MONTHLY REPORT -- PANAMA BUREAU -- JULY 1981

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP83-00385R000200110011-7
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
3
Document Creation Date: 
December 20, 2016
Document Release Date: 
May 8, 2007
Sequence Number: 
11
Case Number: 
Publication Date: 
August 7, 1981
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP83-00385R000200110011-7.pdf110.73 KB
Body: 
Approved For Release 2007/05/08: CIA-RDP83-00385R000200110011-7 ? ? FOREIGN BROADCAST INFORMATION SERVICE PANAMA BUREAU DRAWER 927 APO MIAMI 34004 7 August 1981 MPA #1030 MEMORANDUM FOR: Director, FBIS THROUGH : Chief, Operations Group SUBJECT : Monthly Report -- Panama Bureau -- July 1981 The disappearance on Friday, 31 July, of the plane transporting Gen Omar Torrijos, Panama's strong man and commander of the National Guard, prompted an urgent call early the next day from the office of the CINC, USSOUTHCOM, asking the bureau to maintain an open watch on Panamanian transmitters and to report the media's treatment of the disappearance and subsequent developments. The first official announcement that the general's plane was missing was picked up just after noontime on Saturday, and a little more than an hour later the bu- reau monitored the first confirmed report that the plane had crashed and that there were no survivors. This was phoned immediately to the special task force set up by USSOUTHCOM to monitor the developing situation and to the embassy. The bureau's open watch was maintained throughout the weekend period to report media reaction and the events surrounding the initially tense political situa- tion. On Monday, expressions of appreciation for the bureau's weekend coverage were phoned in to the bureau chief from the embassy and USSOUTHCOM. The FBIS Wire had advised the bureau that the initial report confirming Torrijos' death had generated a CRITIC message. A. Monitorial/Editorial 1. Line problems dogged the bureau's remote monitoring system through- out the month, leading to occasional gaps or delays in reception of programs. As the month ended, Nicaraguan and Guatemalan receivers could be tuned and mo- nitored remotely, but the San Salvador receiver could not be tuned and San Sal- vador coverage depended heavily on phone feeds. Approved For Release 2007/05/08: CIA-RDP83-00385R000200110011-7 9 ? 2. Local line problems also interrupted the bureau's LATIN and ACAN-EFE services periodically throughout the month. By the end of the month, ACAN recep- tion had improved after replacement of a poor-quality landline, and LATIN's trou- bles were momentarily quiet, apparently due to repairs in the New York transmitter. 3. Despite these reception problems, the bureau continued to have a heavy processing backlog, with one monitor on extended sick leave, a new monitor in training, and a third on TDY at Key West. Extensive overtime was being used to keep the backlog under control. A. Personnel 1. I larrived on PCS 8 July to fill the additi(Si ,T editorial slot authorized by Headquarters. 2. I lentered on duty 13 July to fill an-exisT monitorial vacancy. The bureau was also authorized to add two additional-moni- torial positionsto its T/0 and an intensive recruitment campaign is under way to fill them. 3. The bureau chief, accompanied by the bureau chief-designate, trav- eled 14-18 July to Managua, Tegucigalpa, Guatemala, and San Salvador to inspect the stations of the bureau's Central American remote monitoring network and to meet embassy officers. B. Building and Grounds In compliance with the recommendation of the Safety Officer following his recent inspection visit, a number of additional AC outlets were installed in the operations building to replace existing extension cords. analyst, J-2, USSOUTHCOM, on 8 July. STAT 2. A two-man audit team from Headquarters 20-22 July to conduct an audit of the bureau's property and records. 3. Sergeant MacDonald, NCOIC, and Sergeant Vozel, in charge of maintenance, Approved For Release 2007/05/08: CIA-RDP83-00385R000200110011-7 Approved For Release 2007/05/08: CIA-RDP83-00385R000200110011-7 ? Plans and Operations Division, U.S. Army Communications Center, on 29 July. S7 Attachments: Monthly Production Report Operations Attachment Engineering Attachment Publications Coverage Report Coverage Schedule cc: Chief, Paraguay Bureau Chief, Key West Bureau Chief, Panama Bureau, FBIS Approved For Release 2007/05/08: CIA-RDP83-00385R000200110011-7