PROCESSING WEEKLY REPORT FOR WEEK ENDING 26 MAY 1981

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP84-00933R000400190026-2
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
3
Document Creation Date: 
December 15, 2016
Document Release Date: 
January 8, 2004
Sequence Number: 
26
Case Number: 
Publication Date: 
May 27, 1981
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP84-00933R000400190026-2.pdf108.49 KB
Body: 
Approved FQ Release 2004/05/05 : CIA-RDP84-00943R000400190026-2 27 May 1981 MEMORANDUM FOR: Director of Data Processing ATTENTION: Executive Officer STAT FROM: Deputy Director for Processing SUBJECT: Processing Weekly Report for Week Ending 26 May 1981 1. Systems Availability: Attached is the Systems Availability Report. 2. CLS. The CLS Administrator briefed OCR on PANVALET/- PANEXEC. OCR expressed interest in using PANVALET to store their source programs, and will be contacting CLS in regard to becoming STAT PANVALET users. 0 3. The monthly Insurance Trial Balance report has been converted from 360/20 produced screen line paper to Xerox 9700 output. Processing time was reduced by 4 hours and paper costs STAT were reduced by 85%. 6. On Monday, 18 May, the contractor began installing the raised floor in the SAFE Computer Center. Expected completion date 4. Procedures were implemented in the DBCC to handle C Divisions requirements for processing overnight BATCHGIM2 programs that access GIMPRODUCTION data bases. These new procedures became necessary with the implementation of ACF2 rules which protect GIMPROD data sets from unauthorized users. The new procedures involve C Division spooling jobs to the DBCC via VM and DBCC submitting these jobs under the proper ACF2 STAT authority and control. 5. A full cross check of the STAR data base was performed on Sunday, 24 May and Monday 25 May. STAT is Friday, 12 June. processor and 470/V8 as primary Batch on Saturday, 30 May. 7. CEMB will complete cabling of 3033 as primary GIMS Approved For Release 2004/05/05 : CIA-RDP84-00933R000400190026-2 Approved Fir Release 2004/05/05 : CIA-RDP84-00R000400190026-2 8. CEMB and Amdahl uncablecalbe 470/V6 in GC-03 and move machine to GC-47 on Saturday, 30 May and Sunday 31 May. 0 9. Comten 3 3690 has been installed with no problems. This completes the 3690 installations in the Ruffing Center. There are now five 3690 units in production in the Ruffing Center. 10. An additional Channel Interface is being installed in Comten 6 and 8 in the Special Center. This is to support VM in STAT the Special Center. 11. A fair week for applications availability was experienced in the Ruffing Center. Wednesday, AEGIS lost two hours due to OCR errors in allocating disk storage. JES lost 82 minutes Friday due to a hardware failure in the interface between the Global and Local computers. A failure in an uninterruptable power supply (UPS) during an UPS test on Saturday cost JES three hours and 40 minutes, TADS four and a half hours, and VM six hours. The Versatec plotter again suffered several failures during the week and was down at the end of this reporting STAT period. 12. The Special Center had a generally good week. NIPS lost three hours Thursday due to a SPD problem with sign-on software. CAMS lost 87 minutes Saturday morning due to the same UPS failure that affected the Ruffing Center at a time when the CAMS backup CPU was not available. STAR lost an hour Saturday due to an error in performing T-Bar switching. Att: a/s Approved For Release 2004/05/05 : CIA-RDP84-00933R000400190026-2 Approved Fookelease 2004/05/05 : CIA-RDP84-009 8000400190026-2 UNCLASSIFIED DDA/ODP SYSTEMS AVAILABILITY SUMMARY MONDAY 18 MAY 1981 THRU SUNDAY 24 MAY 1981 SYSTEM CURRENT WEEK 18 MAY - 24 MAY PREVIOUS 90 DAYS 17 FEB - 17 MAY DIFFERENCE BATCH 96.30 96.66 - .36 INTERACTIVE 99.04 95.33 + 3.71 GIMS 98.87 96.44 + 2.43 CAMS 98.60 97.92 + .68 OCR-COLTS 95.67 94.45 + 1.22 OCR-RECON 100.00 93.50 + 6.50 DDO-STAR 98.19 94.83 + 3.36 OSWR-TADS 96.79 96.49 + .30 All systems, with the exception of OCR-COLTS, reported above the goal of 96 percent for the week. OCR-COLTS had a 10 minute software error, and a procedural problem updating a catalog which resulted in a 2 hour outage. Approved For Release 2004/05/05 : CIA-RDP84-00933R000400190026-2