PROCESSING WEEKLY REPORT FOR WEEK ENDING 4 AUGUST 1981

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP84-00933R000400200039-6
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
4
Document Creation Date: 
December 15, 2016
Document Release Date: 
November 13, 2003
Sequence Number: 
39
Case Number: 
Publication Date: 
August 5, 1981
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP84-00933R000400200039-6.pdf148.64 KB
Body: 
Approved For4jolease 2004/05/05 : CIA-RDP84-0093311800400200039-6 5 August 1981 MEMORANDUM FOR: Acting Director of Data Processing ATTENTION: Executive Officer STAT FROM: Deputy Director for Processing SUBJECT: Processing Weekly Report for Week Ending 4 August 1981 STAT STAT 1. Systems Availability: Attached is the Systems Availability Report. had an unusually large number of problems this week. 2. Applications availability in the Ruffing Center was average this week. TADS was out for 1.3 hours Wednesday because of CDC disk drive and controller failures. On Friday, a hardware error in the Multiprocessor halted VM for 68 minutes. The Versatec plotter, the 6670 and 9700 laser printers and the line printers 3. The Special Center had an average week. A printer hung an I/O channel on Thursday, which cost TPSTAR 1.8 hours and TPNIPS 50 minutes. Monday CAMS lost 3.8 hours due to CAMS software, Telex disk errors, and Amdahl power supply failure, and teleprocess- 4. Release 1 of the VM ETECS support has been delivered to P&PD and is now being used for a majority of the ETECS jobs. This software permits files to be transported automatically from VM to the P&PD document composition system. It represents the culmination of over four years of efforts to create an automated link. An enhanced version of the software is currently being 5. The search continued for the four missing cables mentioned in last week's report. We were able to track down other addresses on the cables and determine that they had not received their copies. The customer, OPA, has had their hardcopy version from Cable Secre- tariat turned off for sometime. Due to this, their analyst did not Approved For Release 2004/05/05 : CIA-RDP84-00933R000400200039-6 Approved Forlease 2004/05/05 : CIA-RDP84-00933W00400200039-6 STAT STAT invited to all future GAS monthend meetings. 6. Applications is looking into a means of verifying cable traffic through the t ystems. As of now no progress has been reported. 7. The monthly GAS meeting was held Wednesday. A special fiscal year-end schedule was presented by OF and accepted. OF also questioned Xerox procedures, now that Reports Printing and Distribution area part of OD. A representative from OD will be 8. Due to several power outages and power surges, it was necessary for IV Phase customer engineers to realign and replace v r- I some disk, d r es re scheduled for implementation on 30 August. S y e ME data and a general survey of the user community. The response problem area cannot be immediately ide but is currently under review by PD/DBMB and SPD. 11. The new CAMS passwords and receipt forms were delivered to CMB/PTO and A Division for distribution on 3 August. The new passwords STAT 9. Three additional disk drives and a controller will be added to the GIMPRODUCTION system within 2 weeks. These drives will be used to redistribute some of the high activity data bases and to accommodate for projected new data bases. STAT 10. Over the past several weeks the response time on GIMPRODUCTION has been noticeably degraded. This has been confirmed b +_ in GI M 12. Testing continues on the IBM 360/20 conversion effort to the IBM 3505/3525 reader/punch. Some del been experienced due to both hardware and software problems. The newly installed 1000 line per minu VM STAT was thoroughly tested from 26-31 July. STAT required to respond to service calls daily. 14. The lI Facility experienced severe problems with Hetra Printers the en ire week. Hetra service representatives were Att: a/s STAT STAT STAT STAT STAT STAT Approved For Release 2004/05/05 : CIA-RDP84-00933R000400200039-6 Approved Fot elease 2004/05/05 : CIA-RDP84-0093OR000400200039-6 UNCLASSIFIED DDA/ODP SYSTEMS AVAILABILITY SUMMARY MONDAY 27 JUL 1981 THRU SUNDAY 02 AUG 1981 SYSTEM CURRENT WEEK 27 JUL - 02 AUG PREVIOUS 90 DAYS 26 APR - 26 JUL DIFFERENCE BATCH 95.86 97.37 - 1.51 INTERACTIVE 94.85 96.95 - 2.10 GIMS 93.94 97.36 - 3.42 CAMS 99.23 97.52 + 1.71 OCR-COLTS 93.30 95.22 - 1.92 OCR-RECON 87.20 96.07 - 8.87 DDO-STAR 97.82 96.69 + 1.13 OSWR?-TADS 94.61 97.97 - 3.36 BATCH, INTERACTIVE, GIMS, OCR-COLTS, OCR-RECON, and OSWR-TADS all reported below the goal of 96 percent for the week with each application recording outages due to hardware, software, procedural (telephone company pulling cables), and UPS power problems. - BATCH experienced 5 hours and 15 minutes of outages due to UPS power failures, 1 hour and 8 minutes of hardware problems, and a 35 minute procedural problem. - INTERACTIVE (VM) had 1 hour and 48 minutes of hardware problems and 1 hour and 2 minutes of outages due to UPS power failures. - GIMS experienced a 1 hour and 59 minute procedural problem and a 1 hour and 3 minute outage due to a UPS power failure. - OCR-COLTS had 1 hour and 56 minutes of procedural problems, a 40 minute outage due to a UPS power failure, 35 minutes of hardware problems, and a 5 minute software error. Approved For Release 2004/05/05 : CIA-RDP84-00933R000400200039-6 Approved For,,~elease 2004/05/05 : CIA-RDP84-00900400200039-6 - OCR-RECON experienced 1 hour and 15 minutes of hardware problems, a 1 hour software error, a 40 minute outage due to a UPS power failure, and 3 hours and 29 minutes of procedural problems, including 1 hour and 33 minutes of OCR data set problems. - OSWR-TADS had 2 hours and 46 minutes of hardware problems (CDC) and a 12 minute outage due to a UPS power failure. Approved For Release 2004/05/05 : CIA-RDP84-00933R000400200039-6