DEVELOPMENT OF RADAR AT RFT FUNKWERK KOEPENICK VEB

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R015300120009-4
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
January 12, 2011
Sequence Number: 
9
Case Number: 
Publication Date: 
January 13, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R015300120009-4.pdf99.57 KB
Body: 
. Sanitized Copy Approved for Release 2011/01/12 : CIA-RDP82-00457RO15300120009-4 rums eu. 51-~{AA FEB 1952 CLASSIFICATION SECRET/CONTROL-U.S. OFFICIALS ONLY SECURITY INFORMATION SECRET/CONTROL-U.S. OFFICIALS ONLY NO. COUNTRY East Germany VO NOT C!RCULA E- '~ DATE DISTR. 13 January 1953 CI IR ICCT D vel...,m f Ra RFT s..,,,7..,_ 1_ v__.__ e PAGES e en o er ni 2 ar a VEB NO OF DATE OF INFO. PLACE ACQUIRE THIS DOCUMENT CONTAINS INFORMATION AFFECTING THE NATIONAL DEFENSE OF THE UNITED STATES, WITHIN THE MEANING OF TITLE 18, SECTIONS 793 AND 794, OF THE U.S. CODE, AS AMENDED. ITS TRANSMISSION OR REVE- LATION OF ITS CONTENTS TO OR RECEIPT BY AN UNAUTHORIZED PERSON IS PROHIBITED BY LAW. THE REPRODUCTION OF THIS FORM IS PROHIBITED.. 1. Antenna part Discussions concerning the construction of the hollow mirror. have started with the construction department and the laboratory workshop. In these discussions the following dimensions were given for the mirror: length 150 cm and breadth 50 cm. The concentration of the beam is height 15? and width 1.59.1 2. Mixer stage The mixer stage has been set up experimentally and works satisfactorily. A second laboratory sample has been ordered. The electrical parts for the mix- er stage are still to be silvered. State of laboratory development - 50;6. 3. Oscillator- fine tuning arrangement (Nachstimmeinrichtung) This has been set up in the laboratory. A trial test can now be carried out in conjunction with the transmitt-ina and receiving parts of the equipment. State of development 50%. . Pulse and test equipment This is ready and has been put into service. The HF output of the pulse transmitter is 29 KW. CLASSIFICATION ARMY X AIR 1 X! FBI MAT-ION REPORT REPORT NO. OF ENCLS. (LISTED BELOW) 50X1-HUM SUPPLE REPORT THIS IS UNEVALUATED INFORMATION MI/PP&E OIT Ix' Sanitized Copy Approved for Release 2011/01/12 : CIA-RDP82-00457RO15300120009-4 Sanitized Copy Approved for Release 2011/01/12 : CIA-RDP82-00457RO15300120009-4 SECRET/CONTROL-U.S. OFFICIALS ONLY 5. I.F. amplifier Construction of the I.F. amplifier cannot proceed further for the tinq being since the EC81 oscillator tube of the test oscillator ci fective 50X1-HUM and no substitute is available, a replace- ment tube is to be obtained as soon as possible i 6. Wave guide The necessary drawn square brass tube is not available and must be obtained from the West. The wave guides used so far are made by bending three sides and soldering on the fourth. 7. The pre-amplifier The pre-amplifier is ready and has been tested in conjunction with the mixer stage. The amplifier works satisfactorily, Stage of development 50%. 8. Simultaneous transmitting and receiving circuit Work on the construction of this circuit will begin shortly, since discus- sions have been completed with the laboratory workshop. 9. Date for completion of prototype of anti-collision equipment The target date for completion of a laboratory model of the equipment is October 1953. SECRET/CONTROL U.S, OFFICIALS ONLY Sanitized Copy Approved for Release 2011/01/12 : CIA-RDP82-00457RO15300120009-4