REPORT OF CABLE SECRETARIAT OPERATIONS 1 - 31 JULY 1966

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP84-00499R000600020068-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 9, 2016
Document Release Date: 
July 17, 2001
Sequence Number: 
68
Case Number: 
Publication Date: 
August 4, 1966
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP84-00499R000600020068-5.pdf114.5 KB
Body: 
Approved For Release 2001/08/01 : CIA-RDP84-00499R000600020068-5 4 August 1966 MEMOR"DUM FOR: Executive Director-Comptroller SUBJECT : Report of Cable Secretariat Operations 1-31 July 19# 1. Cables Processed a. The combined work wits of CIA and non-CIA cables totaled 53, 630 item s broken down as follows; CIA IN CIA OUT Miscellaneous (Including Archieves, 720) Non-CIA Units Total Work exits 13,691 7.598 4,552 b. CIA IN and OUT cables totaled 197.634 for the period January-July 1966, down 4% compared to the same period in 1965 (206, 409) and 9% more than the base period 1963 (181, 33$). a. Non-CIA cables for January-July 1966 totaled 147, 597, an increase of 26% over the same period in 1965 (132.495) and 60% more than the base period 1963 (104, 656). d, Work units totaled 400,923 for January-July 1966 w}xich is 8% more than the same period 1965 (372,194) and an increase of 2 (319,410) over the base period of 1963. Our Monday-Friday average for July as 2.015 items with an average of 1, 730 items completed each 24 hours including rdeys and Sundays. e. 1,277 cables or Z. 5% of all cables processed were forwarded to the Director as compared to 1, 416 or 2.59 for June 1966. During the month we lost one person and gained none, reducing our on- duty strength to persons, eight short of our T T /O of 25X1A 25X1A Approved For Release 2001/08/01 : CA 84-00499R000600020068-5 Approved For Release 2001/08/01 : CIA- as we started on a pro ram designed. to clear out from or cryptic reference file cryptonyme which we believe are obsolete. This to a piece-meal approach ased what I. needed to a system which starts with the office having control over the cryptonym infor. iuS as when the crypt"yra is zo lower to use. We will try to devise each a program with LDP. b. We have reached a decision to use a Xerox 2400 and a 72# in lieu wont three Xerox 914s, In so doing, we will, I believe. sd to +ce-gsnsate for shortage of people and speed in processing .. th Xerox may be slightly more than for offset printing, but for our purposes +cablee of one page and 20 copies or less. The cost of making copies o improve our capability to process messages quickly, particularly Nora--CIA `or publication rally coordinated and aonrol-ed reviaicins at~ On 24 July after more than two years of drafting and coordinating afting and "coordinating, we sent to the I)1)S Regulations Control The revisions include all a the recent policy and procedural changes rec mended by the Coffey committee as well as the changes necessitated by 25X1 A I . 7 change Organisational Cryptonyms. 25X1A 25X1A Cable : scretary Approved For Release 2001/08/01 : CIA-RDP84-00499R000600020068-5