ZEISS PRODUCTION OF SCHLIEREN DEVICES

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R014200440001-9
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 20, 2016
Sequence Number: 
1
Case Number: 
Publication Date: 
October 20, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R014200440001-9.pdf128.31 KB
Body: 
SECURITY INFOI=TION CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT JQD NO. COUNTRY East Germ my DATE DISTR. 20 October 1952 SUBJECT Zeiss Production of Schlieren Dwriees NO. OF PAGES 2 25X1 NO. OF ENCLS. (LISTED eE1.0W) SUPPLEMENT TO REPORT NO. Approved For Release 2007/03/02 : CIA-RDP82-00457R01420044000 9 25X1 CLASSIFICATION SECRET 71II8 OOCDFICRR C0I1TA1W6 IHFORWATIOW Arfe6:U0*1118 DATIO1ZALOCPE069 of 7115 Gomm OTAT118 WrMIW f6L' 1=120 OP THE FISPIONA49 ACT so 0.0. C.. 81 AND 38, A8 A6EHD*D. ITO YRA910MMSSI0N OS 78E WATELATIOO OP ITS COHTE01* IN AHT I*OIE11TO All CUADTHODLTED MASON IS PRO- MUTED BY LAW. HCPRODDCTFOD Or 11HR7 VOSF] 10 POOWIDITED. CLASSIFICATION 8 X FM I,. VEB Carl Zeiss, Jena, has produced four large Schlieren devices and de- livered"tthem to the Russians. The last one of these four was delivered in October 19541, All four were delivered to the Berliner Technisches Biiro (BTB) in Berlin.Adlershof, formerly part of SAG Avtovelo, but now af- filiated with SAG Transmasch. BTB shipped three of the devices to Russia; one has remained with BTB. 2. All four instruments delivered to BTB were of the same type. They have a total length of seven to eight meters; a measurement opening (MessOffnung) of 30 centimeters and a measurement distance (Messtrecke) of 80 to 100 centimeters. All were constructed for horizontal use only. 3. In February 1952, BTB ordered for the Russians four more Schlieren devices from Zeiss. Two of these are to be of exactly the same type as those de- livered previously. The other two are to be constructed'for vertical use, so that combustion processes in a glass cylinder can be studied. It was specified that construction of the device should allow the investigation of the combustion processes in the direction of the cylinder axis. Zeiss accepted this order and has constructed the necessary optical systems. The Russian order calls for delivery of the first instrument on 1 December 1952, the others by 1 May 1953, Zeiss will only be able to comply with these de- livery terms if it gets so-called compur and compound shutters from the Deckel firm in Munich. These shutters are provided with pneumatic pumps to achieve exposures of one twelve hundredth of a second and slower. Deckel delivered the shutters for the four devices previously produced by Zeiss for the Russians. Li. The Russian request for construction of two of the devices for vertical use raised some difficulties. These result from the fact that the cylinder walls will distort a picture of the combustion. Dr. Carl August Sonnefeidt of the Tele- scopic Department of Zeiss, who returned from Russia in the fall of 1951, overcame the problem by building a special glass cylinder whose bottom (Kolben) is used as a mirror and in which two cylinder-lenses with non- coincident foci (Afokale Zylinderlinsen) are attached. The result is a field of vision covering two-thirds of the cylinder diameter without distortion. 5. Zeiss set the price of the-new Schlieren devices at approximately 170,000 DM East each. A device in the earlier delivery was sold for 138,000 DM East, SECRET DISTRIBUTION THIS IS UNEVALUATED INFORMATION Approved For Release 2007/03/02 : CIA-RDP82-00457RO14200440001-9 SECRET 6,. In addition to the above-mentioned large type Soblieren device, Zeiss developed in 1951 a smetller instrument; this man not ordered by the Russians. Zeiss intends to put it on the market in i953a' The instrument's measurement opening is eight to ten centimeters; its measurement distance varies from 2 to 15 centimeters. The light source is interchangeable; mercury lamps, nitra lamps am carbon electrodes can. be used with the same device Ten of them are being built for completion in 19530 Approved For Release 2007/03/02 : CIA-RDP82-00457RO14200440001-9