SHIP CONSTRUCTION AND REPAIR AT ROSTOCK

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R016000390007-9
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 19, 2016
Document Release Date: 
February 7, 2006
Sequence Number: 
7
Case Number: 
Publication Date: 
January 23, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R016000390007-9.pdf81.96 KB
Body: 
Approved For Release 2006/03/03 : CIA-RDP82-00457RO16000390007-9 FO NO. 51- AAA F?1952 CLASSIFICATION SECRET/CONTROL--U.S. OFFICIALS ONLY SECURITY INFORMATION INFORMATION REPORT REPORT COUNTRY East Germany SUBJECT Ship Construction and Repair at Rostock DATE OF 25X1 INFO. PLACE ACQUIRED DATE DISTR. 23 January 1953 NO. OF PAGES 1 NCLS. OW) rrrri Y ljv; DO NOT M ENT TO '~~ C~RCULATE REPORT NO. THIS DOCUMENT CONTAINS INFORMATION AFFECTING THE NATIONAL DEFENSE OF THE UN DIED STATES, WITHIN THE MEANING OF TITLE 18, SECTIONS 793 LATION OF ITS CONTENTS TO OR RECEIPT BY AN UNAUTHORIZED PERSON IS PROHIBITED BY LAW. THE REPRODUCTION OF THIS FORM IS PROHIBITED. 25X1 25X1 25X1 25X1 THIS IS UNEVALUATED INFORMATION 1. 1ft . No. I program of the Neptun, shipyard at Rostock for the year 1953 is. to be -.he building of three fast escort vessels of 2,200 tons, Brt. The construction plans have not yet reached the yard 2. Of the current construction program, drifter is completed and lying 25X1 at the yard.; is taking its test map 2 left the wa s on 25X1 27 October 19 on 29 October 1 . are 25X1 equipped with 300 hp. Diesel engines. ;3. The. KOLOMNAS first of the 39000 ton freighters, is 71 percent completed. The engines were to be hoisted aboard on l. November 1952, but it seems not to have been done. The LUGA the second freighter, is 32 percent completed. The third freighter'is still on the ways; it is 25 percent completed. According to the latest reports only five freighters and three salvage ships will be buil',,here, besides the escort vessels. The submarine program is postponed for the present.. The motor boat has come in for general overhaul. The Seepolizei coastguard boats are lying at the, yard, waiting for new third engines0 The motorboat he fastest one. in the Baltic, made 19 knots after the installation of a new turbine. CLASSIFICATION SECT/CONTROL--U.S. OFFICIALS ONLY X