SHIP CONSTRUCTION AND REPAIR AT ROSTOCK
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R016000390006-0
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 19, 2016
Document Release Date:
February 7, 2006
Sequence Number:
6
Case Number:
Publication Date:
January 23, 1953
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP82-00457R016000390006-0.pdf | 85.52 KB |
Body:
FEB 1952 51-4AA
LATION OF ITS CONTENTS TO OR RECEIPT BY AN UNAUTHORIZED PERSON ISI
PROHIBITED BY LAW. THE REPRODUCTION OF THIS FORM IS PROHIBITED.I
OF THE UNITED STATES, WITHIN THE MEANING OP TITLE 18, SECTIONS 793
AND 794, OF THE. U.S. CODE, AS AMENDED. ITS TRANSMISSION OR REVE
COUNTRY East Germany
SUBJECT' Ship Construction and Repair at Rostock
DATE OF
INFO.
PLACE
ACQUIRED
CLASSIFICATION SECRET/CONT OL--u?S. OFFICIALS ONLY
SECURITY INFOORMATION
FORMATION REPORT REPORT
COPY NO.
rERP
DATE DISTR. 23 January 1953
NO. OF PAGES ,
SUPPLEMENT TO
REPORT NO.
THIS IS UNEVALUATED INFORMATION
1.
The last, of the drifters has left the ways at the Neptun shipyard.' launching
-slip No. 1 will be altered from three runways to two (for Coast Guard. tenders).
Work LOU the freighters goes slowly. Percentagewise ccpiparison between program
and actual positiono
a.
b.
a.
25X1
25X1
18 3 32
6 3
Work on the shi is about - 25X1
P fit percent finished. The T 71:8. has. wt had. a
trial run because- the texrbine installed is badly defective'. The M-boats
have come in for repairs. - Beyond lies a vessel, the CWNI A_
It contains replacement pa?ts., -
7be freighter *NOLOA* has received four 14+0 hp steam engines with coupled
generators with. a_ steam pressure of 1?5 atmospheres, to generate current and
power for the hoists.
The floating crane. has . two 400 hp engines; also a 100 hp and a 20 hp engine. It
has two screws.
The Soviet Navy depot ;ship I arrived on 8 November 1952 for repair&.
The Seepolizei vessels E have had their three engines removed
and replaced with two engines.
Approved For Release 2006/03/03 : CIA-RDP82-00457RO16000390006-0
Freighter * 10M , should be 94+ percent; is 78 percent..
-Freighter f till on
-a-mg X&
Freighter
The vessel
accepted..
CLASSIFICATION
finished its. trial run on 12 November 1952. The turbine is not yet
SECRET/C019TROL,-U.S. OFFICIALS ONLY
I - It- - - 1. - - - -1-- -= H
AIR X F O
[A ~R X Li - 0-1-1- n . pla P ni
DO NOT CIRCULATE