PHOTOGRAPHS OF VESSELS AND INSTALLATIONS OF GDYNIA HARBOR

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP83-00418R001700300003-3
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 27, 2016
Document Release Date: 
July 8, 2013
Sequence Number: 
3
Case Number: 
Publication Date: 
November 17, 1955
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP83-00418R001700300003-3.pdf107.23 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/07/08: CIA-RDP83-00418R001700300003-3 CENTRAL INTELLIGENCE AGENCY REPORT WANTRY itMeJECT PLACE ACQUIRED DATE OF INFO. OWORMATION REPORT CD NO. Poland P1QtOgrap1i3 of Vessels and Installations e Gdynia flarbor DATEDIall. NO. OF PAGES NQ OF SU PP LENIENT TO REPORT WI 50X1 er 1955 50X1 50X1 Thl C ENT CONTAINS INFORMATION AFFECTING THE NATIONAL DEFENSE tamp TATT yriltpri THE DIONITIG 91 TITLE 18. SECTIQUS 783 194. OF Tlig u.j &LJUNDD IT3INft133toN QR REVEL. .01' ITS rCiNTE/ITS TO ge8 RECEIPT HY AN UNAUTHORIZED PERSON Y _yr ID T1 T I P I THIS IS UNEVALUATED INFORMATION 50X1 50X1 50X1 50X1 50X1 50X1 LI ii 50X1 50X1 Harbor Basin X Harbor Basin IX 3 Harbor Basin IX 4 6 .'50X1 50X1 Harbor Basin It Harbor Basin IX Polish fera sip NOPERNIX to the left Of the center of the picture* The conning ' towers of at least two submarines are vaguely discernible at the extreme left. A salvage vessel is visible at the extreme right and, to the left of it, the structure of a steam pile-driver or a floati4g aren't! 'IP the ].eft 11nti oat a Email ft of it the ad tbul Uhind t installattome elee in the background the radio At the extreme ight DAR POMORZA, to the left of it ZETEMP0WW and Landing craft BDD 1 is visible on the left-hand side submarine and destroyer are visible at the inner edge of the outer mole of Harbor Basin It station. and Landing craft BDD1 destroyers submarine are visible. The two destroyers are viaila Lb marine 50X1 Construction At the extreme left the JASTARNI,(ex harbor of Harbor (SEED Q). to the right of her the two Basin VI floating docks, behind the floating crane to the right of the large docksthe shipbuildinL; ? Installation. To the right4of the shipbuilding installation savers. nil* MOW vraParill are 50X1 #104440401 ITMORTI TI I Declassified in Part - Sanitized Copy ?Approved for Release @ 50-Yr 2013/07/08 : CIA-RDP83-00418R001700300003-3 50X1 , Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/08: CIA-RDP83-00418R001700300003-3 50X1 7 SECRET - NOFORN 50X1 Construction haftor of Harbor Basin VI visible, and on the spit in front of them a watch tower. At the extreme right a shipyard building, in the foreground the watch tower, behind it the completed steam trawlers, to the left of them the shipbuilding installation and the floating crane, SZO ORN 50X1 50X1 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/08: CIA-RDP83-00418R001700300003-3