PROCESSING WEEKLY REPORT FOR WEEK ENDING 17 FEBRUARY 1981

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP84-00933R000400180035-3
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
3
Document Creation Date: 
December 15, 2016
Document Release Date: 
October 14, 2003
Sequence Number: 
35
Case Number: 
Publication Date: 
February 18, 1981
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP84-00933R000400180035-3.pdf125.09 KB
Body: 
Approved-for Release 2003/11/06: CIA-RDP84-3R000400180035-3 18 February 1981 MEMORANDUM FOR: Director of Data Processing ATTENTION: FROM: Deputy Director for Processing SUBJECT: Processing Weekly Report for Week Ending 17 February 1981 1. Systems Availability: Attached is the Systems Availability Report. 2. The new release of the VM operating system software (VM/SP) was installed 8 February. High user activity levels and performance problems with the new VM software resulted in degraded response all week. Problems with the new software also resulted in 1:40 of downtime for the week (availability = 96.97%). The source of the additional overhead required by the new operating system is being investigated. (Note: New all time user level on 10 February was 327 users.) 3. The GIMPROD service was available for only 90% of its scheduled"up" time during this week. The primary causes of down- time were GIMS software problems and an Amdahl processor failure. 4. The Ruffing Center had a moderate week. On Wednesday, the batch system lost 20 mintues due to software-related problems, and on Thursday 161 minutes due to a bad paging pack and JES pro- blems induced by applications software. JES was down 131 minutes due to V6 hardware problems and paging difficulties; GIMDEV and the batch system lost a somewhat lesser amount. OCR also lost 106 minutes on Friday due to hardware problems. Acceptance testing for the new Telex drives (subsystem 14) was completed during the week. 5. The Special Center had a good week. On Wednesday there were Comten failures and also a loss of communications with all tape drives due to a bad card in one of the drives. This and some other difficulties caused a loss of DDOGIMS for 192 minutes, TPNIPS for 175 minutes, and TPSTAR for 105 minutes. CAMPROD had very little di:Eficulty,and a perfect week since Thursday. Approved For Release 2003/11/06 : CIA-RDP84-00933R000400180035-3 Approved *or Release 2003/11/06 : CIA-RDP84-OW63R000400180035-3 6. New sysgens have been installed on Comten 6 in the Special Center and on Comtens 4 and 5 in the Ruffing Center. The sysgens incorporate fixes to allow the Delta Data 7260 to use CAM and full screen edit. Also included are additional switching characters for DDO and VM. 7. The installation of the raised flooring for the 1D16 expansion area was completed during the 13-16 February weekend. Progress continues on the installation of the 60Hz and 415Hz power panels for the area. 8. TBAR and ED personnel upgraded the TEAR II matrice in the Ruffing Center from a 4x8 to 8x8 matrice. This is in antici- pation of the expanded number of byte channels available with the new VM processor. 9. A 3350 Disk Pack was allocated to OCR to meet partial allocation of the Pilot Mail DASD Requirement for FY-81. 10. The CMS component of VM/SP was installed on the general timesharing and TADS systems. This completes the migration from VM/370 to the VM/SP operating system as the base for our interactive services. 11. CPR Cleaning Systems, a professional cleaning service under contract to the Agency, gave the GC-03 Computer Center a thorough cleaning on Saturday, 14 February. 12. Two megabytes of Cambridge Memory will be installed on the 370/168-2 on 21 February. The system will be unavailable for approximately 40 hours. 13. A 20 hour chilled water outage is scheduled for 21 February. This outage is scheduled to allow connection of the new SAFE Computer Center to the power plant. Both the Ruffing and Special Centers will be supported on the backup chiller system. 25X1 25X1 Att : a/s Approved For Release 2003/11/06 : CIA-RDP84-00933R000400180035-3 Approved or Release 2003/11/06 : CIA-RDP84-0 63R000400180035-3 UNCLASSIFIED DDA/ODP SYSTEMS AVAILABILITY SUMMARY MONDAY 09 FEB 1981 THRU SUNDAY 15 FEB 1981 SYSTEM CURRENT WEEK 09 FEB - 15 FEB PREVIOUS 90 DAYS 10 NOV - 08 FEB DIFFERENCE BATCH 96.06 97.57 - 1.51 INTERACTIVE 96.97 98.26 - 1.29 GIMS 90.30 96.78 - 6.48 CAMS 99.74 98.89 + .85 OCR-COLTS 95.30 95.05 + .25 OCR-RECON 95.44 90.18 + 5.26 DDO-STAR 97.83 97.23 + .60 OSWR-TADS 98.49 96.92 + 1.57 GIMS, OCR-COLTS, and OCR-RECON all reported a below av.arage week with each application recording outages due to hardware, software, and unresolved errors. - GIMS experienced 3 hours and 3 minutes of software problems and 1 hour and 48 minutes of hardware outages. - OCR--COLTS had 1 hour and 46 minutes of hardware errors and 35 minutes of unresolved I/O problems. - OCR.-RECON had 1 hour and 46 minutes of hardware problems and 31 minutes of software errors. Approved For Release 2003/11/06 : CIA-RDP84-00933R000400180035-3