations engineering and development, design, transi- tion and integration planning and support, test support, CM support and technical reviews. This covers the technical management of the system engineering effort by a senior level manager during the BOC phase. Administra- tive support is included. Identical to 642100, except this element covers the IOC phase. Identical to 642100, except this element covers the FOC phase. This covers the preparation and administra- tion of standards to control interface designs between SW, Opr and HW elements (CDRL #118). Preparation follows parent document developed by SI. This element covers the BOC phase. Identical to 642103, except this element covers the IOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE Provide/Enforce Software- Opns-Hardware Interface Standards Prepare Segment Development Plan Provide Requirements Analysis and Traceability Provide Requirements Analysis and Traceability Provide Requirements Analysis and Traceability Provide Performance Analysis Provide Performance Analysis WBS DESCRIPTION Identical to 642103, except this element covers the FOC phase. This covers the development and preparation of the Segment Development Plan (CDRL #104) during the BOC phase. This covers the development and preparation of the Requirements Traceability and Verifi- cation Matrix (CDRL #119) during the BOC phase. Identical to 642200, except this element covers the IOC phase. Identical to 642200, except this element covers the FOC phase. This covers the technical performance measurement activities and the relevant document (CDRL #155) during the BOC phase. Identical to 642203, except this element covers the IOC phase. Provide Performance Analysis Provide RMA Analysis Identical to 642203, except this element covers the FOC phase. Covers reliability/maintainability/ availability analysis, preparation of inputs to PDR, CDR documents, review of subcon- tractor RMA analysis. This element covers the BOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/0 5: Cl A-RDP84T00037R000300060001-2 IBM WBS NO. RFP WBS NO. WBS TITLE Provide RMA Analysis Provide RMA Analysis Prepare Segment Design Analysis Report Prepare Segment Design Analysis Report Prepare Segment Design Analysis Report Accomplish Trade Studies Accomplish Trade Studies Accomplish Trade Studies Provide Engineering Specialties Provide Support to Intersegment Interface Definition and Require- ments Determination WBS DESCRIPTION This element repeats the activities of 642206 and includes review of RMA pre- dictions for possible changes. This element covers the IOC phase. Identical to 642207, except this element covers the FOC phase. This covers the development and preparation of the Segment Design Analysis Report (CDRL #122) during the BOC phase. Identical to 642209, except this element covers the IOC phase. Identical to 642209, except this element covers the FOC phase. This covers the performance of trade studies during the BOC phase. Identical to 642212, except this element covers the IOC phase. Identical to 642212, except this element covers the FOC phase. Provides for engineers engaged in integrated logistics support and human factors design during the BOC phase. This covers the development of interface control specifications and participation in the Interface Control Working Group (ICWG) to assure compatability between the D/C Segment, other segments and external inter- faces during the BOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE Provide Support to Intersegment Interface Definition and Require- ments Determination Provide Support to Intersegment Interface Definition and Require- ments Determination Prepare Engineering Technical Notes Prepar Engineering Technical Notes Prepar Engineering Technical Notes Develop Segment Operation, Concepts, Procedures, and Specifications, Including Human Factors Engineering WBS DESCRIPTION Identical to 642218, except this element covers the IOC phase. Identical to 642218, except this element covers the FOC phase. Covers preparation of Engineering Technical Notes (CDRL #120) during the BOC phase. Identical to 642221, except this element covers the IOC phase. Identical to 642221, except this element covers the FOC phase. This element covers the development and preparation of the Segment Operations Specification (CDRL #133) during the BOC phase. Develop Segment Operations, Concepts, Procedures and Specification, Including Human Factor Engineering This covers the effort required to revise the Segment Operation Concept (CDRL #116) and the Segment Operations Specification (CDRL #133) during the IOC phase. Develop Segment Operations, Concepts, Procedures, and Specifications, Including Human Factor Engineering Identical to 642301, except this element covers the FOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w IBM WBS NO. RFP WBS NO. WBS TITLE Develop User Manuals Develop User Manuals Develop User Manuals Develop Segment/Systems Operation Manuals Develop Segment/System Operation Manuals Develop Segment/System Operation Manuals WBS DESCRIPTION Covers the development of User Manuals (CDRL #135) that provide all necessary information and procedures for qualified users to access and interact with the system during the BOC phase. Identical to 642303, except this element covers the IOC phase. Identical to 642303, except this element covers the FOC phase. Covers the development of Operators Manuals (CDRL #136) which provide computer opera- tions personnel with a detailed operational description of the system and operating instructions. This element covers the BOC phase. Identical to 642306, except this element covers the IOC phase. Identical to 642306, except this element covers the FOC phase. Conduct Productivity Enhancement Studies This element provides for the performance of productivity enhancement studies that focus on making system operations more efficient. This element covers the BOC phase. 642310 4.2.3 Conduct Productivity Enhancement Studies Identical to 642309, except this element covers the IOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. WBS TITLE Conduct Productivity Enhancement Studies Prepare O&M Plan Prepare O&M Plan Prepare O&M Plan Prepare Maintenance and Logistics Plan Prepare Maintenance and and Logistics Plan WBS DESCRIPTION Identical to 642309, except this element covers the FOC phase. Covers the preparation of the O&M Plan (CDRL #123) which details the types and numbers of positionings, responsibilities, organization, etc., for performance of O&M during the BOC phase. Covers the effort required to revise the O&M Plan (CDRL #123) during the IOC phase. Identical to 642313, except this element covers the FOC phase. Covers the preparation of the Maintenance and Logistics Plan (CDRL #124) which defines the activities to be performed to ensure the availability of the required maintenance and logistics resources. Also includes monitoring the technical performance of the subcontractor. This element covers the BOC phase. Includes the effort required to revise the Maintenance and Logistics Plan (CDRL #124) during the IOC phase. Prepare Maintenance and Logistics Plan Identical to 642316, except this element covers the FOC phase. Prepare Segment Design Specification Including Requirements Allocation Includes the preparation of the Segment Design Specification (CDRL #117) during the BOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? V IBM WBS NO. RFP WBS NO. WBS TITLE Provide Data Base Specification Provide Engineering Specialties Design Provide SW-Opns-HW Interface Design Provide SW-Opns-HW Interface Design Provide SW-Opns-HW Interface Design Develop Segment Transition and Integration Plan Develop Segment Transition and Integration Plan WBS DESCRIPTION Covers the preparation of the Data Base Specification (CDRL #125) which details the relationship of the data base storage requirement of all CPCI's in the segment to the storage capability of the segment. This element covers the BOC phase. Covers the engineering specification design effort performed in the BOC phase. Effort to development the Operations/ Software, Operations/Hardware, Hardware/ Software and Software/Software Interface Specs CDRL's 126, 127, 128 and 129 respec- tively. Covers BOC phase. Identical to 642405, except this covers IOC phase. Identical to 642405, except this covers FOC phase. Covers the preparation of the Segment Transition/Integration Plan (CDRL #115) during the BOC phase. Identical to 642500, accept their element covers the IOC phase. Develop Segment Transition and Integration Plan Support Facility Planning Installation and Checkout Identical to 642500, accept their element covers the FOC phase. Includes the effort by system engineers to support the facility planning task and the installation and checkout task during the BOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE Support Facility Planning Installation and Checkout Support Facility Planning' Installation and Checkout Support Transition of New Capability Into the Oper- ational Environment Support Transition of New Capability Into the Oper- ational Environment Support Transition of New Capability Into the Oper- ational Environment Prepare Segment Verifica- tion Plan Prepare Segment Verifica- tion Plan Prepare Segment Verifica- tion Plan WBS DESCRIPTION Identical to 642503, except this element covers the IOC phase. Identical to 642503, except this element covers the FOC phase. Covers the effort by system engineers to support the transition of new capability into the operational environment during the BOC phase. Identical to 642506, except this element covers the IOC phase. Identical to 642506, except this element covers the FOC phase. Covers the preparation of the Segment Veri- fication Plan (CDRL #121) during the BOC phase. Identical to 642600, except this element covers the IOC phase. Identical to 642600, except this element covers the FOC phase. Prepare Segment Test Plan Covers the preparation of the Segment Test Plan (CDRL #130) during the BOC phase. 642604 4.2.6 Prepare Segment Test Plan Identical to 642603, except this element covers the IOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. WBS TITLE Prepare Segment Test Plan Support the Execution and Evaluation of Tests Support the Execution and Evaluation of Test Support the Execution and Evaluation of Test Evaluate Proposed Changes and Provide Change Request Impact Analysis Including Interface Control Evaluate Proposed Changes and Provide Change Request Impact Analysis Including Interface Control Evaluate Proposed Changes and Provide Change Request Impact Analysis Including Interface Control WBS DESCRIPTION Identical to 642603, except this element covers the FOC phase. Provide support to execution and evaluation of tests during the BOC phase. Identical to 642606, except this element covers the IOC phase. Identical to 642606, except this element covers the FOC phase. Covers the effort required to evaluate proposed changes and provide change request impact analysis including interface control during the BOC phase. Identical to 642700, except this element covers the IOC phase. Identical to 642700, except this element covers the FOC phase. Covers the effort required to prepare for and participate in the PDR technical review during the BOC phase. Covers the effort to prepare for and participate in the PDR technical update review during the IOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE CDR Technical Review CDR Technical Review CDR Technical Review SDR Technical Review Conduct Technical Audits/ Misc. Reviews Conduct Technical Audits/ Misc. Reviews Conduct Technical Audits/ Misc. Reviews WBS DESCRIPTION Covers the effort required to perform the CDR Technical Review during the BOC phase. Identical to 642803, except this element covers the IOC phase. Identical to 642803, except this element covers the FOC phase. Cover the effort required to perform the SDR technical review during the BOC phase. This element includes the effort required to conduct the technical audits and mis- cellaneous reviews as required. This ele- ment covers the BOC phase. Identical to 642809, except this element covers the IOC phase. Identical to 642809, except this element covers the FOC phase. Software Development (BOC) Manage All SW Development Activities This covers the software development effort during the BOC phase and includes the fol- lowing functions: management, preliminary design, critical design, development, test and documentation. This covers the efforts of second and third level management functions required to man- age the SW development tasks in the BOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. 643002 4.3.1 643003 4.3.1 643004 4.3.1 643005 4.3.1 643007 4.3.1 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w WBS WBS TITLE DESCRIPTION NPIC Specific SW Training SW Tool Development SW Architecture ? This covers the purchase of the commercial training course needed to train programmer personnel associated with the UNIVAC System and the COBOL programming language during the BOC phase. Includes the development and/or assembly of specific tools required for D/C Segment SW development such as: Add COBOL to STI, provide o UNIVAC download capability for test. This element covers the BOC phase. Covers the effort required to ensure SW architectural integrity during the BOC phase. Technical Support to Covers the software development effort Subcontract Management required to support Subcontract Management to ensure technical oversight during the phase. Segment PPS&C Covers the effort required to produce the Segment Programming, Practices, Standards and Convention (CDRL #132) during the BOC phase. This is prepared to be compatable with the System Integrators PPS&C. Covers the purchase of COBOL code conversion services during the BOC phase to convert unmodified code from the UNIVAC to processor. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 STAT STAT ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. 643009 4.3.1 643010 4.3.1 643011 4.3.1 643012 4.3.1 643014 4.3.1 643015 4.3.1 WBS WBS TITLE DESCRIPTION Library Control Covers the performance of routine source library maintenance/control activities during the BOC phase. SW Builds and Releases Perform software builds and maintain soft- ware version control/documentation. Main- tain hard copy control. This element covers the BOC phase. Provide Inputs to Segment Prepare and maintain the software section Development Plan of the Segment Development Plan during the BOC phase. DMS 1100 Level 6 to Level 8 Covers the conversion of DMS 1100 from Conversion Level 6 to Level 8. This includes planning design, implementation, and test. This element covers the BOC phase. Data Base Conversion Covers the conversion of the data base needed Design, Implementation, for BOC from DMS 1100 base to M204 base. Verification Included are planning, design, conversion utility creation, file conversion, and verification. This element covers the BOC phase. Data Base Package This covers the preparation of the Data Base Package (CDRL #151) which defines the actual entries to be used for initializing each data base item. This element covers the BOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. WBS TITLE 643016 4.3.1 Data Base Support to Development and Test and Verification 643017 4.3.2.1 Requirements Analysis and Allocation 643018 4.3.2.1 Prepare (Prelim.) Design Part I Specs. and Conduct Internal Design Reviews 643019 4.3.2.1 Prepare Data Dictionary 643020 4.3.2.1 Prepare (Prelim) Part II Specs. WBS DESCRIPTION This effort includes the Data Base Admin- istration function and production of the final version of the Data Base Administra- tion Manual (CDRL #137) during the BOC phase. This covers the CPCI BEPPRE during the BOC phase and includes the design effort which provides for analysis of Segment Design specification functions and their alloca- tions to individual CPCI's (and CI's). This effort occurs after completion of the Design Concept Review and leads to the generation of the CPCI Part I specs. for PDR. preliminary CPCI Part II specification (CDRL #142). This covers the CPCI BEPPRE during the BOC phase and includes the preparation of the CPCI preliminary Part I specification (CDRL #141) and participation in internal design reviews. This effort is performed by the System Engineering group and augmented by the SW Development group which supports requirements allocation and development of the Part I specs. This covers the CPCI BEPPRE during the BOC phase and includes the preparation of the Data Dictionary (CDRL #145). The Data Dictionary contains a description of every data item in D/C Segment file. This covers the CPCI BEPPRE during the BOC phase and includes the preparation of the Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. WBS TITLE Prepare CPCI Test Plan (Prelim.)-Appendix for BEPPRE Prepare Build-to Part II Specs. and Conduct Internal Design Review Prepare (Prelim.) Programmers Manual Prepare CPCI Test Plan (Final)-Appendix for BEPPRE WBS DESCRIPTION This covers the CPCI BEPPRE during the BOC phase and includes the preparation of the preliminary CPCI Test Plan (CDRL #131). This covers the CPCI BEPPRE during the BOC phase and includes the preparation of the CPCI Part II Specification or the "build-to" specification (CDRL #142) and participation in internal design reviews. This covers the CPCI BEPPRE during the BOC phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). This covers the CPCI BEPPRE during the BOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). This covers the CPCI BEPPRE during the BOC phase and includes the development of source code at the module level, its unit test and debug. Integrate and Test to CPC Level Test at the CPC and CPCI Levels This covers the CPCI BEPPRE during the BOC phase and includes the SW development acti- vities to integrate and test modules up to CPC level. This covers the CPCI BEPPRE during the BOC phase and includes the formal testing by the T&V group. This testing consists of PQT testing of CPC/Strings and FQT testing of complete CPCI's and their interfaces with other CPCI's. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. 643028 4.3.2.4 643029 4.3.2.4 643030 4.3.2.4 643031 4.3.2.5 643032 4.3.2.5 643034 4.3.2.5 WBS WBS TITLE DESCRIPTION Develop SW Test Procedures This covers the CPCI BEPPRE during the BOC phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps, environment and data to be collected. Support Test and This covers the CPCI BEPPRE during the BOC Verification phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error corrections. Prepare Test Reports This covers the CPCI BEPPRE during the BOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. Prepare Inputs to User, This covers the CPCI BEPPRE during the BOC Operator and Data Base phase and includes the preparation of inputs Administration Manuals to Users Manual (CDRL #135), Operator Manual (CDRL #136), and Data Base Administrators Manual (CDRL #137). CPCI Listings As-built This covers the CPCI BEPPRE during the BOC phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI (CDRL #150). Prepare Programmers This covers the CPCI BEPPRE during the BOC Manual (Final) phase and includes the preparation of final version of the Programmers Manual (CDRL #138). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 . Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM RFP WBS WBS NO. WBS NO. TITLE 643035 4.3.2.5 Prepare Inputs to Training Manuals 643036 4.3.2.5 Prepare As-Built Part II Specs. 643037 4.3.2.1 Requirements Analysis and Allocation WBS DESCRIPTION This covers the CPCI BEPPRE during the BOC phase and includes the preparation inputs to the various training manuals. This covers the CPCI BEPPRE during the BOC phase and includes the preparation of the "as-built" version of the CPCI Part II specs. (CDRL #142). The "as-built" version defines the exact configuration of accepted computer programs. provides for analysis of Segment Design specification functions and their alloca- tions to individual CPCI's (and CI's). This effort occurs after completion of the Design Concept Review and leads to the generation of the CPCI Part I specs. for PDR. This covers the CPCI BEMGMT during the BOC phase and includes the design effort which 643038 4.3.2.1 Prepare (Prelim.) Design This covers the CPCI BEMGMT during the BOC Part I Specs. and Conduct phase and includes the preparation of the Internal Design Reviews CPCI preliminary Part I specifications (CDRL #141) and participation in internal design reviews. This effort is performed by the System Engineering group and aug- mented by the SW Development group which supports requirements allocation and development of the Part I specs. 643039 4.3.2.1 Prepare Data Dictionary This covers-the CPCI BEMGMT during the BOC phase and includes the preparation of the Data Dictionary (CDRL #145). The Data Dictionary contains a description of every data item in D/C Segment file. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. WBS TITLE Prepare (Prelim.) Part II Specs. Prepare CPCI Test Plan (Prelim.) Appendix for BEMGMT Prepare Build-to Part II Specs. and Conduct Internal Design Review Prepare (Prelim.) Programmers Manual Prepare CPCI Test Plan (Final) - Appendix for BEMGMT WBS DESCRIPTION This covers the CPCI BEMGMT during the BOC phase and includes the preparation of the preliminary CPCI Part II specifications (CDRL #142). This covers the CPCI BEMGMT during the BOC phase and includes the preparation of the preliminary CPCI Test Plan (CDRL #131). This covers the CPCI BEMGMT during the BOC phase and includes the preparation of the CPCI Part II Specification or the "build-to" specification (CDRL #142) and participation in internal design reviews. This covers the CPCI BEMGMT during the BOC phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). This covers the CPCI BEMGMT during the BOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). Integrate and Test to CPC Level This covers the CPCI BEMGMT during the BOC phase and includes the development of source code at the module level, its unit test and debug. This covers the CPCI BEMGMT during the BOC phase and includes the SW development activities to integrate and test modules up to CPC level. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. 643047 4.3.2.4 643048 4.3.2.4 643049 4.3.2.4 643050 4.3.2.4 643051 4.3.2.5 643052 4.3.2.5 WBS WBS TITLE DESCRIPTION Test at the CPC and CPCI This covers the CPCI BEMGMT during the BOC Levels phase and includes the formal testing by the T&V group. This testing consists of PQT testing of CPC/Strings and FQT testing of complete CPCIs and its interface with other CPCIs. Develop SW Test Procedures This covers the CPCI BEMGMT during the BOC phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps and environment data to be collected. Support Test and Verification This covers the CPCI BEMGMT during the BOC phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. Prepare Test Reports This covers the CPCI BEGMGT during the BOC phase and includes activities by the T&V group to prepare formal test reports on the results of PQT/FQT testing. Prepare Inputs to User, This covers the CPCI BEGMGT during the BOC Operator, and Data Base phase and includes the preparation of inputs Administration Manuals to User Manual (CDRL #135), Operators Manual (CDRL #136), and Data Base Administrators Manual (CDRL #137). CPCI Listings As-Built This covers the CPCI BEMGMT during the BOC phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI (CDRL #150). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. 643053 4.3.2.5 643054 4.3.2.5 643055 4.3.2.5 643056 4.3.2.1 WBS WBS TITLE DESCRIPTION Prepare Programmers Manual This covers the CPCI BEMGMT during the BOC (Final) phase and includes the preparation of final version of the Programmers Manual (CDRL #138). Prepare Inputs to Training This covers the CPCI BEMGMT during the BOC Manuals phase and includes the preparation inputs to the various training manuals. Prepare As-Built Part II Specs. This covers the CPCI BEMGMT during the BOC phase and includes the preparation of the "as-built" version of the CPCI Part II specs (CDRL #142). The "as-built" version defines the exact configuration of accepted computer programs. Requirements Analysis and This covers the CPCI BERESU during the BOC Allocation phase and includes the design effort which provides for analysis of Segment Design specification functions and their alloca- tions to individual CPCIs (and CIs). This effort occurs after completion of the Design Concept Review and leads to the generation of the CPCI Part I specs. for PDR. 643057 4.3.2.1 Prepare (Prelim.) Design This covers the CPCI BERESU during the BOC Part I Specs. and Conduct phase and includes the preparation of the Internal Design Reviews CPCI preliminary Part I specification (CDRL #141) and participation in internal design reviews. This effort is performed by the System Engineering group and augmented by the SW Development group which supports requirements allocation and development of the Part I specs. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE Prepare Data Dictionary Prepare (Prelim.) Part II Specs. Prepare CPCI Test Plan (Prelim.) Appendix for BERESU Prepare Build-to Part II Specs. and Conduct Internal Design Review Prepare (Prelim.) Programmers Manual WBS DESCRIPTION This covers the CPCI BERESU during the BOC phase and includes the preparation of the Data Dictionary (CDRL #145). The Data Dictionary contains a description of every data item in D/C Segment file. This covers the CPCI BERESU during the BOC phase and includes the preparation of the preliminary CPCI Part II specification (CDRL #142). This covers the CPCI BERESU during the BOC phase and includes the preparation of the preliminary CPCI Test Plan (CDRL #131). This covers the CPCI BERESU during the BOC phase and includes the preparation of the CPCI Part II specification or the "build-to" specification (CDRL #142) and participation in internal design reviews. This covers the CPCI BERESU during the BOC phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). Prepare CPCI Test Plan (Final) Appendix for BERESO This covers the CPCI BERESU during the BOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). This covers the CPCI BERESU during the BOC phase and includes the development of source code at the module level, its unit test and debug. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. 643065 643066 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w RFP WBS WBS WBS NO. TITLE DESCRIPTION 4.3.2.3 Integrate and Test to CPC Level This phase ties covers the CPCI BERESU during the BOC and includes the SW development activi- to integrate and test modules up to CPC level. 4.3.2.4 Test at the CPC and CPCI Levels This covers the CPCI BERESU during the BOC phase and includes the formal testing by the T&V group. This testing consists of PQT testing of CPC/strings and FQT testing of complete CPCIs and its interface with other CPCIs. 643067 4.3.2.4 Develop SW Test Procedures This covers the CPCI BERESU during the BOC phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps and envi- ronment data to be collected. 643068 4.3.2.4 Support Test Verification This covers the CPCI BERESU during the BOC phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. 643069 4.3.2.4 Prepare Test Reports This covers the CPCI BERESU during the BOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. 643071 4.3.2.5 CPCI Listings As-built This covers the CPCI BERESU during the BOC phase and includes the listing of source instruction. Statements and ob- ject code for all CPC forming the CPCI (CDRL #150). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM RFP WBS WBS NO. WBS NO. TITLE 643074 4.3.2.5 Prepare As-Built Part # Specs. 643094 4.3.2.1 Requirements Analysis and Allocation WBS DESCRIPTION This covers the CPCI BERESU during the BOC phase and includes the preparation of the "as-built" version of the CPCI Part II specs. (CDRL #142). The "as- built" version defines the exact con- figuration of accepted computer pro- grams. provides for analysis of Segment Design specification functions and their alloca- tions to individual CPCI's (and CI's). This effort occurs after completion of the Design Concept Review and leads to the generation of the CPCI Part I specs. for PDR. This covers the CPCI BMANIP during the BOC phase and includes the design effort which 643301 4.3.2.1 Prepare (Prelim.) Design This covers the CPCI BMANIP during the Part I Specs. and Conduct BOC phase and includes the preparation Internal Design Reviews of the CPCI preliminary Part I specifi- cation (CDRL #141) and participation in internal design reviews. This effort is preformed by the System Engineering group and augmented by the SW Development group which supports requirements allocation and development of the Part I specs. 643095 4.3.2.1 Prepare Data Dictionary This covers the CPCI BMANIP during the BOC phase and includes the preparation of the Data Dictionary (CDRL #145). The Data Dictionary contains a description of every data item in D/C Segment file. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE Prepare (Prelim.) Part II Specs. Prepare CPCI Test Plan (Prelim.) - Appendix for BMANIP Prepare Built-to Part II Specs. and Conduct Internal Design Review Prepare (Prelim.) Programmers Manual Prepare CPCI Test Plan (Final) - Appendix for BMANIP WBS DESCRIPTION This covers the CPCI BMANIP during the BOC phase and includes the preparation of the preliminary CPCI Part II specifica- tion (CDRL #142). This covers the CPCI BMANIP during the BOC phase and includes the preparation of the preliminary CPCI Test Plan (CDR #131). This covers the CPCI BMANIP during the BOC phase and includes the preparation of the CPCI Part II specification or the "Built-to" specification (CDRL #142) and participa- tion in internal design reviews. This covers the CPCI BMANIP during the BOC phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). This covers the CPCI BMANIP during the BOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). Integrate and Test to CPC Level This covers the CPCI BMANIP during the BOC phase and includes the development of source code at the module level, its unit test and debug. This covers the CPCI BMANIP during the BOC phase and includes the SW development activities to integrate and test modules up to CPC level. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE 643103 4.3.2.4 Test at the CPC and CPCI 643104 4.3.2.4 Levels Develop SW Test Procedures rw 643105 4.3.2.4 Support Test and Verification 643106 4.3.2.4 Prepare Test Reports 643107 4.3.2.5 Prepare Inputs to User, 643108 4.3.2.5 Operator and Data Base Administration Manuals CPCI Listings As-built WBS DESCRIPTION This covers the CPCI BMANIP during the BOC phase and includes the formal testing by the T&V group. This testing consist of PQT testing of CPC/Strings and FQT testing of complete CPCI's and its interface with other CPCI's. This covers the CPCI BMANIP during the BOC phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps and environment data to be collected. This covers the CPCI BMANIP during the BOC phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. This covers the CPCI BMANIP during the BOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. This covers the CPCI BMANIP during the BOC phase and includes the preparation ofinputs to Users Manual (CDRL #135), Operator Manual (CDRL #136), and Data Base Admini- strators Manual (CDRL #137). This covers the CPCI BMANIP during the BOC phase and includes the listing of source in- struction statements and object code for all CPC forming the CPCI (CDRL #150). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. 643109 4.3.2.5 643110 4.3.2.5 643111 4.3.2.5 643112 4.3.2.1 WBS WBS TITLE DESCRIPTION Prepare Programmers Manual This covers the CPCI BMANIP during the BOC (Final) phase and includes the preparation of final version of the Programmers Manual (CDRL #138). Prepare Inputs to Training This covers the CPCI BMANIP during the BOC Manuals phase and includes the preparation inputs to the various training manuals. Prepare As-Built Part II This covers the CPCI BMANIP during the BOC Specifications phase and includes the preparation of the "as-built" version of the CPCI Part II specs. (CDRL x/142). The "as-built" version defines the exact configuration of accepted computer programs. Requirements Analysis and This covers the CPCI BSTATR during the BOC Allocation phase and includes the design effort which provides for analysis of Segment Design specification functions and their allocations to individual CPCI's (and CI's). This effort occurs after completion of the Design Con- cept Review and leads to the generation of CPCI Part I specs. for PDR. 643113 4.3.2.1 Prepare (Prelim.) Design This covers the CPCI BSTATR during the Part I Specs. and Conduct phase and includes the preparation of Internal Design Reviews the CPCI preliminary Part I specifica- tion (CDRL #141) and participation in internal design reviews. This effort is performed by the System Engineering group and augmented by the SW development group which supports requirements allocation and development of the Part I specs. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE Prepare Data Dictionary Prepare (Prelim.) Part II Specs. Prepare CPCI Test Plan (Prelim.) - Appendix for BSTATR Prepare Built-to Part II Specs. and Conduct Internal Design Review Prepare (Prelim.) Programmers Manual WBS DESCRIPTION This covers the CPCI BSTATR during the BOC phase and includes the preparation of the Data Dictionary (CDRL #145). The Data Dictionary contains a descrip- tion of every data item in D/C Segment file. This covers the'CPCI BSTATR during the BOC phase and includes the preparation of the preliminary CPCI Part II specification (CDRL #142). This covers the CPCI BSTATR during the BOC phase and includes the preparation of the preliminary CPCI Test Plan (CDR #131). This covers the CPCI BSTATR during the BOC phase and includes the preparation of the CPCI Part II specification or the "build-to" specification (CDRL #142) and participation in internal design reviews. This covers the CPCI BSTATR during the BOC phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). 643120 4.3.2.3 Prepare CPCI Test Plan (Final) - Appendix for BSTATR This covers the CPCI BSTATR during the BOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). This covers the CPCI BSTATR during the BOC phase and includes the development of source code at the module level, its unit test and debug. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 is V IBM WBS NO. RFP WBS NO. 643121 4.3.2.3 643122 4.3.2.4 643123 4.3.2.4 643124 4.3.2.4 643125 4.3.2.4 643127 4.3.2.5 WBS WBS TITLE DESCRIPTION Integrate and Test to CPC This covers the CPCI BSTATR during the BOC Level phase and includes the SW development activities to integrate and test modules up to CPC level. Test at the CPC and CPCI This covers the CPCI BSTATR during the BOC Levels phase and includes the formal testing by the T&V group. This testing consist of PQT testing of CPC/Strings and FQT testing of complete CPCI's and its interface with other CPCI's. Develop SW Test Procedures This covers the CPCI BSTATR during the BOC phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps, environ- ment and data to be collected. Support Test and This covers the CPCI BSTATR during the BOC Verification phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. Prepare Test Reports This covers the CPCI BSTATR during the BOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. CPCI Listings As-built This covers the CPCI BSTATR during the BOC phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI (CDRL ##150). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM RFP WBS WBS NO. WBS NO. TITLE 643130 4.3.2.5 Prepare As-Built Part II Specs. 643149 4.3.2.1 Requirements Analysis and Allocation WBS DESCRIPTION This covers the CPCI BSTATR during the BOC phase and includes the preparation of the "as-built" version of the CPCI Part II specs. (CDRL #142). The "as-built" version defines the exact configura- tion of accepted computer programs. This covers the CPCI BMMGMT during the BOC phase and includes the design effort which provides for analysis of Segment Design specification functions and their alloca- tions to individual CPCI's (and CI's). This effort occurs after completion of the Design Concept Review and leads to the generation of the CPCI Part I specs. for PDR. 643150 4.3.2.1 Prepare (Prelim.) Design This covers the CPCI BMMGMT during the BOC Part I Specs. and Conduct phase and includes the preparation of the Internal Design Reviews CPCI preliminary Part I specification (CDRL #141) and participation in internal design reviews. This effort is preformed by the System Engineering group and augmented by the SW Development group which supports requirements allocation and development of the Part I specs. 643151 4.3.2.1 Prepare Data Dictionary This covers the CPCI BMMGMT during the BOC phase and includes the preparation of the Data Dictionary (CDRL #145). The Data Dictionary contains a description of every data item in D/C Segment file. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE Prepare CPCI Test Plan (Prelim.)- Appendix for BMMGMT Prepare CPCI Test Plan (Final) - Appendix for BMMGMT Integrate and Test to CPC Level Test at the CPC and CPCI Levels WBS DESCRIPTION This covers the CPCI BMMGMT during the BOC phase and includes the preparation of the preliminary CPCI Test Plan (CDR #131). This covers the CPCI BMMGMT during the BOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). This covers the CPCI BMMGMT during the BOC phase and includes the SW development activities to integrate and test modules up to CPC level. This covers the CPCI BMMGMT during the BOC phase and includes the formal testing by the T&V group. This testing consist of PQT testing of CPC/Strings and FQT testing of complete CPCI's and its interface with other CPCI's. Develop SW Test Procedures Support Test and Verification This covers the CPCI BMMGMT during the BOC phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps, environ- ment and data to be collected. This covers the CPCI BMMGMT during the BOC phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM RFP WBS WBS NO. WBS NO. TITLE 643162 4.3.2.4 Prepare Test Reports 643163 4.3.2.5 CPCI Listings As-built 643167 4.3.2.1 Requirements Analysis and Allocation WBS DESCRIPTION This covers the CPCI BMMGMT during the BOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. This covers the CPCI BMMGMT during the BOC phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI (CDRL #150). This covers the CPCI BCCNTR during the BOC phase and includes the design effort which provides for analysis of Segment Design specification functions and their alloca- tions to individual CPCI's (and Cl's). This effort occurs after completion of the Design Concept Review and leads to the generation of the CPCI Part I specs. for PDR. 643168 4.3.2.1 Prepare (Prelim.) Design This covers the CPCI BCCNTR during the BOC Part I Specs. and Conduct phase and includes the preparation of the Internal Design Reviews CPCI preliminary Part I specification (CDRL #141) and participation in internal design reviews. This effort is performed by the System Engineering group and aug- mented by the SW Development group which supports requirements allocation and development of the Part I Specs. 643169 4.3.2.1 Prepare Data Dictionary This covers the CPCI BCCNTR during the BOC phase and includes the preparation of the Data Dictionary (CDRL #145). The Data Dictionary contains a description of every data item in D/C Segment file. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. 643170 RFP WBS NO. WBS TITLE Prepare (Prelim.) Part II Specs. Prepare CPCI Test Plan (Prelim.) - Appendix for BCCNTR Prepare Built-to Part II Specs. and Conduct Internal Design Review Prepare (Prelim.) Programmers Manual Prepare CPCI Test Plan (Final) - Appendix for BCCNTR WBS DESCRIPTION This covers the CPCI BCCNTR during the BOC phase and includes the preparation of the preliminary CPCI Part II specification (CDRL #142). This covers the CPCI BCCNTR during the BOC phase and includes the preparation of the preliminary CPCI Test Plan (CDR #131). This covers the CPCI BCCNTR during the BOC phase and includes the preparation of the CPCI Part II specification or the "built-to" specification (CDRL #142) and participation in internal design reviews. This covers the CPCI BCCNTR during the BOC phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). This covers the CPCI BCCNTR during the BOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). Integrate and Test to CPC Level This covers the CPCI BCCNTR during the BOC phase and includes the development of source code at the module level, its unit test and debug. This covers the CPCI BCCNTR during the BOC phase and includes the SW development activities to integrate and test modules up to CPC level. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. 643177 4.3.2.4 643178 4.3.2.4 643179 4.3.2.4 643180 4.3.2.4 643182 4.3.2.5 WBS WBS TITLE DESCRIPTION Test at the CPC and CPCI This covers the CPCI BCCNTR during the BOC Levels phase and includes the formal testing by the T&V group. This testing consist of PQT testing of CPC/Strings and FQT testing of complete CPCI's and its interface with other CPCI's. Develop SW Test Procedure This covers the CPCI BCCNTR during the BOC phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps, environ- ment and data to be collected. Support Test and This covers the CPCI BCCNTR during the BOC Verification phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. Prepare Test Reports This covers the CPCI BCCNTR during the BOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. CPCI Listings As-built This covers the CPCI BCCNTR during the BOC phase and includes the listing of source instruction, statements and object code for all CPC forming the CPCI (CDRL #150). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 V IBM RFP WBS NO. WBS NO. 643186 4.3.2.1 643187 4.3.2.1 643188 4.3.2.1 643189 4.3.2.1 643190 4.3.2.1 WBS WBS TITLE DESCRIPTION Requirements Analysis and This covers the CPCI BQUERY during the Allocation phase and includes the design effort which provides for analysis of Segment Design specification functions and their allocations to individual CPCI's (and CI's). This effort occurs after completition of the Design Concept Review and leads to the generation of the CPCI Part I specs. for PDR. Prepare (Prelim.) Design This covers the CPCI BQUERY during the BOC Part I Specs. and Conduct phase and includes the preparation of the Internal Design Reviews preliminary Part I specification (CDRL #141) and participation in internal design reviews. This effort is performed by the System Engineering group and augmented by the SW Development group which supports require- ments allocation and development of the Part I specs. Prepare Data Dictionary This covers the CPCI BQUERY during the BOC phase and includes the preparation of the Data Dictionary (CDRL #145). The Data Dictionary contains a description of every data item in D/C Segment file. Prepare (Prelim.) Part II This covers the CPCI BQUERY during the BOC Specs. phase and includes the preparation of the preliminary CPCI Part II specification (CDRL #142). Prepare CPCI Test Plan This covers the CPCI BQUERY during the BOC (Prelim.) - Appendix for phase and includes the preparation of the BQUERY preliminary CPCI Test Plan (CDR #131). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. 643191 4.3.2.2 643192 4.3.2.2 643193 4.3.2.3 643194 4.3.2.3 643195 4.3.2.4 643196 4.3.2.4 WBS WBS TITLE DESCRIPTION Prepare Built-to Part II This covers the CPCI BQUERY during the BOC Specs. and Conduct Internal phase and includes the preparation of the Design Review CPCI Part II specification or the "built- to" specification (CDRL #142) and participa- tion in internal design reviews. Prepare CPCI Test Plan This covers the CPCI BQUERY during the (Final) - Appendix for BOC phase and includes the preparation BQUERY of the final CPCI Test Plan (CDRL #131). Code and Unit Test This covers the CPCI BQUERY during the BOC phase and includes the development of source code at the module level, its unit test and debug. Integrate and Test to This covers the CPCI BQUERY during the BOC CPC Level phase and includes the SW development activities to integrate and test modules up to CPC level. Test at the CPC and This covers the CPCI BQUERY during the BOC CPCI Levels phase and includes the formal testing by the T&V group. This testing consist of PQT testing of CPC/Strings and FQT testing of complete CPCI's and its interface with other CPCI's. Develop SW Test Procedure This covers the CPCI BQUERY during the BOC phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps and environ- ment data to be collected. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 IBM WBS NO. RFP WBS NO. 643197 4.3.2.4 643198 4.3.2.4 643200 4.3.2.5 643203 4.3.2.5 643204 4.3.2.1 WBS WBS TITLE DESCRIPTION Support Test and Verification This covers the CPCI BQUERY during the BOC phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. Prepare Test Reports CPCI Listings As-built Prepare As-Built Part II Specs. This covers the CPCI BQUERY during the BOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. This covers the CPCI BQUERY during the BOC phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI (CDRL ##150). This covers the CPCI BQUERY during the BOC phase and includes the preparation of the "as-built" version of the CPCI Part II specs. (CDRL ##142). The "as-built" version defines the exact configuration of accepted computer programs. Requirements Analysis and This covers the CPCI BAPPLS during the BOC Allocation phase and includes the design effort which provides for analysis of Segment Design specification functions and their alloca- tions to individual CPCI's (and CI's). This effort occurs after completion of the Design Concept Review and leads to the gen- eration of the CPCI Part I specs. for PDR. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. 643205 4.3.2.1 643206 4.3.2.1 643207 4.3.2.1 643208 4.3.2.1 643209 4.3.2.2 643210 4.3.2.2 WBS TITLE Prepare (Prelim.) Design Part I Specs. and Conduct Internal Design Reviews WBS DESCRIPTION This covers the CPCI BAPPLS during the BOC phase and includes the preparation of the CPCI preliminary Part I specification (CDRL #141) and participation in internal design reviews. This effort is performed by the System Engineering group and aug- mented by the SW Development group which supports requirements allocation and develop- ment of the Part I specs. Prepare Data Dictionary This covers the CPCI BAPPLS during the BOC phase and includes the preparation of the Data Dictionary (CDRL #145). The Data Dictionary contains a description of every data item in D/C Segment file. Prepare (Prelim.) Part This covers the CPCI BAPPLS during the BOC II Specs. phase and includes the preparation of the preliminary CPCI Part II specification (CDRL # 142). Prepare CPCI Test Plan (Prelim.) This covers the CPCI BAPPLS during the BOC - Appendix for BAPPLS phase and includes the preparation of the preliminary CPCI Test Plan (CDR #131). Prepare Built-to Part II This covers the CPCI BAPPLS during the BOC Specs and Conduct Internal phase and includes the preparation of the Design Review CPCI Part II specification or the "build-to" specification (CDRL #142) and participa- tion in internal design reviews. Prepare (Prelim.) This covers the CPCI BAPPLS during the BOC Programmers Manual and includes the preparation of the pre- liminary Programmers Manual (CDRL #138). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 IBM WBS NO. RFP WBS NO. 643211 4.3.2.2 643212 4.3.2.3 643213 4.3.2.3 643214 4.3.2.4 643215 4.3.2.4 643216 4.3.2.4 WBS WBS TITLE DESCRIPTION Prepare CPCI Test Plan This covers the CPCI BAPPLS during the BOC (Final) - Appendix for phase and includes the preparation of the BAPPLS of the final CPCI Test Plan (CDRL #131). Code and Unit Test This covers the CPCI BAPPLS during the BOC phase and includes the development of source code at the module level, its unit test and debug. Integrate and Test to CPC This covers the CPCI BAPPLS during the BOC Level phase and includes the SW development activ- ities to integrate and test modules up to CPC level. Test at the CPC and CPCI This covers the CPCI BAPPLS during the BOC Levels phase and includes the formal testing by the T&V group. This testing consist of PQT testing of CPC/Strings and FQT testing of complete CPCI's and its interface with other CPCI's. Develop SW Test Procedures This covers the CPCI BAPPLS during the BOC phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps and environ- ment data to be collected. Support Test and This covers the CPCI BAPPLS during the BOC Verification phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: A-RDP84T00037R000300060001-2 is IBM WBS NO. RFP WBS NO. 643217 4.3.2.4 643219 4.3.2.5 643220 4.3.2.5 643221 4.3.2.5 643222 4.3.2.5 643223 4.3.2.1 WBS WBS TITLE DESCRIPTION Prepare Test Reports This covers the CPCI BAPPLS during the BOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. CPCI Listings as-built This covers the CPCI BAPPLS during the BOC phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI (CDRL #150). Prepare Programmers This covers the CPCI BAPPLS during the BOC Manual (Final) phase and includes the preparation of final version of the Programmers Manual (CDRL #138). Prepare Inputs to This covers the CPCI BAPPLS during the BOC Training Manuals phase and includes the preparation inputs to the various training manuals. Prepare As-Built Part This covers the CPCI BAPPLS during the BOC II Specs. phase and includes the preparation of the "as-built" version of the CPCI Part II specs. (CDRL #142). The "as-built" version defines the exact configuration of accepted computer programs. Requirements Analysis and This covers the CPCI BDMAPS during the BOC Allocation phase and includes the design effort which provides for analysis of Segment Design specification functions and their alloca- tions to individual CPCI's (and CI's). This effort occurs after completion of the Design Concept Review and leads to the generation of the CPCI Part I specs, for PDR. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w IBM WBS NO. RFP WBS NO. WBS TITLE Prepare (Prelim.) Design Part I Specs. and Conduct Internal Design Reviews Prepare Data Dictionary Prepare (Prelim.) Part II Specs. Prepare CPCI Test Plan (Prelim.) - Appendix for BDMAPS Prepare Built-to Part II Specs. and Conduct Internal Design Review ? WBS DESCRIPTION This covers the CPCI BDMAPS during the BOC phase and includes the preparation of the CPCI (CDRL #141) and participation in internal design reviews. This effort is performed by the System Engineering group and aug- mented by the SW Development group, which supports requirement's allocation and development of the Part I specs. This covers the CPCI BDMAPS during the BOC phase and includes the preparation of the Data Dictionary (CDRL #145). The Data Dictionary contains a description of every data item in D/C Segment file. This covers the CPCI BDMAPS during the BOC phase and includes the preparation of the preliminary CPCI Part II specification (CDRL #142). This covers the CPCI BDMAPS during the BOC phase and includes the preparation of the preliminary CPCI Test Plan (CDR #131). This covers the CPCI BDMAPS during the BOC phase and includes the preparation of the CPCI Part II specification or the "build- to" specification (CDRL #142) and partici- pation in internal design reviews. 643229 4.3.2.2 Prepare (Prelim.) This covers the CPCI BDMAPS during the BOC Programmers Manual phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 IBM WBS NO. RFP WBS NO. 643230 4.3.2.2 643231 4.3.2.3 643232 4.3.2.3 643233 4.3.2.4 643234 4.3.2.4 643235 4.3.2.4 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w WBS TITLE WBS DESCRIPTION ? Prepare CPCI Test Plan This covers the CPCI BDMAPS during the BOC (Final) - Appendix for phase and includes the preparation of the BDMAPS final CPCI Test Plan (CDRL #131). Code and Unit Test This covers the CPCI BDMAPS during the BOC phase and includes the development of source code at the module level, its unit test and debug. Integrate and Test This covers the CPCI BDMAPS during the BOC to CPC Level phase and includes the SW development activities to integrate and test modules up to CPC level. Test at the CPC and This covers the CPCI BDMAPS during the BOC CPCI Levels phase and includes the formal testing by the T&V group. This testing consist of PQT testing of CPC/Strings and FQT testing of complete CPCI's and its interface with other CPCI's. Develop SW Test This covers the CPCI BDMAPS during the BOC Procedures phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps, environ- ment and data to be collected. Verification phase and includes the activities of the SW Development group to support all formal tests by the TO group up to acceptance. Also includes all problem analysis and error correction. Support Test and This covers the CPCI BDMAPS during the BOC Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w IBM WBS NO. RFP WBS NO. 643236 4.3.2.4 643238 4.3.2.5 643241 4.3.2.5 643242 4.3.2.1 WBS TITLE Prepare Test Reports CPCI Listings As-built Prepare As-Built Part II Specs. is WBS DESCRIPTION This covers the CPCI BDMAPS during the BOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. This covers the CPCI BDMAPS during the BOC phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI (CDRL #150). This covers the CPCI BDMAPS during the BOC phase and includes the preparation of the "as-built" version of the CPCI Part II specs. (CDRL #142). The "as-built" version defines the exact configuration of accepted computer programs. Requirements Analysis This covers the CPCI BTTDEV during the BOC and Allocation phase and includes the design effort which provides for analysis of Segment Design specification functions and their alloca- tions to individual CPCI's (and CI's). This effort occurs after completion of the Design Concept Review and leads to the gen- eration of the CPCI Part I specs. for PDR. 643243 4.3.2.1 Prepare (Prelim.) Design This covers the CPCI BTTDEV during the BOC Part I Specs. and Conduct phase and includes the preparation of the Internal Design Reviews CPCI preliminary Part I specification (CDRL #141) and participation in internal design reviews. This effort is performed by the System Engineering group and augmented by the SW Development group which supports requirements allocation and development of the Part I specs. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 IBM WBS NO. 643244 RFP WBS NO. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w WBS TITLE Prepare Data Dictionary Prepare (Prelim.) Part II Specs. Prepare CPCI Test Plan (Prelim.) - Appendix for BTTDEV Prepare Built-to Part II Specs. and Conduct Internal Design Review Prepare (Prelim.) Programmers Manual Prepare CPCI Test Plan (Final) - Appendix for BTTDEV ? WBS DESCRIPTION This covers the CPCI BTTDEV during the BOC phase and includes the preparation of the Data Dictionary (CDRL #145). The Data Dictionary contains a description of every data item in D/C Segment file. This covers the CPCI BTTDEV during the BOC phase and includes the preparation of the preliminary CPCI Part II specification (CDRL#142). This covers the CPCI BTTDEV during the BOC phase and includes the preparation of the preliminary CPCI Test Plan (CDR #131). This covers the CPCI BTTDEV during the BOC phase and includes the preparation of the CPCI Part II specification or the "build- to" specification (CDRL #142) and partici- pation in internal design reviews. This covers the CPCI BTTDEV during the BOC phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). This covers the CPCI BTTDEV during BOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). This covers the CPCI BTTDEV during the BOC phase and includes the development of source code at the module level, its unit test and debug. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/0 5: CIA -RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. 643251 4.3.2.3 643252 4.3.2.4 643253 4.3.2.4 643254 4.3.2.4 643255 4.3.2.4 643256 4.3.2.5 WBS WBS TITLE DESCRIPTION Integrate and Test This covers the CPCI BTTDEV during the BOC to CPC Level phase and includes the SW development activi- ties to integrate and test modules up to CPC level. Test at the CPC and This covers the CPCI BTTDEV during the BOC CPCI Levels phase and includes the formal testing by the T&V group. This testing consist of PQT testing of CPC/Strings and FQT testing of complete CPCI's and its interface with other CPCI's. Develop SW Test This covers the CPCI BTTDEV during the BOC Procedures phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps and environ- ment data to be collected. Support Test and This covers the CPCI BTTDEV during the BOC Verification phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. Prepare Test Reports This covers the CPCI BTTDEV during the BOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. Prepare Inputs to User, This covers the CPCI BTTDEV during the BOC Operator and Data Base phase and includes the preparation of in- Administration Manuals puts to Users Manual (CDRL #135), Operators Manual (CDRL #136), and Data Base Admini- strators Manual (CDRL #137). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. 643257 4.3.2.5 643258 4.3.2.5 643259 4.3.2.5 643260 4.3.2.5 643261 4.3.2.1 WBS WBS TITLE DESCRIPTION CPCI Listings As-built This covers the CPCI BTTDEV during the BOC phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI (CDRL #150). Prepare Programmers This covers the CPCI BTTDEV during the BOC Manual (Final) phase and includes the preparation of final version of the Programmers Manual (CDRL #138). Prepare Inputs to This covers the CPCI BTTDEV during the BOC Training Manuals phase and includes the preparation inputs to the various training manuals. Prepare As-Built Part This covers the CPCI BTTDEV during the BOC II Specs. phase and includes the preparation of the "as-built" version of the CPCI Part II specs. (CDRL #142). The "as-built" ver- sion defines the exact configuration of accepted computer programs. Requirements Analysis This covers the CPCI WAPPLS during the BOC and Allocation phase and includes the design effort which provides for analysis of Segment Design spec- ification functions and their allocations to individual CPCI's (and Cl's). This effort occurs after completion of the Design Con- cept Review and leads to the generation of the CPCI Part I specs. for PDR. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/0 IA-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. WBS TITLE Prepare (Prelim.) Design Part I Specs. and Conduct Internal Design Reviews Prepare Data Dictionary Prepare (Prelim.) Part II Specs. Prepare CPCI Test Plan (Prelim.) - Appendix for WAPPLS Prepare Built-to Part II Specs. and Conduct Internal Design Review WBS DESCRIPTION This covers the CPCI WAPPLS during the BOC phase and includes the preparation of the CPCI preliminary Part I specification (CDRL #141) and participation in internal design reviews. This effort is performed by the System Engineering group and aug- mented by the SW Development group which supports requirements allocation and develop- ment of the Part I specs. This covers the CPCI WAPPLS during the BOC phase and includes the preparation of the Data Dictionary (CDRL # 145). The Data Dictionary contains a description of every data item in D/C Segment file. This covers the CPCI WAPPLS during the BOC phase and includes the preparation of the preliminary CPCI Part II specification (CDRL #142). This covers the CPCI WAPPLS during the BOC phase and includes the preparation of the preliminary CPCI Test Plan (CDR #131). This covers the CPCI WAPPLS during the BOC phase and includes the preparation of the CPCI Part II specification or the "build- to" specification (CDRL #142) and partici- pation in internal design reviews. 643267 4.3.2.2 Prepare (Prelim.) This covers the CPCI WAPPLS during the BOC Programmers Manual phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? V IBM WBS NO. RFP WBS NO. 643268 4.3.2.2 643269 4.3.2.3 643270 4.3.2.3 643271 4.3.2.4 643272 4.3.2.4 643273 4.3.2.4 WBS WBS TITLE DESCRIPTION Prepare CPCI Test Plan This covers the CPCI WAPPLS during the BOC (Final) - Appendix for phase and includes the preparation of the WAPPLS final CPCI Test Plan (CDRL #131). Code and Unit Test This covers the CPCI WAPPLS during the BOC phase and includes the development of source code at the module level, its unit test and debug. Integrate and Test to This covers the CPCI WAPPLS during the BOC CPC Level phase and includes the SW development activi- ties to integrate and test modules up to CPC level. Test at the CPC and This covers the CPCI WAPPLS during the BOC CPCI Levels phase and includes the formal testing by the T&V group. This testing consists of PQT testing of CPC/Strings and FQT testing of complete CPCI's and its interface with other CPCI's. Develop SW Test This covers the CPCI WAPPLS during the BOC Procedures phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps, environ- ment and data to be collected. Support Test and This covers the CPCI WAPPLS during the Verification BOC phase and includes the activities of of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 is V IBM WBS NO. RFP WBS NO. WBS TITLE Prepare Test Reports Prepare Inputs to User, Operator and Data Base Administration Manuals CPCI Listings As-built Prepare Programmers Manual (Final) WBS DESCRIPTION This covers the CPCI WAPPLS during the BOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. This covers the CPCI WAPPLS during the BOC phase and includes the preparation of inputs to Users Manual (CDRL #135), Operator Manual (CDRL #136), and Data Base Adminstrators Manual (CDRL #137). This covers the CPCI WAPPLS during the BOC phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI (CDRL #150). This covers the CPCI WAPPLS during the BOC phase and includes the preparation of final version of the Programmers Manual (CDRL #138). Prepare Inputs to Training Manuals Prepare As-Built Part II Specs. This covers the CPCI WAPPLS during the BOC phase and includes the preparation on inputs to the various training manuals. This covers the CPCI WAPPLS during th BOC phase and includes the preparation of the "as-built" version of the CPCI Part II specs. (CDRL #142). The "as-built" version defines the exact configuration of accepted computer programs. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/0 IA-RDP84T00037R000300060001-2 ? IBM RFP WBS WBS NO. WBS NO. TITLE 643280 4.3.2.1 Requirements Analysis and Allocation 643281 4.3.2.1 Prepare (Prelim.) Design Part I Specs. and Conduct Internal Design Reviews 643282 4.3.2.1 Prepare Data Dictionary 643284 4.3.2.1 Prepare (Prelim.) Part II Specs. 643285 4.3.2.1 Prepare CPCI Test Plan (Prelim)-Appendix for BEXSUP provides for analysis of Segment Design specification functions and their allocations to individual CPCI's (and CI's). This effort occurs after completion of the Design Concept Review and leader to the generation of the CPCI Part I spec. for PDR. WBS DESCRIPTION This covers the CPCI BEXSUP during the BOC phase and includes the design effort which This covers the CPCI BEXSUP during the BOC phase and includes the preparation of the CPCI preliminary Part I specification (CDRL #141) and participation in internal design reviews. This effort is performed by the System Engineering group and aug- umented by the SW Development group which supports requirements allocation and development of the Part I Specs. This covers the CPCI BEXSUP during the BOC phase and includes the preparation of the Data Dictionary (CDRL #145). The Data Dictionary contains a description of every data item in D/C Segment file. This covers the CPCI BEXSUP during the BOC phase and includes the preparation of the preliminary CPCI Part II specification (CDRL #142). This covers the CPCI BEXSUP during the BOC phase and includes the preparation of the preliminary CPCI Test Plan (CDR #131). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. WBS TITLE Prepare Built-to Part II Specs. and Conduct Internal Design Review Prepare (Prelim.) Programmers Manual Prepare CPCI Test Plan (Final) - Appendix for BEXSUP Integrate and Test to CPC level WBS DESCRIPTION This covers the CPCI BEXSUP during the BOC phase and includes the preparation of the CPCI Part II specification or the "built-to" specification (CDRL #142) and participation in internal design reviews. This covers the CPCI BEXSUP during the BOC phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). This covers the CPCI BEXSUP during the BOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). This covers the CPCI BEXSUP during the BOC phase and includes the development of source code at the module level, its unit test and debug. This covers the CPCI BEXSUP during the BOC phase and includes the SW development activities to integrate and test modules up to CPC level. Test at the CPC and CPCI Levels Develop SW Test Procedures This covers the CPCI BEXSUP during the BOC phase and includes the formal testing by the T&V group. This testing consists of PQT testing CPC/Strings and FQT testing of complete CPCI's and its interface with other CPCI's. This covers the CPCI BEXSUP during the BOC phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps, environ- ment, and data to be collected. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/0 5: C IA-RDP84T00037R000300060001-2 IBM WBS NO. RFP WBS NO. 643293 4.3.2.4 643294 4.3.2.4 643295 4.3.2.5 643296 4.3.2.5 643298 4.3.2.5 643299 4.3.2.5 WBS WBS TITLE DESCRIPTION Support Test and This covers the CPCI BEXSUP during the BOC Verification phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. Prepare Test Reports This covers the CPCI BEXSUP during the BOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. Prepare Inputs to This covers the CPCI BEXSUP during the BOC User, Operator and phase and includes the preparation of inputs Data Base Administration to Users Manual (CDRL #135), Operators Manual Manuals (CDRL #136), and Data Base Administrators Manual (CDRL #137). CPCI Listings This covers the CPCI BEXSUP during the BOC As-built phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI (CDRL #150). Prepare Programmers This covers the CPCI BEXSUP during the BOC Manual (Final) phase and includes the preparation of final version of the Programmers Manual (CDRL #138). Prepare Inputs to This covers the CPCI BEXSUP during the BOC Training Manuals phase and includes the preparation inputs to the various training manuals. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w IBM RFP WBS WBS NO. WBS NO. TITLE 643300 4.3.2.5 Prepare As-Built Part II Specs. 244000 4.4 Software Development (IOC) 644001 4.4.1 Manage all SW Development Activities ? WBS DESCRIPTION This covers the CPCI BEXSUP during the IOC phase and includes the preparation of the "as-built" version of the CPCI Part II specs. (CDRL #142). The "as-built" version defines the exact configuration of accepted computer programs. This covers the software development effort during the IOC phase and includes the following functions: management, preliminary design, critical design, development, test, and documentation. phase. This covers the efforts of second and third level management functions required to manage the SW development tasks in the IOC Covers the effort required to ensure SW architectural integrity during the IOC phase. 6440006 4.4.1 Technical Support to Covers the Software development effort Subcontract Management required to support Subcontract Management to ensure technical oversight during the IOC phase. unmodified code from the UNIVAC processor. Covers the Purchase of COBOL code conversion services during the IOC phase, to convert 644008 4.4.1 Library Control Covers the performance of routine source library maintenance/control activities during the IOC phase. STAT Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: C A-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. 644009 4.4.1 644010 4.4.1 644012 4.4.1 644013 4.4.1 644014 4.4.1 644015 4.4.2.2 WBS WBS TITLE DESCRIPTION SW Builds and Releases Perform software builder and maintain software version control/documentation. Maintain hard copy control. This element cover the IOC phase. Provide Inputs to Segment Prepare and maintains the software section Development Plan of the Segment Development Plan during the IOC phase. Data Base Conversion Covers the conversion of the data base need Design, Implementation, for BOC from DMS 1100 base to M204 base. Verification Included are planning, design, conversion utility creation, file conversion, and verification. This element covers the IOC phase. Data Base Package This covers the preparation of the Data Base Package (CDRL #151) which defines the actual entries to be used for initializing each data base item. This element covers the IOC phase. Data Base Support to This effort includes the Data Base Development and Test Adminstration function and production of and Verification the final version of the Data Base Admin- stration Manual (CDRL #137) during the IOC phase. Prepare Built-to This covers the CPCI BEPPRE during the IOC Part II Specs. and phase and includes the preparation of the Conduct Internal CPCI Part II specification or the "build-to" Design Review specification (CDRL #142) and participation in internal design reviews. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w RFP WBS NO. WBS TITLE WBS DESCRIPTION Prepare (Prelim.) Programmers Manual Prepare CPCI Test Plan (Final) - Appendix for BEPPRE Integrate and Test to CPC level Test at the CPC and CPCI Levels Develop SW Test Procedures This covers the CPCI BEPPRE during the IOC phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). This covers the CPCI BEPPRE during the IOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). This covers the CPCI BEPPRE during the IOC phase and includes the development of source code at the module level, its unit test and debug. This covers the CPCI BEPPRE during the IOC phase and includes the SW development activities to integrate and test modules up to CPC level. This covers the CPCI BEPPRE during the IOC phase and includes the formal testing by the T&V group. This testing consist of PQT testing of CPC/Strings and FQT testing of complete CPCI's and its interface with other CPCI. This covers the CPCI BEPPRE during the IOC phase and include procedures describing test cases and acceptance criteria. Also in- cludes detailed testing setups and environ- ment data to be collected. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/0 5: Cl A-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. 644022 4.4.2.4 644023 4.4.2.4 644025 4.4.2.5 644026 4.4.2.5 644028 4.4.2.5 644029 4.4.2.2 WBS WBS TITLE DESCRIPTION Support Test and This covers the CPCI BEPPRE during the IOC Verification phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. Prepare Test Reports This covers the CPCI BEPPRE during the IOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. CPCI Listings As-built This covers the CPCI BEPPRE during the IOC phase and includes the-listing of source instruction statements and object code for all CPC forming the CPCI (CDRL #150). Prepare Programmers This covers the CPCI BEPPRE during the IOC Manual (Final) phase includes the preparation of final version of the Programmers Manual (CDRL #138). Prepare As-Built Part This covers the CPCI BEPPRE during the IOC II Specs. phase and includes the preparation of the "as-built" version of the CPCI Part II specs. (CDRL #142). The "as-built" version defines the exact configuration of accepted computer programs. Prepare Built-to Part This covers the CPCI BEMGMT during the IOC II Specs. and Conduct phase and includes the preparation of the Internal Design Review CPCI Part II specification or the "built-to" specification (CDRL #142) and participation in internal design reviews. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w IBM WBS NO. RFP WBS NO. WBS TITLE Prepare (Prelim.) Programmers Manual Prepare CPCI Test Plan (Final) - Appendix for BEMGMT Integrate and Test to CPC Level WBS DESCRIPTION This covers the CPCI BEMGMT during the IOC phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). This covers the CPCI BEMGMT during the IOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). This covers the CPCI BEMGMT during the IOC phase and includes the development of source code at the module level, its unit test and debug. This covers the CPCI BEMGMT during the IOC phase and includes the SW development activities to integrate and test modules up to CPC level.. Test at the CPC and CPCI Levels Develop SW Test Procedures This covers the CPCI BEMGMT during the IOC phase and includes the formal testing by the T&V group. This testing consists of PQT testing of CPC/Strings and FQT testing of complete CPCI's and its interface with other CPCI's. This covers the CPCI BEMGMT during the IOC phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps and environment data to be collected. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 IBM WBS NO. 644036 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w RFP WBS NO. WBS TITLE WBS DESCRIPTION Support Test and Verification Prepare Test Reports CPCI Listings As-built Prepare Programmers Manual (Final) Prepare Inputs to Training Manuals Prepare As-Built Part II Specs. This covers the CPCI BEMGMT during the IOC phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. This covers the CPCI BEMGMT during the IOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. This covers the CPCI BEMGMT during the IOC phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI (CDRL #150). This covers the CPCI BEMGMT during the IOC phase and includes the preparation of final version of the Programmers Manual (CDRL #138). This covers the CPCI BEMGMT during the IOC phase and includes the preparation inputs to the various training manuals. This covers the CPCI BEMGMT during the IOC phase and includes the preparation of the "as-built" version of the CPCI Part II specs. (CDRL #142). The "as-built" version defines the exact configuration of accepted computer programs. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 I- ? Approved For Release 2007/07/0 A-RDP84T00037R000300060001-2 5: Cl IBM WBS NO. RFP WBS NO. WBS TITLE Prepare Built-to Part II Specs. and Conduct Internal Design Review Prepare (Prelim.) Programmers Manual Prepare CPCI Test Plan (Final) - Appendix for BERESU Integrate and Test to CPC Level Test at the CPC and CPCI Levels WBS DESCRIPTION This covers the CPCI BERESU during the IOC phase and includes the preparation of the CPCI Part II specification or the "build-to" specification (CDRL #142) and participation in internal design reviews. This covers the CPCI BERESU during the IOC phase and includes the preparation of the preliminary programmers Manual (CDRL #138). This covers the CPCI BERESU during the IOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). This covers the CPCI BERESU during the IOC phase and includes the development of source code at the module level, its unit test and debug. This covers the CPCI BERESU during the IOC phase and includes the SW development activities to integrate and test modules up to CPC level. This covers the CPCI BERESU during the IOC phase and includes the formal testing by the T&V group. This testing consist of PQT testing of CPC/Strings and FQT testing of complete CPCI's and its interface with other CPCI's. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05 CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE Develop SW Test Procedures Support Test and Verification Prepare Test Reports Prepare Build-to Part II specs. and Conduct Internal Design Review WBS DESCRIPTION This covers the CPCI BERESU during the IOC phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps and environment data to be collected. This covers the CPCI BERESU during the IOC phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. This covers the CPCI BERESU during the IOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. This covers the CPCI BMANIP during the IOC phase and includes the preparation of the CPCI Part II specification or the "build-to" specification (CDRL #142) and participation in internal design reviews. Prepare (Prelim.) Programmers Manual This covers the CPCI BMANIP during the IOC phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). Prepare CPCI Test Plan (Final) - Appendix for BMANIP This covers the CPCI BMANIP during the IOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05 CIA-RDP84T00037R000300060001-2 ? w IBM RFP WBS NO. WBS NO. 644060 4.4.2.3 644061 4.4.2.3 644062 4.4.2.4 644063 4.4.2.4 644064 4.4.2.4 644065 4.4.2.4 WBS WBS TITLE DESCRIPTION Code and Unit Test This covers the CPCI BMANIP during the IOC phase and includes the development of source code at the module level, its unit test and debug. Integrate and Test This covers the CPCI BMANIP during the IOC to CPC level phase and includes the SW development activities to integrate and test module up to CPC level. Test at the CPC This covers the CPCI BMANIP during the IOC and CPCI Levels phase and includes the formal testing by the T&V group. The testing consists of PQT testing of CPC/Strings and FQT testing of complete CPCI's and its interface with other CPCI's. Develop SW Test This covers the CPCI BMANIP during the IOC Procedures phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps and environment data to be collected. Support Test and This covers the CPCI BMANIP during the IOC Verification phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error and correction. Prepare Test Reports This covers the CPCI BMANIP during the IOC phase and includes activities by the TO group to prepare formal test reports on results of PQT/FQT testing. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 0 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE CPCI Listings As-built - Prepare Programmers Manual (Final) Prepare As-Built Part II Specs. Prepare Built-to Part II Specs. and Conduct Internal Design Review Prepare (Prelim.) Programmers Manual WBS DESCRIPTION This covers the CPCI BMANIP during the IOC phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI (CDRL #150). This covers the CPCI BMANIP during the IOC phase and includes the preparation of final version of the Programmers Manual (CDRL #138) This covers the CPCI BMANIP during the IOC phase and includes the presentation of the "as-built" version of the CPCI Part II specs. (CDRL #142). The "as-built" version defines the exact configuration of accepted computer programs. This covers the CPCI BSTATR during the IOC phase and includes the preparation of the CPCI Part II specification or the "build-to" specification (CDRL #142) and participation in internal design reviews. This covers the CPCI BSTATR during the IOC phases and includes the preparation of the preliminary Programmers Manual (CDRL #138). Prepare CPCI Test Plan (Final) - Appendix for BSTATR This covers the CPCI BSTATR during the IOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). This covers the CPCI BSTATR during the IOC phase and includes the development of source code at the module level, its unit test and debug. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? V IBM WBS NO. RFP WBS NO. 644075 4.4.2.3 644076 4.4.2.4 644077 4.4.2.4 644078 4.4.2.4 644079 4.4.2.4 644082 4.4.2.5 WBS WBS TITLE DESCRIPTION Integrate and Test to This covers the CPCI BSTATR during the IOC CPC Level phase and includes the SW development activities to integrate and test module up to CPC level. Test at the CPC and This covers the CPCI BSTATR during the IOC CPCI Levels phase and includes the formal testing by the T&V group. This testing consist of PQT testing of CPC/Strings and FQT testing of complete CPCI's and its interface with other CPCI's. Develop SW Test This covers the CPCI BSTATR during the IOC Procedures phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing setups and environment data to be collected. Support Test and This covers the CPCI BSTATR during the IOC Verification phase and includes the activities of the the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. Prepare Test Reports This covers the CPI BSTATR during the IOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. CPCI Listings As-built This covers the CPCI BSTATR during the IOC phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI (CDRL #150). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE Prepare Programmers Manual (Final) Prepare As-Built Part II Specs. Prepare Build-to Part II Specs, and Conduct Internal Design Review Prepare (Prelim.) Programmers Manual Prepare CPCI Test Plan (Final) - Appendix for BMMGMT WBS DESCRIPTION This covers the CPCI BSTATR during the IOC phase and includes the preparation of final version of the Programmers Manual (CDRL #138). This covers the CPCI BSTATR during the IOC phase and includes the preparation of the "as-built" version of the CPCI Part II specs. (CDRL ##142). The "as-built" version defines the exact configuration of accepted computer programs. This covers the CPCI BMMGMT during the IOC phase and includes the preparation of the CPCI Part II specification or the "built-to" specification (CDRL #142) and participation in internal design reviews. This covers the CPCI BMMGMT during the IOC phase and includes the preparation of the preliminary Programmers Manual (CDRL #138) This covers the CPCI BMMGMT during the IOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). Integrate and Test to CPC Level This covers the CPCI BMMGMT during the IOC phase and includes the development of source code at the module level, its unit test and debug. This covers the CPCI BMMGMT during the IOC phase and includes the SW development activities to integrate and test modules up to CPC level. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w IBM WBS NO. RFP WBS NO. 644105 4.4.2.4 644106 4.4.2.4 644107 4.4.2.4 644108 4.4.2.4 644110 4.4.2.5 644114 4.4.2.2 WBS WBS TITLE DESCRIPTION Test at the CPC and This covers the CPCI BMMGMT during the IOC CPCI Levels phase and includes the formal testing by the T&V group. This testing consists of PQT testing of CPC/Strings and FQT testing of complete CPCI's and its interface with other CPCI's. Develop SW Test This covers the CPCI BMMGMT during the IOC Procedures phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps and environment data to be collected. Support Test and This covers the CPCI BMMGMT during the IOC Verification phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. Prepare Test Reports This covers the CPCI BMMGMT during the IOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. CPCI Listings As-built This cover the CPCI BMMGMT during the IOC phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI (CDRL #150). Prepare Build-to This covers the CPCI BCCNTR during the IOC Part II Specs. and phases and includes the preparation of the Conduct Internal Design CPCI Part II specification or the "build-to" Reviews specification (CDRL #142) and participation in internal design reviews. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE Prepare (Prelim.) Programmers Manual Prepare CPCI Test Plan (Final) - Appendix for BCCNTR Integrate and Test to CPC Level WBS DESCRIPTION This covers the CPCI BCCNTR during the IOC phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). This covers the CPCI BCCNTR during the IOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). This covers the CPCI BCCNTR during the IOC phase and includes the development of source code at the module level, its unit test and debug. This covers the CPCI BCCNTR during the IOC phase and includes the SW development activities to integrate and test modules up to CPC level. Test at the CPC and CPCI Levels Develop SW Test Procedures This covers the CPCI BCCNTR during the IOC phase and includes the formal testing by the T&V group. This testing consists of PQT testing of CPC/Strings and FQT testing of complete CPCI's and its interface with other CPCI's. This covers the CPCI BCCNTR during the IOC phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps and environment data to be collected. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. 644121 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w RFP WBS WBS WBS NO. TITLE DESCRIPTION 4.4.2.4 Support Test and This covers the CPCI BCCNTR during the IOC Verification phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. 644122 4.4.2.4 Prepare Test Reports This covers the CPCI BCCNTR during-the IOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. 644123 4.4.2.5 Prepare Inputs to User, This covers the CPCI BCCNTR during the IOC Operator, and Data Base phase and includes the preparation of inputs Administration Manuals to Users Manual (CDRL #135), Operators Manual (CDRL #136), and Data Base Administrators Manual (CDRL #137). 644124 4.4.2.5 CPCI Listings As-built This covers the CPCI BCCNTR during the IOC phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI (CDRL #150). 644126 4.4.2.5 Prepare Inputs to This covers the CPCI BCCNTR during the IOC Training Manuals phase and includes the preparation inputs to the various training manuals. 644127 4.4.2.5 Prepare As-Built Part This covers the CPCI BCCNTR during the IOC II Specs. phase and includes the preparation of the "as-built" version of the CPCI Part II specs. (CDRL #142). The "as-built" version defines the exact configuration of accepted computer programs. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE Prepare Build-to Part II Specs. and Conduct Internal Design Review Prepare (Prelim.) Programmers Manual Prepare CPCI Test Plan (Final) - Appendix for BQEURY Integrate and Test to CPC Level WBS DESCRIPTION This covers the CPCI BQUERY during the IOC phase and includes the preparation of the CPCI Part II specification or the "build-to" specification (CDRL #142) and participation in internal design reviews. This covers the CPCI BQEURY during the IOC phases and includes the preparation of the preliminary programmers Manual (CDRL #138). This-covers the CPCI BQUERY during the IOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). This covers the CPCI BQEURY during the IOC phase and. includes the development of source code at the module level, its unit test and debug. This covers the CPCI BQUERY during, the IOC phase and includes the SW development activities to integrate and test modules up to CPC level. Test at the CPC and CPCI Levels Develop SW Test Procedures This covers the CPCI BQUERY during the IOC phase and includes the formal testing by the T&V group. This testing consists of PQT testing of CPC/Strings and FQT testing of complete CPCI's and its interface with other CPCI's. This covers the CPCI BQEURY during the IOC phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps and environment data to be collected. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 0 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. 644135 4.4.2.4 644136 4.4.2.4 644137 4.4.2.5 644138 4.4.2.5 644139 4.4.2.5 644140 4.4.2.5 WBS WBS TITLE DESCRIPTION Support Test and This covers the CPCI BQEURY during the IOC Verification phase and includes the activitives of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. Prepare Test Reports This covers the CPCI BQUERY during the IOC phase and include's activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. Prepare Inputs to User, This covers the CPCI BQUERY during the IOC Operato,r and Data Base phase and includes the preparation of inputs Administration Manuals to Users Manual (CDRL #135), Operators Manual (CDRL #136), and Data Base Administrators Manual (CDRL #137). CPCI Listings This covers the CPCI BQUERY during the IOC As-built phase and includes the listing of source instuction statements and object code for all CPC forming the CPCI (CDRL #150). Prepare Programmers This covers the CPCI BQUERY during the IOC Manual (Final) phase and includes the preparation of final version of the Programmers Manual (CDRL #138). Prepare Inputs to This covers the CPCI BQUERY during the IOC Training Manuals phase and includes preparation inputs to the various training manuals. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 is V IBM WBS NO. RFP WBS NO. WBS TITLE Prepare As-Built Part II Specs. Prepare Build-to Part II Specs. and Conduct Internal Design Review Prepare (Prelim.) Programmers Manual Prepare CPCI Test Plan (Final) - Appendix for BAPPLS WBS DESCRIPTION This covers the CPCI BQUERY during the IOC phase and includes the preparation of the "as-built" version of the CPCI Part II specs. (CDRL #142). The "as-built" version defines the exact configuration of accepted computer programs. This covers the CPCI BAPPLS during the IOC phase and includes the preparation of the CPCI Part II specification or the "build-to" specification (CDRL #142) and participation in internal design reviews. This covers the CPCI BAPPLS during the IOC phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). This covers the CPCI BAPPLS during the IOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). Integrate and Test to CPC Level This covers the CPCI BAPPLS during the IOC phase and includes the development of source code at the module level, its unit test and debug. This covers the CPCI BAPPLS during the IOC phase and includes the SW development activities to integrate and test modules up to CPC level. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 IBM WBS NO. RFP WBS NO. 644147 4.4.2.4 644148 4.4.2.4 644149 4.4.2.4 644150 4.4.2.4 644152 4.4.2.5 644153 4.4.2.5 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w WBS TITLE WBS DESCRIPTION ? Test at the CPC and This covers the CPCI BAPPLS during the IOC CPCI Levels phase and includes the formal testing by the T&V group. This testing consists of PQT testing of CPC/Strings and FQT testing of complete CPCI's and its interface with other CPCI's. Develop SW Test This covers the CPCI BAPPLS during the IOC Procedures phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps and environment data to be collected. Support Test and This covers the CPCI BAPPLS during the IOC Manual (Final) phase and includes the preparation of final version of the Programmers Manual (CDRL #138). phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. Prepare Test Reports This covers the CPCI BAPPLS during the IOC phase and includes activities by the TO group to prepare formal test reports on results of PQT/FQT testing. CPCI Listings As-built This covers the CPCI BAPPLS during the IOC phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI (CDRL #150) Prepare Programmers This covers the CPCI BAPPLS during the IOC Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05 CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE Prepare Inputs to Training Manuals Prepare As-Built Part II Specs. Prepare Build-to Part II Specs. and Conduct Internal Reviews Prepare (Prelim.) Programmers Manual Prepare CPCI Test Plan (Final) - Appendix for BDMAPS WBS DESCRIPTION This covers the CPCI BAPPLS during the'IOC phase and includes the preparation inputs to various training manuals. This covers the CPCI BAPPLS during the IOC phase and includes the preparation of the the "as-built" version of the CPCI Part II specs. (CDRL #142). The "as-built" version defines the exact configuration of accepted computer programs. This covers the CPCI BDMAPS during the IOC phase and includes the preparation of the CPCI Part II specification or the "built-to" specification (CDRL #142) and participation in internal design reviews. This covers the CPCI BDMAPS during the IOC phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). This covers the CPCI BDMAPS during the IOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). Integrate and Test to CPC Level This covers the CPCI BDMAPS during the IOC phase and includes the development of source code at the module level, its unit test and debug. This covers the CPCI BDMAPS during the IOC phase and includes the SW development activities to integrate and test modules. up to CPC level. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM RFP WBS NO. WBS NO. 644161 4.4.2.4 644162 4.4.2.4 644163 4.4.2.4 644164 4.4.2.4 644166 4.4.2.5 644167 4.4.2.5 WBS WBS TITLE DESCRIPTION Test at the CPC and This covers the CPCI BDMAPS duirng the IOC CPCI Levels phase and includes the formal testing by the T&V group. This testing consist of PQT testing of CPC/Ships and FQT testing of complete CPCI's and its interface with other CPCI's. Develop SW Test This covers the CPCI BDMAPS duringthe IOC Procedure phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps and environment data to be collected. Support Test and This covers the CPCI BDMAPS duirng the IOC Verification phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. Prepare Test Reports This covers the CPCI BDMAPS durin gthe IOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. CPCI Listings As-built This covers the CPCI BDMAPS during the IOC phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI (CDRL #150) Prepare Programmers This covers the CPCI BDMAPS during the IOC Manual (Final) phase and includes the preparation of final version of the Programmers Manual (CDRL #138). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w IBM WBS NO. RFP WBS NO. WBS TITLE Prepare Inputs to Training Manuals Prepare As-Built Part II Specs. Prepare Build-to Part II Specs. and Conduct Internal Reviews Prepare (Prelim) Programmers Manual Prepare CPCI Test Plan (Final) - Appendix for BTTDEV WBS DESCRIPTION This covers the CPCI BDMAPS during the IOC phase and includes the preparation inputs to various training manuals. This covers the CPCI BAPPLS during the IOC phase and includes the preparation of the the "as-built" version of the CPCI Part II specs (CDRL #142). The "as-built" version defines the exact configuration of accepted computer programs. This covers the CPCI BTTDEV during the IOC phase and includes the preparation of the CPCI Part II Specification or the "built-to" specification (CDRL #142) and participation in internal design reviews. This covers the CPCI BTTDEV during the IOC phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). This covers the CPCI BTTDEV during the IOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). Integrate and Test to CPC Level This covers the CPCI BTTDEV during the IOC phase and includes the development of source code at the module level, its unit test and debug. This covers the CPCI BTTDEV during the IOC phase and includes the SW development activities to integrate and test modules up to CPC level. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 is w IBM RFP WBS NO. WBS NO. 644175 4.4.2.4 644176 4.4.2.4 644177 4.4.2.4 644178 4.4.2.4 644180 4.4.2.5 644181 4.4.2.5 WBS WBS TITLE DESCRIPTION Test at the CPC and This covers the CPCI BTTDEV during the IOC CPCI Levels phase and includes the formal testing by the T&V group. This testing consist of PQT testing of CPC/Ships and FQT testing of complete CPCI's and its interface with other CPCI's. Develop SW Test This covers the CPCI BTTDEV during the IOC Procedure phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps and environment data to be collected. Support Test and This covers the CPCI BTTDEV during the IOC Manual (Final) Prepare Test Reports CPCI Listings As-built Prepare Programmers phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. This covers the CPCI BTTDEV during the IOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. This covers the CPCI BTTDEV during the IOC phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI (CDRL #150) This covers the CPCI BTTDEV during the IOC phase and includes the preparation of final version of the Programmers Manual (CDRL #138). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. 4.4.2.2 WBS TITLE Prepare Inputs to Training Manuals Prepare As-Built Part II Specs. Prepare Build-to Part II Specs. and Conduct Internal Reviews Prepare (Prelim) Programmers Manual Prepare CPCI Test Plan (Final) - Appendix for WAPPLS Integrate and Test to CPC Level WBS DESCRIPTION This covers the CPCI BTTDEV during the IOC phase and includes the preparation inputs to various training manuals. This covers the CPCI BTTDEV during the IOC phase and includes the preparation of the the "as-built" version of the CPCI Part II specs (CDRL #142). The "as-built" version defines the exact configuration of accepted computer programs. This covers the CPCI WAPPLS during the IOC phase and includes the preparation of the CPCI Part II Specification or the "built-to" specification (CDRL #142) and participation in internal design reviews. This covers the CPCI WAPPLS during the IOC phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). This covers the CPCI WAPPLS during the IOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). This covers the CPCI WAPPLS.during the IOC phase and includes the development of source code at the module level, its unit test and debug. This covers the CPCI WAPPLS during the IOC phase and includes the SW development activities to integrate and test modules up to CPC level. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 is w IBM RFP WBS NO. WBS NO. 644189 4.4.2.4 644190 4.4.2.4 644191 4.4.2.4 644192 4.4.2.4 644193 4.4.2.5 644194 4.4.2.5 WBS WBS TITLE DESCRIPTION Test at the CPC and This covers the CPCI WAPPLS during the IOC CPCI Levels phase and includes the formal testing by the T&V group. This testing consist of PQT testing of CPC/Ships and FQT testing of complete CPCI's and its interface with other CPCI's. Develop SW Test This covers the CPCI WAPPLS during the IOC Procedure phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps and environment data to be collected. Support Test and Verification This covers the CPCI WAPPLS during the IOC phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. Prepare Test Reports This covers the CPCI WAPPLS during the IOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing... Prepare Inputs to user, This covers the CPCI WAOOKS during the IOC Operator and Data Base phase and includes the preparation of inputs Administration Manuals to Users Manual (CDRL #135), Operators Manual (CDRL #136), and Data Base Adminstrator Manual (CDRL #137). CPCI Listings As-built This covers the CPCI WAPPLS during the IOC phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI.(CDRL #150) Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? V IBM WBS NO. RFP WBS NO. WBS TITLE Prepare Programmers Manual (Final) Prepare Inputs to Training Manuals Prepare As-Built Part II Specs. Test at the CPC and CPCI Levels WBS DESCRIPTION This covers the CPCI WAPPLS during the IOC phase and includes the preparation of final version of the Programmers Manual (CDRL #138). This covers the CPCI WAPPLS during the IOC phase and includes the preparation inputs to various training manuals. This covers the CPCI WAPPLS during the IOC phase and includes the preparation of the the "as-built" version of the CPCI Part II specs (CDRL #142). The "as-built" version defines the exact configuration of accepted computer programs. This covers the CPCI BEXSUP during the IOC phase and includes-the formal testing by the T&V group. This testing consist of PQT testing of CPC/Ships and FQT testing of complete CPCI's and its interface with other CPCI's. Develop SW Test Procedure Support Test and Verification This covers the CPCI BEXSUP during the IOC phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps and environment data to be collected. This covers the CPCI BEXSUP during the IOC phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM RFP WBS NO. WBS NO. 644206 4.4.2.4 245000 4.5 645001 4.5.1 645004 4.5.1 645005 4.5.1 645008 4.5.1 WBS WBS TITLE DESCRIPTION Prepare Test Reports Software Development (FOC) Manage All SW Development SW Architecture This covers the CPCI BEXSUP during the IOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. This covers the software development effort during the FOC phase and includes the follow- ing functions: management, preliminary design, critical design, development, test, and documentation. This covers the efforts of record and third level management functions required to manage the SW development tasks in the FOC phase. Covers the effort required to ensure SW architectural integrity during the FOC phase. Technical Support to Sub- Covers the software development effort contract Management required to support Subcontract Manage- ment to ensure technical oversight during the FOC phase. Library Control Covers the performance of routine source library maintenance/control activities during the FOC phase. Perform software builds and maintains software version control/documentation. Maintain hard copy control. This element covers the FOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 . IBM WBS NO. RFP WBS NO. WBS TITLE Provide Inputs to Segment Development Plan Data Base Package Data Base Support to Development and Test and Verification Prepare Built-to Part II Specs. and Conduct Internal Design Review Prepare (Prelim.) Programmers Manual WBS DESCRIPTION Prepares and maintains the software section of the Segment Development Plan during the FOC phase. This covers the preparation of the Data Base Package (CDRL #151) which defines the actual entries to be used for initializing each data base item. This element covers the FOC phase. This effort includes the Data Base Admin- istration function and production of the final version of the Data Base Administra- tion Manual (CDRL #137) during the FOC base. This covers the CPCI BMMGMT during the FOC phase and includes the preparation of the CPCI Part II specification or the "built-to" specification (CDRL #142) and participation in internal design reviews. This covers the CPCI BMMGMT during the FOC phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). Prepare CPCI Test Plan (Final) - Appendix for BMMGMT This covers the CPCI BMMGMT during the FOC phase and includes the preparation of the final CPCI Test Plan (CDRL #131). This covers the CPCI BMMGMT during the FOC phase and includes the development of source code at the module level, its unit test and debug. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM RFP WBS NO. WBS NO. 645019 4.5.2.3 645020 4.5.2.4 645021 4.5.2.4 645022 4.5.2.4 645023 4.5.2.4 645024 4.5.2.5 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w WBS WBS TITLE DESCRIPTION Integrate and Test to CPC This covers the CPCI BMMGMT during the FOC Level phase and includes the SW development activities to integrate and test modules up to CPC level. Test at the CPC and CPCI This covers BMMGMT during the FOC phase Levels and includes the formal testing by the T&V group. This testing consist of PQT testing of CPC/String and FQT testing of complete CPCI's and its interface with other CPCI's. Develop SW Test Procedures This covers the CPCI BMMGMT during the FOC phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps and environment data to be collected. Support Test and Verification This covers the CPCI BMMGMT during the FOC phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to accept- ance. Also includes all problem analysis and error correction. Prepare Test Reports This covers the CPCI BMMGMT during the FOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. Prepare Inputs to User, This covers the CPCI BMMGMT during the FOC Operator and Data Base phase and includes the preparation of inputs Administration Manuals to Users Manual (CDRL #135), Operators Manual (CDRL #136), and Data Base Admin- istrators Manual (CDRL #137). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM RFP WBS NO. WBS NO. 645025 4.5.2.5 645026 4.5.2.5 645027 4.5.2.5 645028 4.5.2.5 645029 4.5.2.2 645030 4.5.2.2 645031 4.5.2.2 WBS WBS TITLE DESCRIPTION CPCI Listings As-built This covers the CPCI BMMGMT during the FOC phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI (CDRL #150). Prepare Programmers Manual This covers the CPCI BMMGMT during the FOC (Final) phase and includes the preparation of final version of the Programmers Manual (CDRL #138). Prepare Inputs to Training This covers the CPCI BMMGMT during the FOC Manuals phase and includes the preparation inputs to the various training manuals. Prepare As-Built Part II This covers the CPCI BMMGMT during the FOC Specs. phase and includes the preparation of the "as-built" version of the CPCI Part II specs. (CDRL #142). The "as-built" version defines the exact configuration of accepted computer programs. Prepare Built-to Part II This covers the CPCI BCCNTR during the FOC Specs. and Conduct Internal phase and includes the preparation of the Design Review CPCI Part II Specification or the "built-to" specification (CDRL #142) and participation in internal design reviews. Prepare (Prelim) This covers the CPCI BCCNTR during the FOC Programmers Manual phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). Prepare CPCI Test Plan This covers the CPCI BCCNTR during the FOC (Final) - Appendix for phase and includes the preparation of the BMMGMT final CPCI Test Plan (CDRL #131). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. 645032 4.5.2.3 645033 4.5.2.3 645034 4.5.2.4 645035 4.5.2.4 645036 4.5.2.4 645037 4.5.2.4 WBS WBS TITLE DESCRIPTION Code and Unit Test This covers the CPCI BCCNTR during the FOC phase and includes the development of source code at the module level, its unit test and debug. Integrate and Test to CDC This covers the CPCI BCCNTR during the FOC Level phase and includes the SW development activities to integrate and test modules up to CPC level. Test at the CPC and CPCI This covers CPCI BCCNTR during-the FOC Levels phase and includes the formal testing by the T&V group. This testing consist of PQT testing of CPC/Strings and FQT testing of com- plete CPCI's and its interfaces with other CPCI's. Develop SW Test Procedures This covers the CPCI BCCNTR during the FOC phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps and environment data to be collected. Support Test and Verification This covers the CPCI BCCNTR during the FOC phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to accept- ance. Also includes all problem analysis and error correction. Prepare Test Reports This covers the CPCI BCCNTR during the FOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM RFP WBS NO. WBS NO. 645038 4.5.2.5 645039 4.5.2.5 645040 4.5.2.5 645042 4.5.2.5 645043 4.5.2.2 645044 4.5.2.2 WBS WBS TITLE DESCRIPTION Prepare Inputs to User, This covers the CPCI BCCNTR during the FOC Operator and Data Base phase and includes the preparation of inputs Administration Manuals to Users Manual (CDRL #135), Operators Manual (CDRL #136), and Data Base Admin- istrators Manual (CDRL #137). CPCI Listings As-built This covers the CPCI BCCNTR during the FOC phase and includes the listing of source instruction statements and object code for all CPC forming the CPCI (CDRL #150). Prepare Programmers Manual This covers the CPCI BCCNTR during the FOC (Final) phase and includes the preparation of final version of the Programmers Manual (CDRL #138). Prepare As-Built Part II This covers the CPCI BCCNTR during the FOC Specs. phase and includes the preparation of the "as-built" version of the CPCI Part II specs. (CDRL #142). The "as-built" version defines the exact configuration of accepted computer programs. Prepare Built-to Part II This covers the CPCI BTTDEV during the FOC Specs. and Conduct Internal phase and includes the preparation of the Design Review CPCI Part II specification1or the "built-to" specification (CDRL #142) and participation in internal design reviews. Prepare (Prelim.) This covers the CPCI BTTDEV during the FOC Programmers Manual phase and includes the preparation of the preliminary Programmers Manual (CDRL #138). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. 645045 4.5.2.2 645046 4.5.2.3 645047 4.5.2.3 645048 4.5.2.4 645049 4.5.2.4 645050 4.5.2.4 WBS WBS TITLE DESCRIPTION Prepare CPCI Test Plan This covers the CPCI BTTDEV during the FOC (Final) - Appendix for phase and includes the preparation of the BTTDEV final CPCI Test Plan (CDRL #131). Code and Unit Test This covers the CPCI BTTDEV during the FOC phase and includes the development of source code at the module level, its unit test and debug. Integrate and Test to CPC This covers the CPCI BTTDEV during the FOC Level phase and includes the SW development activities to integrate and test modules up to CPC level., Test at the CPC and CPCI This covers CPCI BTTDEV during the FOC phase Levels and includes the formal testing by the T&V group. This testing consist of PQT testing of CPC/String and FQT testing of complete CPCI's and its interface with other CPCI's. Develop SW Test Procedures This covers the CPCI BTTDEV during the FOC phase and includes procedures describing test cases and acceptance criteria. Also includes detailed testing steps and environment data to be collected. Support Test and Verification This covers the CPCI BTTDEV during the FOC phase and includes the activities of the SW Development group to support all formal tests by the T&V group up to accept- ance. Also includes all problem analysis and error correction. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM RFP WBS NO. WBS NO. 645051 4.5.2.4 645052 4.5.2.5 645053 4.5.2.5 645056 4.5.2.5 WBS WBS TITLE DESCRIPTION Prepare Test Reports This covers the CPCI BTTDEV during the FOC phase and includes activities by the T&V group to prepare formal test reports on results of PQT/FQT testing. Prepare Inputs to User, This covers the CPCI BTTDEV during the FOC Operator and Data Base phase and includes the preparation of inputs Administration Manuals to Users Manual (CDRL #135), Operators Manual (CDRL #136), and Data Base Admin- istrators Manual (CDRL #137). CPCI Listings As-built This covers the CPCI BTTDEV during the FOC phase and includes the listing of source instruction statements and object code for. all CPC forming the CPCI (CDRL #150). Prepare As-Built Part II This covers the CPCI BTTDEV during the FOC Specs phase and includes the preparation of the "as-built" version of the CPCI Part II specs (CDRL #142). The "as-built" version defines the exact configuration of accepted computer programs. Hardware Development This category covers the hardware develop- ment effort and includes: management, preliminary design, critical design, devel- opment test and documentation functions. 646100 4.6.1 Manage All Hardware This covers the efforts of second and third Development level management required in order to manage the hardware development tasks in the BOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM RFP WBS WBS WBS NO. WBS NO. TITLE DESCRIPTION 646200 4.6.2.1 Accomplish (Prelim.) CI This covers the Cl BASIC IWS during the Design and Reports BOC phase and includes the design effort Analysis and Allocation which provides for analysis of the Segment 646203 4.6.2.2 Accomplish Detailed Design of CI 646206 4.6.2.3 Accomplish Fabrication of All Manufactured HW Design Spec. functions and performance and their allocation to individual CI's. This effort occurs after completion of the Design Concept Review and leads to generating of the CI spec. This covers the Cl BASIC IWS during the BOC phase and includes the effort, fol- lowing PDR approval which provides for detailed design including identification of all components and assemblies. up a manufacturing line including tooling and test equipment, procure components, and accomplish the manufacture and unit test and checkout of the integrated work stations. This covers the CI BASIC IWS during the BOC phase and includes the effort, following CDR approval, to set 646212 4.6.2.4 Prepare Hardware Test and This covers the CI BASIC IWS during TEMPEST Test Procedures the BOC phase and includes the effort, based on approved Segment Test Plan, to prepare detailed test procedures describing test cases and acceptance criteria. Also included is the effort to test to TEMPEST qualify all solution. 646253 4.6.2.5 Prepare Equipment Operation This covers the CI BASIC IWS during and Maintenance Manuals the BOC phase and includes the preparation of the Equipment Operation and Maintenance Manuals (CDRL #148). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. 646232 4.6.2.5 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 RFP WBS NO. WBS TITLE Accomplish (Prelim.) CI Design and Reports Analysis and Allocation WBS DESCRIPTION This covers the CI Enhanced IWS during the BOC phase and including the design effort which provides for analysis of the Segment Design Spec functions and performance and their allocation to individual CI's. This effort occurs after completion of the Design Concept Review and leads to generating of the CI spec. Prepare CI Specification and Conduct Internal Design Reviews Prepare Built-to Component Specs and Conduct Internal Design Review Support Test and Verification Prepare Equipment Operation and Maintenance Manuals This covers the CI Enhanced IWS during the BOC phase and includes the preparation of the CI Specification (CDRL #143) and the performance of internal design reviews. This covers the Cl Enhanced IWS during the BOC phase and includes the effort, following PDR approval, which provides for the generation of build- to component specs and the performance of internal design reviews. This covers the CI Enhanced IWS during the BOC phase and includes the activities of the HW Development group to support all formal tests by the, T&V group up to acceptance. Also includes all problem analysis and error correction. This covers the CI Enhanced IWS during the BOC phase and includes the preparation of the Equipment Operation and Maintenance Manuals (CDRL #148). Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 IBM WBS NO. RFP WBS NO. 646233 4.6.2.5 646234 4.6.2.5 647100 4.7.1 647222 4.7.2.3 647226 4.7.2.4 647230 4.7.2.2 Approved For Release 2007/07/05: CIA-RDP84TOO037ROO0300060001-2 w WBS TITLE WBS DESCRIPTION ? Prepare Inputs to Segment/ This covers the CI Enhanced IWS during System Operation and User the BOC phase and includes the preparation Manuals of inputs to the Segment/System Operation and User Manuals (CDRL #136 and CDRL #135 respectively). Prepare Inputs to Training This covers the CI Enhanced IWS during Manuals the BOC phase and includes the preparation of inputs to the various training manuals (CDRL #146). Manage All Hardware This covers the efforts of second and Development third level management required in order to manage the hardware development tasks in the IOC phase. Prepare Manufacturing This covers the CI Enhanced IWS during Drawing Packages the IOC phase and includes the preparation of manufacturing drawing packages. Support Test and Verification This covers the CI Enhanced IWS duirng the IOC phase and includes the activities of the HW Development group to support all formal tests by the T&V group up to acceptance. Also includes all problem analysis and error correction. Accomplish Detailed This covers the CI Full Capability IWS Design of CI during the IOC phase and includes the effort, following PDR approval which provides for detailed design, including identification of all components and assemblies. Approved For Release 2007/07/05: CIA-RDP84TOO037ROO0300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. 647231 4.7.2.2 647232 4.7.2.2 647242 4.7.2.5 648100 4.8.1 648232 4.8.2.2 249000 4.9 WBS WBS TITLE DESCRIPTION Prepare Built-to Component This covers the CI Full Capability IWS Specs. and Conduct Internal during the IOC phase and includes the Design Review effort, following PDR approval, which provides for the generation of build- to component specs and the performance of internal design reviews. Accomplish Critical Design This covers the CI Full Capability IWS of Commercial Product during the IOC phase and includes the Modification engineering effort to analyze and design any D/C segment peculiar modifications to commercial products used in the work station configuration. Prepare Equipment Operation This covers the CI Full Capability IWS and Maintenance Manuals during the IOC phase and includes the preparation of the Equipment Operation and Maintenance Manuals (CDRL #148). Manage All Hardware This covers the efforts of second and Development third level management required to manage the hardware development tasks in the FOC phase. Accomplish Critical Design This covers the CI Full Capability IWS of Commercial Product during the FOC phase and includes the Modifications engineering effort to analyze and design any D/C segment peculiar modifications to commercial products used in the work station configuration. Automated Data Processing This category covers the acquisition of all Equipment (ADPE) Hardware ADPE, the acceptance testing of ADPE, and and Software the modification, installation, testing and maintenance of GFE. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. v 649103 RFP WBS NO. WBS TITLE Manage All ADPE Procurement Activities Manage All ADPE Procurement Activities Manage All ADPE Procurement Activities Provide and Enforce All Procurement Practices, Standards and Conventions Provide and Enforce All Procurement Practices, Standards and Conventions WBS DESCRIPTION This covers the second and third level management of all the activities asso- ciated with the ADPE category during the BOC phase. This covers the second and third level management of all the activities associated with the ADPE category during the IOC phase. This covers the second and third level management of all the activities associated with the ADPE category during the FOC phase. This covers the management activities asso- ciated with providing and enforcing all procurement practices, standards, and con- ventions during the BOC phase. This covers the management activities asso- ciated with providing and enforcing all procurement practices, standards, and con- ventions during the IOC phase. Provide and Enforce All Procurement Practices, Standards and Conventions Project Labor to Support Procurement This covers the management activities asso- ciated with providing and enforcing all procurement practices, standards, and con- ventions during the FOC phase. This covers the effort by the SW Development group to provide support in the procurement of commercial CPCI's. This element covers the BOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. 649107 4.9.1 649108 4.9.1 649109 4.9.1 649110 4.9.1 649111 4.9.1 649112 4.9.1 649113 4.9.1 WBS WBS TITLE DESCRIPTION Project Labor to Support This covers the effort by the SW Development Procurement group to provide support in the procurement of commercial CPCI's. This element covers the IOC phase. Project Labor to Support This covers the effort by the SW Development Procurement group to provide support in the procurement of commercial CPCI's. This element covers the FOC phase. Procurement This covers the monthly licensing and service costs of commercial CPCI's during the BOC phase, prior to commencement of the BOC O&M period. Procurement This covers the monthly licensing and service costs of commercial CPCI's during the IOC phase, prior to commencement of the IOC O&M period. Procurement This covers the monthly licensing and service costs of commercial CPCI's during the FOC phase, prior to commencement of the FOC O&M period. Project Labor to Support This covers the effort by the System Procurement Engineering group to provide support in the procurement of commercial Cl's during the BOC phase. Project Labor to Support This covers the effort by the System Procurement Engineering group to provide support in the procurement of commercial CI's during the IOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05 CIA-RDP84T00037R000300060001-2 w IBM WBS NO. RFP WBS NO. 649115 4.9.1 649116 4.9.1 649300 4.9.3 649301 4.9.3 649303 4.9.3 241000 4.10 WBS WBS TITLE DESCRIPTION Procure This covers the purchase cost of commercial Cl's during the BOC phase, prior to com- mencement of the BOC O&M period. Procure This covers the purchase cost of commercial CI's during the IOC phase, prior to com- mencement of the IOC O&M period. Install and Checkout GFE This covers the effort to install and checkout GFE during the BOC phase. Principle item is the Local Area Network equipment installed at the development facility. Provide GFE Maintenance Provide GFE Maintenance Test and Verification This covers the effort to provide main- tenance of GFE during the BOC phase. This covers the effort to provide mainte- nance of GFE during the FOC phase. management, test support, integration test, and factory pre-ship test. All test and verification activities will be conducted at the development site. This covers the formal and informal testing of software, hardware, and system components that make up the D/C Segment. Included in this element are the following: test 641010 4.10.1 Provide Management of Segment This covers the technical management of Test Activities the segment test activities during the BOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE 641011 641012 4.10.1 4.10.1 Prepare Test Plans Prepare Test Procedures 641013 4.10.1 Prepare Test Plan for GFE o Equipment 641020 4.10.2 Provide Necessary Software to Support Integrated Testing 641021 4.10.2 Provide Necessary Hardware to Support Integrated Testing 641022 4.10.2 Provide Necessary Data to Support Integrated Testing 641030 4.10.3 Accomplish Inter-CPCI Testing WBS DESCRIPTION This is the activity to write detailed Test Plan (CDRL #131) covering all formal T&V steps at the development site during the BOC phase. This is the effort required to develop test procedures and covers test cases for hardware subsystem test and site installa- tion and checkout. Also included are hardware/software integration, and site tests including acceptance tests. This element covers the BOC phase. This covers the effort required to write detailed test plans for the UNIVAC 1100/81, GFE test, and Local Area Network communica- tion interface during the BOC phase. This covers TPNS script generation for hardware/software integration and stress testing during the BOC phase. This covers the effort to plan and provide test configuration and the integration of the test computer and LAN for execution of TPNS during the BOC phase. This covers the effort to provide data to be used in support of the testing efforts detailed in 641020 and 641021. This element covers the BOC phase. This covers the checkout and verification of integrated CPCI's using external interface simulators during the BOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? V IBM WBS NO. RFP WBS NO. 641031 4.10.3 641032 4.10.3 641033 4.10.3 641040 4.10.4 641041 4.10.4 641110 4.11.1 641111 4.11.1 WBS WBS TITLE DESCRIPTION Accomplish Inter-CI Testing This is the checkout and debug of the CI interfaces (processor, LAN, IWS) with diagnostic software during the BOC phase. Accomplish Integrated CPCI/ This covers stress testing the integrated CI Testing hardware/software system with the test computer and TPNS scripts during the BOC phase. Provide Integration Test This is the effort to prepare reports of Reports the results of tests performed on the integrated CPCI's during the BOC phase. Perform Formal Preship Test This covers the final preship test including factory acceptance witnessed by the Govern- ment and support to CM audit during the BOC phase. Provide Preship Test Report This covers the factory acceptance test report during the BOC phase. Provide Management of This covers the technical management of Segment Test Activities the Segment Test activities during the IOC phase. Prepare Test Plans This is the activity to write detailed Test Plan (CDRL #131) covering all formal T&V steps at the development site during the IOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. 641112 4.11.1 641113 4.11.1 641120 4.11.2 641121 4.11.2 641122 4.11.2 641130 4.11.3 641131 4.11.3 WBS WBS TITLE DESCRIPTION Prepare Test Procedures This is the effort required to develop test procedures and covers test cases for hardware subsystem test and site installation and checkout. Also included are hardware/ software integration, and site tests includ- ing acceptance tests. This element covers the IOC phase. Prepare Test Plan for GFE This covers the effort required to write Equipment detailed test plans for the UNIVAC 1100/81, GFE test, and Local Area Network communi- cation interface during the IOC phase. Provide Necessary Software This covers TPNS script generation for to Support Integrated Testing hardware/software integration and stress testing during the IOC phase. Provide Necessary Hardware This covers the effort to plan and provide to Support Integrated Testing test configuration and the integration of the test computer and LAN for execution of TPNS during the IOC phase. Provide Necessary Data to This covers the effort to provide data to Support Integrated Testing be used in support of the testing efforts detailed in 641120 and 641121. This element covers the IOC phase. Accomplish Inter-CPCI Testing This covers the checkout and verification of integrated CPCI's using external interface simulators during the IOC phase. Accomplish Inter-CI Testing This is the checkout and debug of the CI interfaces (processor, LAN, IWS) with diagnostic software during the IOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05 CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. 641132 4.11.3 641133 4.11.3 641140 4.11.4 641141 4.11.4 641210 4.12.1 641211 4.12.1 641212 4.12.1 WBS WBS TITLE DESCRIPTION Accomplish Integrated CPCI/ This covers stress testing the integrated CI Testing hardware/software system with the test computer and TPNS scripts during the IOC phase. Provide Integration Test This is the effort to prepare reports of Reports the results of tests performed on the integrated CPCI's during the IOC phase. Perform Formal Preship Test This covers the final preship test including factory acceptance witnessed by the Govern- ment and support to CM audit during the IOC phase. Provide Preship Test Report This covers the factory acceptance test report during the IOC phase. Provide Management of This covers the technical management of Segment Test Activities the Segment Test activities during the FOC phase. Prepare Test Plans This is the activity to write detailed Test Plan (CDRL #131) covering all formal T&V steps at the development site during the FOC phase. Prepare Test Procedures This is the effort required to develop test procedures and covers test cases for hardware subsystem test and site installation and checkout. Also included are hardware/ software integration, and site tests includ- ing acceptance tests. This element covers the FOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? V IBM WBS NO. RFP WBS NO. 641220 4.12.2 641221 4.12.2 641222 4.12.2 641230 4.12.3 641231 4.12.3 641232 4.12.3 641233 4.12.3 641240 4.12.4 WBS WBS TITLE DESCRIPTION Provide Necessary Software This covers TPNS script generation for to Support Integrated Testing hardware/software integration and stress testing during the FOC phase. Provide Necessary Hardware This covers the effort to plan and provide to Support Integrated Testing test configuration and the integration of the test computer and LAN for execution of TPNS during the FOC phase. Provide Necessary Data to This covers the effort to provide data to Support Integrated Testing be used in support of the testing efforts detailed in 641220 and 641221. This element covers the FOC phase. Accomplish Inter-CPCI Testing This covers the checkout and verification of integrated CPCI's using external interface simulators during the FOC phase. Accomplish Inter-CI Testing This is the checkout and debug of the CI interfaces (processor, LAN, IWS) with diagnostic software during the FOC phase. Accomplish Integrated CPCI/ This covers stress testing the integrated CI Testing hardware/software system with the test computer and TPNS scripts during the FOC phase. Provide Integration Test This is the effort to prepare reports of Reports the results of tests performed on the integrated CPCI's during the FOC phase. Perform Formal Preship Test This covers the final preship test including factory acceptance witnessed by the Govern- ment and support to CM audit during the FOC phase.. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. 241300 4.13 641310 4.13.1 641320 4.13.2 641321 4.13.2 641330 4.13.3 641331 4.13.3 641332 4.13.3 WBS WBS TITLE DESCRIPTION Installation, Checkout and This covers all efforts at the operational Test site to provide management, planning of and installation, checkout and test. Includes segment acceptance test and support to the SI to perform Inter-Segment Demos and Program Demos. Provide Management of This is the technical management at the Installation and Checkout operational site of all installation and Activities checkout activities during the BOC phase. Provide Facility Interface This covers the preparation of the Facility Drawings/Requirements IDRS (CDRL #139) including the floor plan for equipment installation during the BOC phase. Provide Facility Planning This is the analysis and coordination required for the equipment installation during the BOC phase. Prepare Segment Shipping This covers the preparation of the Shipping Plan Plan (CDRL #147) and includes instruction covering the packaging, and shipping of the equipment during the BOC phase. Prepare Segment Installation This covers the preparation of the Segment Plan Installation Plan (CDRL #134) and covers the instruction on the physical installation of the equipment on a non-interference basis. This element covers the BOC phase. Provide for Shipment, This covers the physical shipment of the Installation and Checkout equipment and checkout of all the segment of All Segment Items items during the BOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE Accomplish Segment Integra- tion and Transition to Operational Status Perform Formal Site Segment Test Provide Site Segment Test Report Contribute to System Test Plan and Test Report to Be Prepared by the SI Participate In On-Site System Testing WBS DESCRIPTION This covers the effort required to perform diagnostic test on the equipment to ensure operational readiness during the BOC phase. This is the rebaselining of the hardware/ software system and includes the performance of installation and checkout tests and pro- cedures and concludes with formal acceptance. This element covers the BOC phase. This covers the preparation of the Segment Test Reports (CDRL #154) which covers the activities defined in 641340. This element covers the BOC phase. This covers the preparation of inputs to SI's Test Plan and subsequent Test Reports during the BOC phase. These inputs constitute CDRL ##153 - System Test/Demo Inputs. This covers the effort to support the SI conducted on-site system testing during the BOC phase. Provide Input to Inter- Program Demonstration Plan to be Prepared by the SI Support Program Demos This covers the effort to provide input to SI prepared Test Plan, and Test Procedures employed in the conducting of Inter-Program Demos during the BOC phase. This covers the effort to support the SI conducted Program Demos during the BOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w WBS TITLE Provide Management of Installation and Checkout Activities Provide Facility Interface Drawings/Requirements Prepare Segment Shipping Plan Prepare Segment Installation Plan Provide for Shipment, Installation and Checkout of All Segment Items Accomplish Segment Integra- tion and Transition to Operational Status ? WBS DESCRIPTION This is the technical management at the operational site of all installation and checkout activities during the IOC phase. This covers the preparation of Test Plan during the IOC Phase. This covers the preparation of the Facility IDRS (CDRL #139) including the floor plan for equipment installation during the IOC phase. This covers the preparation of the Shipping Plan (CDRL #147) and includes instruction covering the packaging, and shipping of the equipment during the IOC phase. This covers the preparation of the Segment Installation Plan (CDRL #134) and covers the instruction on the physical installation of the equipment on a non-interference basis. This element covers the IOC phase. This covers the physical shipment of the equipment and checkout of all the segment items during the IOC phase. This covers the effort required to perform diagnostic test on the equipment to ensure operational readiness during the IOC phase. This is the rebaselining of the hardware/ software system and includes the performance of installation and checkout tests and pro- cedures and concludes with formal acceptance. This element covers the IOC phase. 641440 4.14.4 Perform Formal Site Segment Test Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE Provide Site Segment Test Report Contribute to System Test Plan and Test Report to be Prepared by the SI Provide Input to Inter- Program Demonstration Plan to be Prepared by the SI Support Program Demos Installation checkout and Test WBS DESCRIPTION This covers the preparation of the Segment Test Reports (CDRL #154) which covers the activities defined in 641440. This element covers the IOC phase. This covers the preparation of inputs to SI's Test Plan and subsequent Test Reports during the IOC phase. These inputs constitute CDRL #153 - System Test/Demo Inputs. This covers the effort to provide input to SI prepared Test Plan, and Test Procedures employed in the conducting of Inter-Program Demos during the IOC phase. This covers the effort to support the SI conducted Program Demos during the IOC phase. This covers all efforts at the operation site to provide management, planning of and installation checkout and test. Includes Segment acceptance test and support to the SI to perform Inter-Segment Demos and Program Demos Provide Management of Installation and Checkout Activities This is the technical management at the operational site of all installation and checkout activities during the FOC phase. This covers the preparation of the Facility IDRS (CDRL #139) including the floor plan for equipment installation during the FOC phase. 641520 4.15.2 Provide Facility Interface Drawings/Requirements Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE Provide Facility Planning Prepare Segment Shipping Plan Prepare Segment Installation Plan Provide for Shipment, Installation and Checkout of All Segment Items Accomplish Segment Integra- tion and Transition to Operational Status WBS DESCRIPTION This is the analysis and coordination required for the equipment installation during the FOC phase. This covers the preparation of the Shipping Plan (CDRL #147) and includes instruction covering the packaging, and shipping of the equipment during the FOC phase. This covers the preparation of the Segment Installation Plan (CDRL #184) and covers the instruction on the physical installation of the equipment on a non-interference basis. This element covers the FOC phase. This covers the physical shipment of the equipment and checkout of all the segment items during the FOC phase. This covers the effort required to perform diagnostic test on the equipment to ensure operational readiness during the FOC phase. This is the rebaselining of the hardware/ software system and includes the performance of installation and checkout tests and pro- cedures and concludes with formal acceptance. This element covers the FOC phase. Perform Formal Site Segment Test Provide Site Segment Test Report This covers the preparation of the Segment Test Reports (CDRL #154) which covers the activities defined in 641540. This element covers the FOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE Contribute to System Test Plan and Test Report to be Prepared by the SI Participate In On-Site System Testing Provide Input to Inter- Program Demonstration Plan to be Prepared by the SI Support Program Demos Development and Test Facility WBS DESCRIPTION This covers the preparation of inputs to SI's Test Plan and subsequent Test Reports during the IOC phase. These inputs constitute CDRL #153 - System Test/Demo Inputs. This covers the effort to support the SI conducted on-site system testing during the FOC phase. This covers the effort to provide input to SI prepared Test Plan, and Test Procedures employed in the conducting of Inter-Program Demos during the FOC phase. This covers the effort to support the SI conducted Program Demos during the FOC phase. This category covers the effort to define and specify the elements of the Development and Test Facility; to procure and checkout the facility; and to provide the services for operation and maintenance of the facility. Provide Management, Planning and Control of Development and Test Facility This covers the management, planning and control of facilities to support the analysis, human engineering, development, test and verification of segment software and hard- ware during the BOC phase. Provide Management, Planning and Control of Development and Test Facility Identical with 641610 except for the IOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE Provide Management, Planning and Control of Development and Test Facility Develop Necessary Test Tools, etc. for Development and Test Facility Develop Necessary Test Tools, etc. for Development and Test Facility Provide ADPE Capable of Supporting the Development and Test Facility Provide ADPE Capable of Supporting the Development And Test Facility Operate the Development and Test Facility WBS DESCRIPTION Identical with 641610 except for the FOC phase. This provides for the development and/or procurement of program products consisting of test drivers, data reduction/analysis programs for test and verification purposes during BOC phase. Identical with 641622 except for IOC phase. This covers the lease cost of ADPE needed to support the Development and Test Facility during BOC phase. Identical with 641630 except for IOC phase. This provides the necessary skills (System Engineers, System Programmers, Computer Operators and Librarians) to operate the Facility during BOC phase. Operate the Development and Test Facility Maintain the Development and Test Facility Identical with 641640 except for IOC phase. This covers purchase of commercial hardware maintenance and purchase of commercial software product licensing and service for Facility ADPE during BOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. 641654 4.16.5 641655 4.16.5 641656 4.16.5 641658 4.16.5 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w WBS TITLE Maintain the Development and Test Facility Provide Management, Planning and Control of Subcontractor Development and Test Facilities Provide Management, Planning and Control of Subcontractor Development and Test Facilities Provide Management, Planning and Control of Subcontractor Development and Test Facilities Services Services Equipment Equipment Equipment WBS DESCRIPTION Identical with 641643 except for IOC phase. ? This provides management, planning and control of subcontractor facilities to support the analysis, human engineering, development, test and verification of segment software and hardware during the BOC phase. Identical with 641650 except for IOC phase. Identical with 641650 except for FOC phase. This covers the development and/or pro- curement of software development tools, library support capabilities and test tools during the BOC phase. Identical with 641653 except for IOC phase. Identical with 641653 except for FOC phase. This covers the lease cost of ADPE needed to support the Development and Test Facility during BOC phase. Identical with 641656 except for IOC phase. Identical with 641656 except for FOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 VW IBM WBS NO. RFP WBS NO. WBS TITLE Operate Subcontractor Development and Test Facility Operate Subcontractor Development and Test Facility Operate Subcontractor Development and Test Facility Operate Subcontractor Development and Test Facility Operate Subcontractor Development and Test Facility Operate Subcontractor Development and Test Facility Training WBS DESCRIPTION This provides the necessary skills (System Engineers, System Programmers, Computer Operators and Librarians) to operate the subcontractor Facility during BOC phase. Identical with 641659 except for IOC phase. Identical with 641659 except for FOC phase. This covers purchase of commercial hardware maintenance and purchase of commercial soft- ware product licensing and service for Facility ADPE during the BOC phase. Identical with 64165C except for IOC phase. Identical with 64165C except for FOC phase. This element includes: training management, user training, operator training, and mainte- nance training. Manage All Training Activities This covers the management of all training activities during the BOC phase. 641711 4.17.1 Manage All Training Activities This covers the management of all training activities during the IOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05 CIA-RDP84T00037R000300060001-2 ? w IBM WBS NO. RFP WBS NO. WBS TITLE Manage All Training Activities Provide Segment Training Plan Provide Segment Training Plan Accept Other Segment Inputs and Prepare User Training Materials Accept Other Segment Inputs and Prepare User Training Materials Accept Other Segment Inputs and Prepare User Training Materials Train System Users and Government Instructors WBS DESCRIPTION This covers the management of all training activities during the FOC phase. This covers the preparation of the Segment Training Plan (CDRL #140) during the BOC phase. This covers the preparation of the Segment Training Plan (CDRL #140) during the IOC phase. This covers the effort required to integrate inputs from other segments into user/operator training materials and to prepare training materials (CDRL #146) during the BOC phase. This covers the effort required to integrate inputs from other segments into user/operator training materials and to prepare training materials (CDRL #146) during the IOC phase. This covers the effort required to integrate inputs from other segments into user/operator training materials and to prepare training materials (CDRL #146) during the FOC phase. This covers the effort required to train users of the system and Government instructors during the BOC phase. 641724 4.17.2 Train System Users and This covers the effort required to train Government Instructors users of the system and Government instructors during the IOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w WBS TITLE Train System Users and Government Instructors Prepare and Deliver Operator Training Materials Prepare and Deliver Operator Training Materials Prepare and Deliver Operator Training Materials Train Segment and System Operators and Management Personnel Train Segment and System Operators and Management Personnel Train Segment and System Operators and Management Personnel Prepare and Deliver Mainte- nance Training Materials ? WBS DESCRIPTION This covers the effort required to train users of the system and Government instructors during the FOC phase. This covers the preparation and delivery of operator training materials (CDRL #146) during the BOC phase. This covers the preparation and delivery of operator training materials (CDRL #146) during the IOC phase. This covers the preparation and delivery of operator training materials (CDRL #146) during the FOC phase. This covers the effort required to train segment and system operators and manage- ment personnel during the BOC phase. This covers the effort required to train segment and system operators and manage- ment personnel during the IOC phase. This covers the effort required to train segment and system operators and manage- ment personnel during the FOC phase. This covers the preparation and delivery of maintenance training materials (CDRL #146) during the BOC phase. This covers the preparation and delivery of maintenance training materials (CDRL #146) during the IOC phase. 641741 4.17.4 Prepare and Deliver Mainte- nance Training Materials Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? IBM WBS NO. RFP WBS NO. 641811 4.18.1 641812 4.18.1 641813 4.18.1 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 s WBS TITLE Prepare and Deliver Mainte- nance Training Materials Train All Segment Maintenance Personnel Train All Segment Maintenance Personnel Train All Segment Maintenance Personnel Operations and Maintenance (O&M) Provide O&M Management Provide O&M Management Provide O&M Management Provide O&M Project Control WBS DESCRIPTION This covers the preparation and delivery of maintenance training materials (CDRL #146) during the FOC phase. This covers the effort required to train all segment maintenance personnel during the BOC phase. This covers the effort required to train all segment maintenance personnel during the IOC phase. This covers the effort required to train all segment maintenance personnel during the FOC phase. This covers the management and planning and control of O&M activities; the pro- curement of equipment/services to perform O&M; and the actual execution of O&M services over the specified life of the contract. This covers the project management needed to manage, plan and control O&M during the BOC phase. Identical with 641810 except for IOC phase. Identical with 641810 except for FOC phase. This provides the project schedule and financial monitoring effort to maintain project control including review and periodic reporting to the Government. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 ? Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w 40 IBM WBS NO. RFP WBS NO. WBS TITLE WBS DESCRIPTION 641814 4.18.1 Provide O&M Project Control Identical with 641812 except for IOC phase. 641815 4.18.1 Provide O&M Project Control Identical with 641812 except for FOC phase. 641836 4.18.3 Problem Analysis, Error Correction and Update Documentation Problem Analysis, Error Correction and Update Documentation Problem Analysis, Error Correction and Update Documentation Test Software Changes Test Software Changes Test Software Changes Maintain Commercial Software Products This provides system maintenance programmers to perform problem analysis and error cor- rection when software problems arise during BOC phase. Also included is effort to update documentation. Identical with 641836 except for IOC phase. Identical with 641836 except for FOC phase. This provides test personnel to test and verify conformance with specification, any software changes made to the Segment during BOC phase. Identical with 641839 except for IOC phase O&M. Identical with 641839 except for FOC phase O&M. This covers purchase of commercial software product licensing and service during BOC phase 0&M. 64183D 4.18.3 Maintain Commercial Software Products Identical with 64183C except for IOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 IBM WBS NO. RFP WBS NO. 641844 4.18.4 641845 4.18.4 641870 4.18.7 641871 4.18.7 Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2 w WBS TITLE Maintain Commercial Software Products Hardware Problem Analysis, Error Correction and Update Documentation Hardware Problem Analysis, Error Correction and Update Documentation Hardware Problem Analysis, Error Correction and Update Documentation Maintain Commercial Hardware Maintain Commercial Hardware Provide Travel and Living Expenses of O&M Personnel Provide Travel and Living Expenses for O&M Personnel WBS DESCRIPTION J Identical with 64183C except for FOC phase. This provides hardware engineers to perform problem analysis and error correction when hardware problems arise during BOC phase O&M. Also included is effort to update documentation. Identical with 641840 except for IOC phase. Identical with 641840 except for FOC phase. This covers purchase of commercial hardware maintenance based on 24 hour per day, 7 day per week on-call maintenance during BOC phase O&M. Identical with 641843 except for IOC phase. Identical with 641843 except for FOC phase. This covers both local and long distance travel and living expense of contractor personnel engaged in performance of BOC phase O&M. Identical with 641870 except for IOC phase. Approved For Release 2007/07/05: CIA-RDP84T00037R000300060001-2