REQUEST FOR SUPPORT - REMOTE LOCATION OF VACUUM PUMPS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82T00285R000100170013-3
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
3
Document Creation Date: 
December 12, 2016
Document Release Date: 
June 19, 2002
Sequence Number: 
13
Case Number: 
Publication Date: 
February 13, 1978
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP82T00285R000100170013-3.pdf132.3 KB
Body: 
Approved For Rele OOID0170013-3 OIA-14/78 13. February 1978 MEMORANDUM FOR: Chief, Support Staff, NPIC STAT INTL ATTENTION :1 Logistics Branch, SS/NPIC SUBJECT : Request for Support - Remote Location of Vacuum Pumps 1. OIA expects delivery of a new comparator about March 15, 1978. A key component of this comparator is a small pump which generates vacuum for the film hold-down?system. While every effort has been made to insulate and isolate, the noise generated by this pump, the noise level remains unacceptable for normal office conditions. Thus, this pump must be installed emote location, outside any occupied STA INTL office spaces in STATINTL 2. has been the subject of considerable discussion STA INTL between OIA `s photo ranunetri st and of the Logistics ranc , SS/NPIC. have ATINTL STATINTL limmediately adjacent to the east wall of STATINTL 3. The installation of the pump will require running a one inch diameter vacuum line of a rigid material (either hard copper or PVC pipe) from the pump site to the comparator located in Room 3N180 (see floor plan, Attachment 1). An electrical conduit running parallel to the vacuum line will be required to carry the necessary wiring to monitor and control the pump from the comparator console. A 220V service will be required at the pump location. 4. The path that the vacuum and control lines would take from the pump to the comparator seems to be un-obstructed. The lines would leave the comparator and run through the ceiling space from Room 3N180 to the STA INTL east wall of They would then ass through the wall and STATINTL run straight down a in erior wall of Ito the ground level pump location (see Attachment 2). 5. We realize that we are giving you rather short notice on this problem. We first became aware of the need to remotely locate this vacuum pump during the pre-acceptance tests conducted at the contractors facility during the week of 30 January-4 February. The film hold-down system on the comparator was redesigned, which required a higher capacity vacuum pump than originally planned--with the higher capacity pump came the noise pollution problem. .,We expect delivery of the comparator on 15 March, with acceptance testing scheduled for the week of 20 March--we would greatly appreciate it if the vacuum and control conduit lines could be available by 20 March. iY Approved For Release 2002/08/14: CIA-RDP82T00285R000100170013-3 Approved For Rel a 2002/08/14: CIA-RDP82T00285R0OQA00170013-3 OIA-14/78 STATINTL STA INTL it STATINTL SUBJECT: Request for. Support =Remote Location of Vacuum pumps 6. On a separate, but related problem--as you may know, OIA now has one comparator in use with a vacuum pump (of a smaller capacity) remotely located in an interior hallway. Although this pump is smaller and considerably quieter than. the large pump discussed above, it gen- erates an objectionable noise the hallway and adjacent offices. Relocation of this pump to ould be highly desirable, and It appears that this could a one in conjunction with the installation of the new pump at only a small increase in cost. Both pumps are physically small and it appears feasible to use shelving to install one above the other so that no additional floor space would be needed in Unfortunately the comparator designs dictate the use of indepen- en solated vacuum sources,,so that use of a single large vacuum pump for both comparators is not possible. The second pump will require a separate vacuum line and control conduit running parallel to those installed for the larger pump discussed in paragraphs 3 and 4 above. The smaller pump also requires a 110V service at the pump location. If you agree on the feasibility of collocating these two vacuum pumps, please include the relocation of our present pump in the work orders for Installation of the new pump. 7, assistance and your support in the solution of these problems, particularly in view of the rapid response required, is greatly appreciated. STATINTL Deputy irec o Imagery Analysis Attachments: As stated 9 ew Approved For Release 2002/08/14: CIA-RDP82T00285R000100170013-3 25X1A Approved For Release 2002/08/14: CIA-RDP82T00285R000100170013-3 Next 1 Page(s) In Document Exempt Approved For Release 2002/08/14: CIA-RDP82T00285R000100170013-3