DEVELOPMENTS AT CARL ZEISS, JENA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R014000370006-4
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 20, 2016
Sequence Number:
6
Case Number:
Publication Date:
October 13, 1952
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP82-00457R014000370006-4.pdf | 246.46 KB |
Body:
Approved For Release 2007/03/02 : CIA-RDP82-00457RO14000370006-4
CLASSIFICATION
SMW/CO)POL - U. S. OFFICIALS ONLY.
INFORMATION. REPORT REPORT
CD NO.
COUNTRY East Germany
SUBJECT Developments. E Carl Zeiss., Jena
25X1
INFO.
PLACE
ACQUIRE
THIS DOCUMENT CONTAINS INFORMATION AFFECTING THE NATIONAL DEFENSE
OF THE UNITED STATES, WITHIN THE MEANING OF TITLE 18, SECTIONS 193
AND 794, OF THE U.S. CODE, AS AMENDED. ITS TRANSMISSION OR REVE-
LATION OF ITS CONTENTS TO OR RECEIPT BY AN UNAUTHORIZED PERSON IS
PROHIBITED BY LAW.. THE REPRODUCTION OF.THIS FORM IS PROHIBITED.
reinstated in the plant. They have not yeti. heveri been given permanent
the USSR durinn the months of January and February 1952, have already been
25X1
DATE DISTR. 13 October 1952
NO: OF PAGES
SUPPLEMENT
REPORT 'NO.
25X1
THIS IS UNEVALUATED INFORMATION
Most of the former Zeiss specialists who,, as already reported,, returned from
Rern
tu ai? specialists from the USSR.
e ,r
positionsy as the re-shuffle of personzl....Which this will necessitate has not
yet been fully worked out
An additional group of scientists and specialists from Leningrad and Krasn
25X1 is expected to arrive on about 6 or 7 June 1952.
1 3
i25X1
the erection of factories with and equipment which -t'~bt the time,. being:
dismantled and removed fram./Zei1M i:~ was given to factory for the
ten specialists
sion of factory productioh.
the former Zeiss scientists
and technicians who were sent to the :USSR originally e a to assist in
in camps and received an average salary of 1,500 to 2,000 sables monthly.. The
production of astronomieal_
eivipmerit. The technicians were housed the. entire time
cons on of the factories is now complete and the technicians are being returned
all civiliatrs; about 75% were women. A forty-eight hour week was worked. The
production difficulties are overcome.
to East Germany,. except in a few cases where -they are being kept on until initial
CLASSIFICATION
S&~RET/CONTROL - U`, S. OFFIIGIALS ONLY
.
Annrr, , rl Fnr Palcacc 7nf.17-1n'2/fl9;..? ('IA__P_DPf39_nnA-A7Rf11A
Approved For Release 2007/03/02 : CIA-RDP82-00457RO14000370006-4
SECRl /CONtROL - T1. S. Ok' `ICtALS ONLY
-2-
Orders for Seepolizei and Volkspo'lIzei.
1
4. With regard to the order.a,previously reported, for range finders to be delivered
to the Seepolizei in Gdynia and Valkspolizei in Liegnitz$it has now been possible
to obtain a glimpse of the relevant entry in the order book in the section for
assembly of" large equipment in the main planning department (Planungshauptabteilung,
SachgebUett GGM Gross Geraete-,Montage),. the head of which is named Sessler. 2 Apart
from confirming the quantities and:. type of equipments the entry shows the order
to have been received from the Ministry of the Interior under Ordf No. iilQl d.I. 131
72/22/52, and in the "Place of delivery" column gives "SP Gdingen" and. '''IVP
Liegnitz" for the respective orders.
Anti-mine equipment.
25X1
25X1
ant-mine. e: pment is to evelope by Zeiss.
equipment concern is for the neutralizing of'-electric mines (Elektro-Minen)
and is a type produced jointly by Zeiss and Askenia-Werke,. Teltow,during the war.
Zeiss made the mechanical precision parts and Askania the electric, components.
The apparatus consists of a transmitter which sends out short-wave impulses at
fixed intervals), and a three-pole cable (ipolige Leitung) around the hips
hull below the water line. The equipment used during the war was mostly fitted
onto-smaller craft such as E-boats and mines sweepers.
25X1 Air gumery trainer. (A2 Geraet)
6. a special version of'the air gunnery trainer is to built
as a 53- n ng ,rainer. It is basically similar to the existing trainer as
already reportedi but lacks the projectors and_IMion picture screen--nnd has
special panel instruments with double indicators. One set of indicators can be
set by the instructor to conform with conditions of flight which he requires the
pupil to simulate; the second set responds. to' the controls..W the correct
manipulation of which by the pupil 'causes both sets of indicators to coincide.
Rebuilding of the south wcs
The target date of 15 May 1952 for completion of the rebuilding of the south works
was i tt as far as the building itself was concernedt but it was not found
possible to complete the installation of special machinery to enable production
to recommence by that date ras had been desired:. The more - important item, still
to be installed are:
ao the electric moths for the long=spindle lathes, to be delivered by MM
Hallesche Pumpenwerker Halle.
bo the electric components for the light-reflex testing apparatus for testing
and adjusting periscopes and long-base range finders; these components to
be delivered by Askania.
the assembly mechanism (Zug- unci Puehrungseinrichtung) for the periscope
tunnel., to be delivered by Bleichert, pf Leipzig.
Range finders:
8.. Because of the delay in completing the light-reflex testing apparatus) it is
doubtful whether a cturrentt order for long-base range finders can be completed
by the target date..
SECR/CONTROL U. S. OFFICIALS ONLY
Approved For Release 2007/03/02 : CIA-RDP82-00457RO14000370006-4
25X1
SECRET/CONTROL.-.U.S. OFFICIALS ONLY
Periscopes.
9. It-,is planned that the periscope heads shall be cote- letely assembled in the
subsidiary Zeiss works at Weimar and then sent to Jena, where the periscope
shafts will be built and final assembly carried out. The work in Weimar will
commence when the periscope tunnel in Jena is ready and the complete periscopes
can be assembled.
Searchlights.
10. With regard to the searchlights on which, as already reported, work has
commenced in.Zeiss, it is now provisionally planned that final assembly
will be carried out by Signalbau Halle 4 and that Zeiss will produce only
the concave mirrors and the blinker device (Streifenklappenscheiben fuer
Tag -und Nach .emxdeo) .
25X1
2. iComment.: Sessler is not
the 'head of the main planning department, but a chief expert
(Hauptsachbearbeiter) in the department.
3. Comment: checked on Troegerts position and
reported that he is not ea but is also chief expert (Hauptsachbearbeiter)
1. in the department.
Comment: VVB RFT Signalbau Halle.