LETTER (SANITIZED)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP84-00868R000100050155-9
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
7
Document Creation Date:
December 20, 2016
Document Release Date:
September 25, 2007
Sequence Number:
155
Case Number:
Publication Date:
August 18, 1980
Content Type:
LETTER
File:
Attachment | Size |
---|---|
CIA-RDP84-00868R000100050155-9.pdf | 283.43 KB |
Body:
Approved For Release 2007/09/25: CIA-RDP84-00868R000100050155-9
BRITISH BROADCASTING CORPORATION
MONITORING SERVICE
Reference : 07/MS/BJW
CAVERSHAM PARK READING RG4 8TZ
TELEGRAMS AND CABLES MONITOR READING TELEX
TELEX 848318 TELEPHONE 0734 472742
18 August 1980
STAT
Bureau Chief,
P.B.I.S.
Dear Paul,
ISLAMABAD - STAFF
You will be pleased to hear that the first of the seven Islamabad
monitors (a Russian) will be taken on to the BBC's strength with effect
from 1 September 1980. I will advise you the starting dates of the
remainder of these staff as they occur.
I am arranging for you to be invoiced quarterly in arrears for the
Islamabad Staff Costs. The first invoice will be presented on 1 December.
The monthly cost of each monitor-will be ?1231.20 p.m. and the Operational
Assistant ?1145.50 P.M. as per my letter of 17 July 1980.
(Barry . \Whitehal
ip
Head of A 'stration
Monitoring Service
Approved For Release 2007/09/25: CIA-RDP84-00868R000100050155-9
Approved For Release 2007/09/25: CIA-RDP84-00868R000100050155-9
? r
Copy: To All Who Attended Meeting.
BRITISH BROADCASTING CORPORATION
IV ONITORIPIG SERVICE
CAVERSHAM PARK READING RG4 8TZ
TELEGRAMS AND CABLES MONITOR READING TELEX
TELEX 848318 TELEPHONE 0734 472742
Reference : 0 7/$1S/BJ W
15 August 1980
Bureau Chief,
P.B.I.S.
Dear Paul,
ISLAMABAD - SATELLITE T.V.
Just to confirm the main points which were agreed at our meeting on the
12 August 1980.
1. ISLAMABAD
F.B.I.S. agreed that the BBC should go ahead with the new cubicle
building at Caversham. BBC Architects Department would draft a
Finance case. The cost would be fully recoverable from F.B.I.S.
The new building would contain a room for the T.V. Satellite
reception area. It was noted that a duct would need to be
provided in this room for cable from the dish.
2. T.V. DISH SITE
(i) Building Work -
BBC Architects Department would provide a project leader to
obtain three quotations for all building work in connection with
the laying of the base, providing fencing, earth mat, etc. They
would advise F.B.I.S. their recommendation on the placing of the
contract. F.B.I.S. would make a purchase order on the nominated
contractor. All subsequent invoices received after verification
by the BBC project leader would be settled by F.B.I.S. F.B.I.S.
would provide the BBC Architects Department with site plans and
full details of what was required at the T.V. Dish site.
(ii) Electrical Work
F,B.I.S., after consultation with) (would place an
order with the S.E.B. for provision of an electricity supply to
the dish site. All invoices from S.E.B. would be placed with
F.B.I.S.
(iii) ? Insurance
The BBC undertook to look into the question of Third party
Insurance-cover at the Dish site.
ip
STAT:
STAT
Approved For Release 2007/09/25: CIA-RDP84-00868R000100050155-9
Approved For Release 2007/09/25: CIA-RDP84-00868R000100050155-9
0
Reference : 074N1S/BJW
Bureau Chief,
F.B.I.S.
Dear Paul,
BRITISH BROADCASTING CORPORATION
NIONI ORING SERVICE
CAVERSHAM PARK READING RG4 8TZ
TELEGRAMS AND CABLES MONITOR READING TELEX
TELEX 848318 TELEPHONE 0734 472742
11 August 1980
ISLAMABAD - CAPITAL EXPENDITURE
Further to my letter of 17 July, I now enclose details of the Capital
costs in connection with the monitoring at Caversham of broadcasts received
in Islamabad. You will see in the plan for the new cubicles building that
there has been added additional space for possible use as the FBIS Satellite
T.V. Reception room. The total building cost is estimated at #42,500. This
price will be held until October 1980. Completion is estimated as January 1981.
To the building cost must be added #4,471 for Fixtures and Fittings, as
detailed, and 9550 for additional engineering equipment. This makes the total
estimated cost for this project #47,521.
I would be grateful for your early agreement to reimbursing us with the
actual capital expenditure on this project.
ip
(Barry'k.J; Whit hall)
Head of 'Administration
Monitoring Service
STAT
Approved For Release 2007/09/25: CIA-RDP84-00868R000100050155-9
Approved For Release 2007/09/25: CIA-RDP84-00868R000100050155-9
?
ISLAMABAD - CAPITAL EXPENDITURE
1. New Cubicles Building (as per enclosed drawing) 042500
2. Fittings & Fixtures:
Floor Coverings, 450 Carpet tiles
E1.70 per tile 765
Typewriters, 8 machines @
0144 each 1152
Furniture, 8 Typist chairs
@ E45 each = 0360
8 S.B. chairs
?17.50 each = #140
4 Revolve chairs
@ E49 each = ?196
2 E.A. chairs
033 each = ?66
8 Typist tables
053 each = X24
4 Tables 52
@ ?28 each = #112
10 Filing cabinets
@ C53 each = 0530
10 Stationery cabinets
C 914 each = 9,140
3 Steel cupboards
C60 each = 0180
Rising costs ? 10%
2148
406
3. Engineering Equipment:
To include Telephones,
Control Units, etc.
550
Total 47521
Approved For Release 2007/09/25: CIA-RDP84-00868R000100050155-9
Approved For Release 2007/09/25: CIA-RDP84-00868R000100050155-9
BRITISH BROADCASTING CORPORATION
KA() Nt i 01 f:BtN!G S'.=Td'.;!i:c
CAVERSHAM PARK READING RG4 8TZ
TELEGRAMS AND CABLES MONITOR READING TELEX
TELEX 848318 TELEPHONE 0734 472742
Reference : 07mS/BJW
Bureau Chief,
F.B.I.S.
Dear Paul,
17 July 1980
Islamabad Remote - Recurrent expenditure - Staff costs
I attach details-of the staff costs for the Islamabad Remote monitoring
operation.
You will see that the total staff costs are #97,639. To this figure
must be added a 20'% overheads charge making a grand total of f1l,166 p.a.
The 20% overheads charge includes the following; power, light, heat, canteen,
and facilities. Allowances on appointment include kit, baggage, legal costs,
separation allowances, etc. Since we are now in a position to go ahead with
recruitment, I would be grateful for your early agreement to the above charge to be made on FBIS for the first year's staff costs. I have estimated the
costs from 1 October to 30 September but it is likely that some monitors could
well be recruited before 1 October in which case there would be a proportional
monthly charge. When I have your agreement, we can discuss the method of
invoicing.
I hope to be able to advise you what will be the likely figure for capital
expenditure including refurbishing costs of the operational areas, necessary
fixtures and fittings (typewriters, etc) and the small amount of technical
equipment not being purchased by FBIS within a couple of weeks.
Yo rs sincerely,
iJ!
(Barry J. Whitehall)
Head of Administration
Monitoring Service
ip
Approved For Release 2007/09/25: CIA-RDP84-00868R000100050155-9
? Approved For Release 2007/09/25: CIA-RDP84-00868R000100050155-9
r ISLAMABAD REMOTE
ESTIMATE OF STAFF COSTS GRADE
2 Afghan Monitors 3K5
2 Russian Monitors 3K5
3 Russian Regional Monitors 3K5
1 Operational Assistant 2R5
1. Cost of 1 Monitor October 1980 - September 1981.
Basic Pay #7395
Pension 1693
State Insurance 750
#9838
- -7/66 Grading lift
Basic Pay 518
Pension 119
#10475
Assume 10'% 1.4.81 Review
Basic Pay 792
Pension 182
State Insurance 70
#1044 per annum
i year = F, 522
TOTAL PAY #11027
B. ALLOWANCES
Continuing All. MPA1 # 419-
Non. Cont. All. 600
T&DE. Newspapers, etc. 206
6 month increase in Allowances
following 100 1.4.81 review 60
Total Allowance #1285
GRAND TOTAL #12,312
Approved For Release 2007/09/25: CIA-RDP84-00868R000100050155-9
Approved For Release 2007/09/25: CIA-RDP84-00868R000100050155-9
?
!
2.
Cost of 1 Operational Assistant October 1980 - September 1981
Basic Pay
F5945
Pension
1361
State Insurance
595
07901
16. 2% Grading Lift
Basic Pay
964
Pension
307
09172
Assume 10'% 1.4.81 Review
Basic Pay
690
Pension
167
- State Insurance
50
0907 per annum
.'. j year =
#454
TOTAL PAY
#9626
B.
ALLOWANCES
Shift Allowance @ 10%
# 691
Non-Continuing Allowance
1050
6 month increase on
Allowances following 10'%
1.4.81 Review
88
Total Allowances
E1829
GRAND TOTAL
(11455
Total Staff Costs
7 Monitors @ 012.312
086184
1 Op.Asst. @ #11.454
11454
#97639
Approved For Release 2007/09/25: CIA-RDP84-00868R000100050155-9