AIRFIELD UNDER CONSTRUCTION IN SCHORFHEIDE

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R013800170003-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 19, 2016
Document Release Date: 
April 3, 2006
Sequence Number: 
3
Case Number: 
Publication Date: 
August 20, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R013800170003-2.pdf161.42 KB
Body: 
Y t.f a.d `W~~BkJ,~r{LJ.:... +,.w.=,... fi?l 1 ~~?..... .. Approved For Release 2006/051'Y5 . "CXA-RDP 1380 170003-2 i`dCJ..~....~. " ~ l~TI'~Y.., A: . M rf-i eid under Constr?7.zction in :;chorfhe3 c e 25X1 L-DATE PREPARED_"' 20 iu..yst 19 52 PAGES ENCLOSURES (NO. & TYPE) REMARKS-- -m - -- .~ 2X1 25X1 2. On 21 July 1952, a German construction engineer arrived at the Soviet construc- tion unit near V etrnarnsdorf0 The en ineer was employed by a firni'vihich was t charged with the laying of a spur tracks 15.6 km long, extending from a point south of Vogel sang railroad station toward the east, south of Grunewal.dd cut tinboi was to be used for work on the railroad line, 'l ro saw frames were in operation at the construction site near the construction unit. Three tempo- rar buildings and about 20 tract were observed in the construction supply dump in Jagen (forest subarea) 160, which was surrounded by a barbed uIre fence The area o ? the construction project was being cleared of woods, cast and west of ",'ietmanr,sdar.L-GrossJoelln road to a width of about 1,500 meters on each side,, The area was surrounded by 'a barbed -,-Tire fence and extended from Jagen 190 to 196. Local residents believed that an airfield was to be constructed there. 25X1 F-I 14 on a July 1.952, the chief of the personnel section of the Dran_denburg Lau- union requested 3,000 worl.ers, such as reasons; concrete v rlrers, carpenters., diggers and hodrion, from Prenz1au labor oyfice for a construction project in the .ohc enick-Vogelsang; area. The request was to be approved in writing by the appropriate ministry. The constr Lion project which was designated Soviet Army Project included concrete installations for an airfield. Brick quarters for the rrorliers and shops for the trade and consumers organizations were to bo erected first. Construction work was to start on 9 and 10 July, but this date could not be net because of a shortage of work,erss.. The laborers required few the construction of the brick quarters were to be provided up to 15 July. ro~.-ular bus traffic between F,ho construction site and the Prenzlau railroad station was to be established. 0o onto report confirms previous inf orrnt on on an. airfield con- ion ~rajeet in the Schorfheide. This is tiic first information on the pinpoint location of the construe ion project. For location sketch, see hnnex. The Jaen (forest subareas) are entered. on .iap Gaps, 1I;.lh, Shoot 29Ii7. The construction project appears to be similar to those observed at Buchholz, l'iahltirinicel, `ietzow and Schoenhauser Da a, whore airfields without hard-surface runways are under construction. However, the length of the airfields would be suitable for modern jet aircraft. Pro,a the total size of the Jagen the airfield would cover an area 700 x 2,650 r,nters. ^I ASSiFICATION rr o-P; rn/rr-r;'T-R0.T_/TLC, nT W+Tr.Ti.T: 01-TTY Approved For Release 2006/05/25 : CIA-RDP82-00457RO13800170003-2 Approv (rPor- e`Yea'se 2606/-65725 CIA-RDP82-01)15 2013800170003-2 Location :')ke teh of :2chor ?'heide l:irf'ie:Id .; hic'l is under Construction I+/.. .. t 21 'JL a. ,...4 L` )J ,1 JPIa k.LJ Viall Approved For Release 2006/05/25 : CIA-RDP82-00457RO13800170003-2