DEVELOPMENTS AT CARL ZEISS, JENA

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R014000370006-4
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 20, 2016
Sequence Number: 
6
Case Number: 
Publication Date: 
October 13, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R014000370006-4.pdf246.46 KB
Body: 
Approved For Release 2007/03/02 : CIA-RDP82-00457RO14000370006-4 CLASSIFICATION SMW/CO)POL - U. S. OFFICIALS ONLY. INFORMATION. REPORT REPORT CD NO. COUNTRY East Germany SUBJECT Developments. E Carl Zeiss., Jena 25X1 INFO. PLACE ACQUIRE THIS DOCUMENT CONTAINS INFORMATION AFFECTING THE NATIONAL DEFENSE OF THE UNITED STATES, WITHIN THE MEANING OF TITLE 18, SECTIONS 193 AND 794, OF THE U.S. CODE, AS AMENDED. ITS TRANSMISSION OR REVE- LATION OF ITS CONTENTS TO OR RECEIPT BY AN UNAUTHORIZED PERSON IS PROHIBITED BY LAW.. THE REPRODUCTION OF.THIS FORM IS PROHIBITED. reinstated in the plant. They have not yeti. heveri been given permanent the USSR durinn the months of January and February 1952, have already been 25X1 DATE DISTR. 13 October 1952 NO: OF PAGES SUPPLEMENT REPORT 'NO. 25X1 THIS IS UNEVALUATED INFORMATION Most of the former Zeiss specialists who,, as already reported,, returned from Rern tu ai? specialists from the USSR. e ,r positionsy as the re-shuffle of personzl....Which this will necessitate has not yet been fully worked out An additional group of scientists and specialists from Leningrad and Krasn 25X1 is expected to arrive on about 6 or 7 June 1952. 1 3 i25X1 the erection of factories with and equipment which -t'~bt the time,. being: dismantled and removed fram./Zei1M i:~ was given to factory for the ten specialists sion of factory productioh. the former Zeiss scientists and technicians who were sent to the :USSR originally e a to assist in in camps and received an average salary of 1,500 to 2,000 sables monthly.. The production of astronomieal_ eivipmerit. The technicians were housed the. entire time cons on of the factories is now complete and the technicians are being returned all civiliatrs; about 75% were women. A forty-eight hour week was worked. The production difficulties are overcome. to East Germany,. except in a few cases where -they are being kept on until initial CLASSIFICATION S&~RET/CONTROL - U`, S. OFFIIGIALS ONLY . Annrr, , rl Fnr Palcacc 7nf.17-1n'2/fl9;..? ('IA__P_DPf39_nnA-A7Rf11A Approved For Release 2007/03/02 : CIA-RDP82-00457RO14000370006-4 SECRl /CONtROL - T1. S. Ok' `ICtALS ONLY -2- Orders for Seepolizei and Volkspo'lIzei. 1 4. With regard to the order.a,previously reported, for range finders to be delivered to the Seepolizei in Gdynia and Valkspolizei in Liegnitz$it has now been possible to obtain a glimpse of the relevant entry in the order book in the section for assembly of" large equipment in the main planning department (Planungshauptabteilung, SachgebUett GGM Gross Geraete-,Montage),. the head of which is named Sessler. 2 Apart from confirming the quantities and:. type of equipments the entry shows the order to have been received from the Ministry of the Interior under Ordf No. iilQl d.I. 131 72/22/52, and in the "Place of delivery" column gives "SP Gdingen" and. '''IVP Liegnitz" for the respective orders. Anti-mine equipment. 25X1 25X1 ant-mine. e: pment is to evelope by Zeiss. equipment concern is for the neutralizing of'-electric mines (Elektro-Minen) and is a type produced jointly by Zeiss and Askenia-Werke,. Teltow,during the war. Zeiss made the mechanical precision parts and Askania the electric, components. The apparatus consists of a transmitter which sends out short-wave impulses at fixed intervals), and a three-pole cable (ipolige Leitung) around the hips hull below the water line. The equipment used during the war was mostly fitted onto-smaller craft such as E-boats and mines sweepers. 25X1 Air gumery trainer. (A2 Geraet) 6. a special version of'the air gunnery trainer is to built as a 53- n ng ,rainer. It is basically similar to the existing trainer as already reportedi but lacks the projectors and_IMion picture screen--nnd has special panel instruments with double indicators. One set of indicators can be set by the instructor to conform with conditions of flight which he requires the pupil to simulate; the second set responds. to' the controls..W the correct manipulation of which by the pupil 'causes both sets of indicators to coincide. Rebuilding of the south wcs The target date of 15 May 1952 for completion of the rebuilding of the south works was i tt as far as the building itself was concernedt but it was not found possible to complete the installation of special machinery to enable production to recommence by that date ras had been desired:. The more - important item, still to be installed are: ao the electric moths for the long=spindle lathes, to be delivered by MM Hallesche Pumpenwerker Halle. bo the electric components for the light-reflex testing apparatus for testing and adjusting periscopes and long-base range finders; these components to be delivered by Askania. the assembly mechanism (Zug- unci Puehrungseinrichtung) for the periscope tunnel., to be delivered by Bleichert, pf Leipzig. Range finders: 8.. Because of the delay in completing the light-reflex testing apparatus) it is doubtful whether a cturrentt order for long-base range finders can be completed by the target date.. SECR/CONTROL U. S. OFFICIALS ONLY Approved For Release 2007/03/02 : CIA-RDP82-00457RO14000370006-4 25X1 SECRET/CONTROL.-.U.S. OFFICIALS ONLY Periscopes. 9. It-,is planned that the periscope heads shall be cote- letely assembled in the subsidiary Zeiss works at Weimar and then sent to Jena, where the periscope shafts will be built and final assembly carried out. The work in Weimar will commence when the periscope tunnel in Jena is ready and the complete periscopes can be assembled. Searchlights. 10. With regard to the searchlights on which, as already reported, work has commenced in.Zeiss, it is now provisionally planned that final assembly will be carried out by Signalbau Halle 4 and that Zeiss will produce only the concave mirrors and the blinker device (Streifenklappenscheiben fuer Tag -und Nach .emxdeo) . 25X1 2. iComment.: Sessler is not the 'head of the main planning department, but a chief expert (Hauptsachbearbeiter) in the department. 3. Comment: checked on Troegerts position and reported that he is not ea but is also chief expert (Hauptsachbearbeiter) 1. in the department. Comment: VVB RFT Signalbau Halle. SECRET/CONTROL - U.S. OFFICIALS ONLY