OPERATIONAL AND OCCUPATIONAL SAFETY IMPROVEMENTS, PRINTING AND PHOTOGRAPHY BUILDING, HEADQUARTERS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP83-00957R000100050002-1
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
2
Document Creation Date: 
December 14, 2016
Document Release Date: 
April 7, 2003
Sequence Number: 
2
Case Number: 
Publication Date: 
December 8, 1980
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP83-00957R000100050002-1.pdf115.3 KB
Body: 
Approved For Release 2003/05/23 : CIA-RDP83-00957R000100050002-1 3 "1 1980 MEMORANDUM FOR: Director of Finance VIA: Chief, Logistics and Procurement Law Division, OGC PROK: James H. McDonald Director of Logistics SUBJLCT: Operational and Occupational Safety Improvements, Printing and Photography Building, Headquarters REFERENCE: Memo to ADDA from D/L,- dtd 9 Aug 1977, Subj: Unfunded FY 1977 Requirements (OL 7 3539) 1. In 1977, a project was begun to upgrade both the operational and the personnel safety and health environ- ments in the Printing and Photography Building. The require- ments for this undertaking came from two directions. The operational requirements wore a result of increased customer demand for the use of color presentations. These demands resulted in the addition of more modern processing equipment as well as in the need to install the equipment in new locations to gain maximum production efficiency. 2. The requirements for occupational safety were the result of an industrial hygiene survey accomplished throuprh a contract with The more critic a imp emen t e on a priority basis and are now complete. The long-range recom- mendations to improve the overall ventilation in the building were more extensive and could be best implemented in concert with the operational renovations which also involved significant ventilation system alterations. I/ ST AT $325,000 was provided in August 197.7. While the__basic_intent of the project had been established, the details of the actual design and construction are not sufficiently complete to provide a firm fixed price by th . Approved For Release 2003/05/23 : CIA-RDP83-00957R000100050002-1 OL 0 5395 Approved For Release 2003/05/23 : CIA-RDP83-00957R000100050002-1 SUBJECT: Operational and Occupational Safety Improvements, Printing and Photography Building, Headquarters ST 5. The original requirements for alterations have not changed during the past three years that the GSA has been working on the project. However, the planned cost of the project has inflated significantly, increasing from the 325,000 range in 1977 to a firm 1981 cost of $595,000 includ- ing the various costs for design, construction, and contract administration. 6. It is requested that additional FY 77 funds in the amount of $270,000 be made ayai i nhi n t?n -1- 2, s-',n 1%, rssa.s+..sn - Is/ Jczrlej X McDonald James if. McDonald, Distribution: Orig - Addressee 1 - OL/RECD Official 1 - OL/RECD Chrono I - D/L Chrono 9!- - OL Files OL/RECD/Cd (5 Dec 80) Approved For Release 2003/05/23 : CIA-RDP83-00957R000100050002-1 2