APARS STATUS REPORT JULY 1981

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP84-00933R000100130022-5
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
5
Document Creation Date: 
December 15, 2016
Document Release Date: 
November 3, 2003
Sequence Number: 
22
Case Number: 
Publication Date: 
July 1, 1981
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP84-00933R000100130022-5.pdf170.15 KB
Body: 
Approved For~ea~ ~0~/0~/0~ : ECI~FZ~dP~4~0~33~,00100130022-5 APARS STATUS REPORT July 1981 The following describes the current status of the development of the APARS system. The report is organized as follows: I. The Main System Development II. The Remote System Development III. Administrative A. Renovations B. Training C. Maintenance IV. APARS Schedule of Events I. The Main System Development During the month of June the Main system was subjected to extensive tests and was not accepted by the Office of Communications after the in-plant test. There were fifteen minor software errors that are to be corrected prior to acceptance. The system was also experiencing equipment malfunctions and was not operating satisfactorily for extended periods. ~~ Xerox requested assistance from the DEC corporation to correct the problems. The problems were identified and corrected by DEC and the system is now meeting the throughput requirements and operating for extended periods. An in-plant test is now scheduled for 27 July 1981, if the system operates as expected it will be delivered to the Agency on or about 6 August 1981. The Duplex enhancement (two-sided printing) will also be delivered at this time. 25X1 Approved For Release 2004/02/0 : CIA-RDP84-009338000100130022-5 Approved For~Je~seO2~4/~Q2/~4~ C~4 ~D~8~-OQ9~~~R,p00100130022-5 APARS STATUS REPORT - July 19.81 II. The Remote System Development The development of the Remote software is on schedule; Xerox anticipates that it will be integrated and ready for testing in mid-September. A decision was made during the month to replace the DEC PDP 11/34 CPUs in each Remote with the larger DEC PDP 11/44s. This will improve the efficiency of the system and allow for additional development. The DEC salesmen have promised delivery of two 11/49s to Xerox in July and the remaining two prior to the October delivery date, The OC programmer responsible for monitoring the Remote system has returned to California. He will stay there during the final stages of the system development and assist in the preparation of the Remote in-plant test. A decision was also made to acquire 75 bin sorters for the Remotes. One Remote is scheduled for delivery with the Main system o/a 6 August. It will be installed in the LA,Q'AF Registry. The other three Remotes will be shipped in late September. The system should be fully operational by 1 November 1981. III. Administrative A. Renovations The renovations for the consolidated registries continued during the past month. The LA~AF registry work is in the final stages; the electric power filter was installed and the "C" corridor entrance will be repaired after the machinery is installed. This roam is ready to receive the first Remote . - Approved For Release 2004/02/04: CIA-RDP84-009338000100130022-5 2 C O N F I D E N T I A L 25X1 C O N F I D E N T I A L Approved For-Tease 2004/02/04: CIA-RDP84-0093300100130022-5 APARS STATUS REPORT - July 1981 The NE/EA Registry renovation has progressed in an orderly fashion; the supervisor and machine rooms have been completed. The raised flooring and telephone work have been completed and the air handler and power filter will be installed in July. The renovations on the new EUR/SE Registry location in 5-B-02 were started ahead of the schedule. ~'he main working area and the supervisor's room have been completed. The machine room will be renovated when the room is vacated by the Central Travel Branch. The area will be vaulted in the next month, and when that is completed, the registry will be moved to the new area. The work in the CS Registry has not started as of this report but will probably be accomplished during August. New~offiee furniture was ordered this month arnd will be installed prior to the delivery of the system. B. Training The LA/Q'AF Registry hardware will be used to train IMS personnel in .the operation and maintenance of the Xerox 9700 printer. The system training provided by Xerox will take place one month prior to the delivery of the system. The Registry employees have been scheduled for a short training course by CCTS that will introduce the use of a CRT. C. Maintenance A maintenance contract has been negotiated with Xerox to maintain-the APARS system after delivery. Programmers from OC/CPS will be assisted by Xerox. for at least one year after delivery. OC has assigned, ?two full-time programmers to work on the development of sys an t ey w continue to support it after ,~ installation. Xerox will have a~service department located in the Headquarters building, with technicians on site ~J from 6 AM to 6 PM on weekdays. Weekends and holidays will be handled on a will call basis with a two hour reaction time for service. .- Approved For Release 2004/02/04: CIA-RDP84-009338000100130022-5 3 n n r1 F T n F` N T T A L C O N F I D E N T I A' Approved Fo~~elease 2004/02/04: CIA-RDP84-009000100130022-5 Iy. APARS Schedule of Events Contract Signed Review of Functional Design Specifications Review of Detailed Design Specifications Review of Site Preparation Plan Test Tape Completed Review of In-Plant Test Plan Review of System Cutover Plan Main APARS Site Preparation Complete Review of Remote Detailed Design Specification Registry Procedures Completed by PPB Factory Acceptance Tests Completed Delivery of APARS to Headquarters Delivery of Two-Sided Printing Site Preparation of Remote Sites 1st 2nd 3rd 4th Preacceptance Test for Remotes Delivery of Remotes 30 September 1979 1 November 1979 1 December 1979 1 March 1980 1 April 1980 15 April 1980 1 June 1980 1 March 1981 9 March 1981 ? 15 April 1981 30 July 1981 6 August 1981 15 August 1981 1 June 1981 1 July 1981 15 July 1981 30 August 1981 15 August 1981 1st (Hardware Only) 6 August 1981 2nd, 3rd, 4th late September 1981 On-Site Tempest Test for 1st Remote, one week 15 August 1981 (For remaining remotes two days ) Final Acceptance of Main 15 September. 1981 Training for Main 1 September 1981 Training for IMS Personnel September 1981 Factory Acceptance test far Remotes 15 September 1981 Final Acceptance of Remote 1 November 1981 Approved For Release 2004/02/04 CIA-RDP84-009338000100130022-5 C O N F I D E N T I A L STAT gpproved For Release 2004/02/04 :CIA-RDP84-009338000100130022-5 Approved For Release 2004/02/04 :CIA-RDP84-009338000100130022-5