PROCESSING WEEKLY REPORT FOR WEEK ENDING 9 JUNE 1981
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP84-00933R000400190018-1
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
3
Document Creation Date:
December 15, 2016
Document Release Date:
January 8, 2004
Sequence Number:
18
Case Number:
Publication Date:
June 10, 1981
Content Type:
MF
File:
Attachment | Size |
---|---|
CIA-RDP84-00933R000400190018-1.pdf | 110.21 KB |
Body:
Approved For Release 2004/05/05 : CIA-RDP84-009300000400190018-1
MEMORANDUM FOR: Director of Data Processing
ATTENTION: Executive Officer
STAT FROM:
Deputy Director for Processing
SUBJECT: Processing Weekly Report for
Week Ending 9 June 1981
1. Systems Availability: Attached is the Systems
Availability Report.
:a
2. The software to interface the OGSR high speed plotter
STAT
STAT
3. An enhanced version of the ODP OS6 software supporting
the IBM 6670 laser printer has been installed. This version
supports the advanced functions of the latest 6670 microcode,
and allows magnetic cards to be read in the VM spool. STAT
4. Final drawings of the Control Point/Office area for the
new SAFE Computer Center were revised and presented to the Head-
quarters Engineering Branch. Construction on this area is scheduled
for Janaury 1982.
the date this system is expected to be operational.
Center is planned for Saturday, 13 June. Saturday, 20 June is
an Isolator in Room 503 and completion L01 the Grid System.
6. Installation of the Amdahl 470/V6 from the Ruffing
5. ODP/Engineering and the Office of Communications completed
a survey for installation of the IBM 6670 in Ames Building for ORD.
OC indicated this system can be installed after the installation of
IBM 370/168-1 OCR online processor.
7. Operations has received favorable comments from OCR
users on the improved response time of all OCR applications. This
is attributed to the removal of the Batch processing effort on the
STAT
STAT_
STAT
Approved For Release 2004/05/05 : CIA-RDP84-00933R000400190018-1
Approved Fo elease 2004/05/05 : CIA-RDP84-0093 000400190018-1
STAT
Monday, 1 June.
0
9. Technicians from OSO began setting up equipment on the
IBM Model 360/20 printer for emanation testin scheduled to begin
Monday 8 June, for two or three days.
be installed for Production use on 13 June.
10. A 72-hour test of MPS was conducted on 2-4 June and
a full Production Test was conducted on 6-7 June. No major
problems have surfaced on the MPS side, but CDS is experiencing
a line problem between themselves and Datex which may seriously
affect throughput. If the CDS problem can be resolved, MPS will
11. Cable Processing. A change was made the night of 7 June
STAT which caused incoming traffic to be flushed from the
system. SPD corrected the error on 8 June, but several hundred'
cables will have to be retransmitted.
12. GIMPROD was moved to the 3033 (SY4) over the weekend of
6 June. SY4 will be the primary CPU for GIMPROD with SY1 as its
backup. This will provide an increase in CPU power fJr GIMPROD.
STAT
STAT
STAT
13. The Ruffing Center had a good week, but all systems had
some problems. Friday morning JES, Batch, and GIMS were halted
due to a problem with a Telex disk controller--the outages ranged
from 15 to 45 minutes. OCR applications all lost an hour Monday
at startup when a Comten was found left disabled after maintenance
had been completed on it. That evening TADS failed due to a pro-
blem in CDC equipment, causing several disk drives to lose power.
Tuesday the MP1 failed, causing degraded VM operations much of the
day.
8. The IBM 3033-MP system began acceptance testing on
14. The Special Center had a fair week with problems on all
systems. TPNIPS lost 90 minutes on Saturday when a Telex disk
drive failed. TPSTAR, TPNIPS, and DDOGIMS were all late in start-
ing Tuesday due to an IBM disk controller failure--STAR lost nearly
Att: a/s
Approved For Release 2004/05/05 : CIA-RDP84-00933R000400190018-1
Approved For,.R-elease 2004/05/05 : CIA-RDP84-0093 000400190018-1
DDA/ODP
SYSTEMS AVAILABILITY SUMMARY
MONDAY 01 JUN 1981 THRU SUNDAY 07 JUN 1981
SYSTEM
CURRENT WEEK
01 JUN - 07 JUN
PREVIOUS 90 DAYS
02 MAR - 31 MAY
DIFFERENCE
BATCH
98.52
97.45
+ 1.07
INTERACTIVE
99.28
95.68
+ 3.60
GIMS
96.40
97.12
- .72
CAMS
99.39
98.16
+ 1.23
OCR-COLTS
96.10
95.32
+ .78
OCR-RECON
97.60
94.85
+ 2.75
DDO-STAR
96.38
95.64
+ .74
OSWR-TADS
100.00
96.38
+ 3.62
All applications reported above the goal of 96 percent for
the week. _
Approved For Release 2004/05/05 : CIA-RDP84-00933R000400190018-1