SHIP CONSTRUCTION AND REPAIR AT ROSTOCK

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R016000390006-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 19, 2016
Document Release Date: 
February 7, 2006
Sequence Number: 
6
Case Number: 
Publication Date: 
January 23, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R016000390006-0.pdf85.52 KB
Body: 
FEB 1952 51-4AA LATION OF ITS CONTENTS TO OR RECEIPT BY AN UNAUTHORIZED PERSON ISI PROHIBITED BY LAW. THE REPRODUCTION OF THIS FORM IS PROHIBITED.I OF THE UNITED STATES, WITHIN THE MEANING OP TITLE 18, SECTIONS 793 AND 794, OF THE. U.S. CODE, AS AMENDED. ITS TRANSMISSION OR REVE COUNTRY East Germany SUBJECT' Ship Construction and Repair at Rostock DATE OF INFO. PLACE ACQUIRED CLASSIFICATION SECRET/CONT OL--u?S. OFFICIALS ONLY SECURITY INFOORMATION FORMATION REPORT REPORT COPY NO. rERP DATE DISTR. 23 January 1953 NO. OF PAGES , SUPPLEMENT TO REPORT NO. THIS IS UNEVALUATED INFORMATION 1. The last, of the drifters has left the ways at the Neptun shipyard.' launching -slip No. 1 will be altered from three runways to two (for Coast Guard. tenders). Work LOU the freighters goes slowly. Percentagewise ccpiparison between program and actual positiono a. b. a. 25X1 25X1 18 3 32 6 3 Work on the shi is about - 25X1 P fit percent finished. The T 71:8. has. wt had. a trial run because- the texrbine installed is badly defective'. The M-boats have come in for repairs. - Beyond lies a vessel, the CWNI A_ It contains replacement pa?ts., - 7be freighter *NOLOA* has received four 14+0 hp steam engines with coupled generators with. a_ steam pressure of 1?5 atmospheres, to generate current and power for the hoists. The floating crane. has . two 400 hp engines; also a 100 hp and a 20 hp engine. It has two screws. The Soviet Navy depot ;ship I arrived on 8 November 1952 for repair&. The Seepolizei vessels E have had their three engines removed and replaced with two engines. Approved For Release 2006/03/03 : CIA-RDP82-00457RO16000390006-0 Freighter * 10M , should be 94+ percent; is 78 percent.. -Freighter f till on -a-mg X& Freighter The vessel accepted.. CLASSIFICATION finished its. trial run on 12 November 1952. The turbine is not yet SECRET/C019TROL,-U.S. OFFICIALS ONLY I - It- - - 1. - - - -1-- -= H AIR X F O [A ~R X Li - 0-1-1- n . pla P ni DO NOT CIRCULATE