PETROLEUM REFINERY UNDER CONSTRUCTION SIHANOUKVILLE, CAMBODIA 10-42N 103-33E

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP83-01074R000100020001-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
September 12, 2011
Sequence Number: 
1
Case Number: 
Publication Date: 
April 3, 1968
Content Type: 
MISC
File: 
AttachmentSize
PDF icon CIA-RDP83-01074R000100020001-7.pdf233.21 KB
Body: 
Sanitized Copy Approved for Release 2011/09/12 : CIA-RDP83-01074R000100020001-7 nMlIUMAL rnuluun rnl4 Im uRLIRllun 4LMILn PETROLEUM REFINERY UNDER CONSTRUCTION SIHANOUKVILLE, CAMBODIA 1f-49N 10'1_TIF '?. Sanitized Copy Approved for Release 2011/09/12 : CIA-RDP83-01074R000100020001-7 PETROLEUM REFINERY UNDER CONSTRUCTION SIHANOUKVILLE, CAMBODIA 1042N 10333E ATTACHMENT TO N-0032 25X1 03 APRIL 1968 PAGE 1 Sanitized Copy Approved for Release 2011/09/12 : CIA-RDP83-01074R000100020001-7 (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER SECRET NO FOREIGN DISSEM 1. SIGNIFICANCE: THIS BRIEFING BOARD DEPICTS THE PETROLEUM REFINERY UNDER CONSTRUCTION NORTH OF SIHANOUKVILLE. 2. LOCATION: THE REFINERY IS LOCATED ON THE POINTE DU DEPARTE AT 10-42-50N 103-33-07E, SIX NM NORTH-NORTHEAST OF SIHANOUKVILLE. 3. BACKGROUND: IN 1964 THE CAMBODIAN GOVERNMENT SIGNED A PROTOCOL AGREEMENT WITH THE FRENCH REGIE AUITONOME DES PETROLES (RAP) FOR THE CONSTRUC- TION BY 1967 OF AN OIL REFINERY OF 530,000 METRIC TONS CAPACITY AT SIHANOUKVILLE. THE KOPPERS FRANCE, LTD. WAS AWARDED THE CONSTRUCTION CONTRACT. THE PLANT WILL ESSENTIALLY BE A DISTILLATION UNIT CAPABLE OF PRODUCING MOTOR GASOLINE, KEROSENE, GAS, OIL AND DIESEL OIL. CAMBODIA'S DEMAND FOR POL IS RISING VERY SLOWLY AND THE REFINERY WILL, THEREFORE, PROBABLY NOT REACH OPTIMUM PRODUCTION BEFORE 1972. CRUDE OIL WILL BE IMPORTED FROM IRAN AND FEEDSTOCKS PROBABLY FROM These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. CROUP I E.c laded Ir. 11111-1 NO FOREIGN DISSEM Sanitized Copy Approved for Release 2011/09/12 : CIA-RDP83-01074R000100020001-7 SECRET Sanitized Copy Approved for Release 2011/09/12 : CIA-RDP83-01074R000100020001-7 SECRET NO FOREIGN DISSEM (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER ATTACHMENT TO N_0032 03 APRIL 1968 PAGE 2 4. COLLATERAL: THE REFINERY IS BEING CONSTRUCTED ON THE COAST ON A TRIANGULAR SITE WHICH BORDERS THE PHNOM PENH-SIHANOUKVILLE RAILWAY ON THE SOUTHEAST AND THE SEA ON THE NORTH AND THE WEST. THE REFINERY BASICALLY CONSISTS OF A DISTILLATION COLUMN AND A CATALYTIC REFORMER AS WELL AS STORAGE TANKS AND THE NECESSARY EQUIP- MENT FOR SUPPLYING UTILITIES SUCH AS ELECTRICITY, STEAM AND WATER. IT WILL BE CAPABLE OF TREATING CRUDE OIL OF DIFFERENT COMPOSITIONS AND ORIGINS, BUT IT WOULD BE MORE ADVANTAGEOUSLY USED TO TREAT CRUDES WITH CHARACTERISTICS THAT WILL RESPOND BEST TO THE NEEDS OF THE LOCAL MARKET. AS SOON AS THE REFINERY STARTS PRODUCTION, IT WILL BE ABLE TO COVER THE COMPLETE NEEDS OF THE HOME MARKET FOR PRINCIPAL OIL PRODUCTS: GASOLINE, KEROSENE, JET FUEL, GAS-OIL, DIESEL OIL AND FUEL OIL. IT WILL ALSO BE POSSIBLE TO PRODUCE HIGH-OCTANE GASOLINE AND BY- PRODUCTS WHICH WILL HAVE NO IMMEDIATE COMMERCIAL APPLICATIONS. NEW INDUSTRIES COULD BE ESTABLISHED AT A LATER DATE TO PROFITABLY UTILIZE THESE BY-PRODUCTS. AT A MUCH LATER PERIOD AND AFTER ADDITIONAL INVEST- MENTS THE REFINERY SHOULD BE ABLE TO DELIVER BOTTLED LIQUID GAS AND SECRET Sanitized Copy Approved for Release 2011/09/12 : CIA-RDP83-01074R000100020001-7 DO~ I02 FEBRUARY 1968 (CONFIDENTIAL). These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. GROUP I U.cLd.d I..m o dq~nq..dinq q.'d d.c l.cc~f~c.~~gn Sanitized Copy Approved for Release 2011/09/12 : CIA-RDP83-01074R000100020001-7 SECRET NO FOREIGN DISSEM (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER e MISSION READOUT: REVEALS THE INSTALLA- TION TO BE APPROXIMATELY FIVE PERCENT COMPLETE. THE TWO AREAS OBSERVED ARE A RECEIVING AREA UNDER CONSTRUCTION CONTAINING TEN STORAGE/SUPPORT BUILDINGS AND EXTENSIVE OPEN STORAGE AND THREE ASSOCIATED POL STORAGE AREAS ENCLOSED BY RETAINING WALLS. REVEALS FIVE AREAS AT THE INSTALLA- TION: (1) A RECEIVING AREA UNDER CONSTRUCTION CONTAINING 14 WOOD FRAME BUILDINGS (THREE UNDER CONSTRUCTION) AND ONE OIL BUNKERING PIER UNDER CONSTRUCTION. (2) A CRUDE OIL STORAGE AREA ENCLOSED BY A RETAINING WALL CONTAINING THREE PROBABLE STORAGE TANKS UNDER CON- STRUCTION WITH APPROXIMATELY 160 FT DIAMETER FOUNDATIONS, (3) A POSSIBLE DISTILLATION AREA CONTAINING FOUR WOOD FRAME BUILDINGS (ONE UNDER CONSTRUCTION) AND EXTENSIVE OPEN STORAGE. (4) A POSSIBLE BLENDING AREA ENCLOSED BY A RETAINING WALL CONTAINING ONE LARGE STORAGE TANK UNDER CONSTRUCTION, TWO MEDIUM STORAGE TANKS IN A LATE STAGE OF CONSTRUCTION, SIX WOOD FRAME CONSTRUCTION BUILDINGS AND ONE UNIDENTIFIED BUILDING OUTSIDE THE RETAINING WALL. (5) A POL BY- PRODUCTS STORAGE AREA UNDER CONSTRUCTION ENCLOSED BY A RETAINING WALL CONTAINING FOUR LARGE TANK FOUNDATIONS, ONE MEDIUM TANK NEAR COMPLETION, These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. GROUP I E.c laded from e~~omo~~c de.nvredi~v end de