PROCESSING WEEKLY REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP84-00933R000400150045-5
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
2
Document Creation Date:
December 9, 2016
Document Release Date:
June 15, 2001
Sequence Number:
45
Case Number:
Publication Date:
June 23, 1977
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 48.22 KB |
Body:
Approved For Release .W`1108108 : CIA-RDP84-00933R0004000045-5
STATINTL 23 June 1977
MEMORANDUM FOR: Director, ODP
Acting Deputy Director for Processing
SUBJECT Processing Weekly Report
Tasks Accomplished
1. Weekend testing of MVS/JES3 was conducted over the
past weekend. No major problems were encountered; however,
the workload was light.
2. Four additional 6250 BPI tape drives were installed
on 17 June. These were added to the pool available to users
to provide better service.
STATINTL
3. The TROLL econometric modeling package was installed
on the VM Interactive System. STATINTL
4. Release 3.0 of the Microdata Reality System
STATINTL installed on the ODP Reality computer for testing. NINON
5. The GAS daily production run book is 90% complete.
The Production Specialist plans to start on the monthly run
STATINTL books next week. GAS daily work is currently up to date.
6. removed the 8 meg core from the 168-1 on Friday.
STATINTL 1. SIS will begin stress testing MVS/JES3
prior to bring-
ing this system up.
2. GIMS Division will study the possibility of combining
GIMDEV and CAMDEV into one job. Both now use Release 4.0.
Problems
1. Power problems attributed to locally severe thunder-
storms caused power problems in both centers over the past
weekend.
Approved For Release 2001/08/08 : CIA-RDP84-00933R000400150045-5
Approved For Release 261/08/08: CIA-RDP84-00933R00040015004,tATINTL
2. The preliminary cutoff for PERSIGN is now three days
late due to program problems. The Primary Application
S
i
li
pec
a
st is working on the problem.
Approved For Release 2001/08/08 : CIA-RDP84-00933R000400150045-5