INFORMATION REPORT

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R010400110001-7
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 15, 2016
Document Release Date: 
April 21, 2003
Sequence Number: 
1
Case Number: 
Publication Date: 
February 21, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R010400110001-7.pdf182.43 KB
Body: 
25X1 F-1 t% ~ ndnn~ nnn~ _~ REPORT NO.. 25X1 r.n Nn DATE DISTR. 21 Feb 1952 NO. OF PAGES 2 NO. OF ENCLS. 20 C LASP I FI CATION nn RnpR~_d~~ Approved or Release CENTRAL INTELLIGENCE AGENCY I N F "GI FOR PLACE ACQUIRED 25X1 DATE OF INFO. 25X1 1. Location: The copper works in KARABASH last, are located south of the ;mall lake, 3,UOOx3,0O0 feet- 2. Plant Installations: (LISTED BELOW) SUPPLEMENT TO REPORT NO. (60?12' E/55?29' IT), Chelyabinsk Ob- r=iilro d station and southeast of the 1 The copper :lorks consist --f about 15 one- and two-story buildings th a total of seven smokestacks, each over 150 feet high. The 25X1 4. :lock:oxce 2U,U00 to 30,0 'rodiiction: Copper plates of copper ore 0 .;orker - in the copper T,1vurLs and in the mines. and buss. ot: l output for all shifts: 49',A-0 tons daily. Comment: a. she copper combiile in hARABASH is known from old records. About 3, 0cC workers were employed t11 'ere in 4 shifts in 1941. The p::i, ant had three furEaees in 1941, the same number of furnaces as now reported. b. The attached sketch is the first received on this installation. 3. A German town pla Sc Appr. 001-7. 2 Annexes: 1 Copper Plant and Copper nines, KARABASH (2) Shaft 2 of the Copper IiMines, KARABASH Le, end to Annex 1 1 Shaft No 1 Dzerzhinski-Shaft. . epth: 1,750 feet. Gases from a mine fire in Au :~st 1947, caused the shutdown of the shaft which was not re-opened by June 194$. 2 Shaft No 2, Central=Shaft, 1,770 feet deep. For layout see Annex 2 Shaft No 3, Voroshilov-shaft, 1,170 feet deep, at present fur- ther construction under way 4 S3h. ftITo 4, Capital-Shaft, 260 feet deep, no minim yet 4a Transformer and distribution station 5 Shaf.tft 5 $'irst of T. ay Shaft, 1,200 feet deep 6 and 8 Goldshaft and gold washing plant 7 Shaft No 7, Utalino Shaft, 1,250 feet deep 9 Mountain area 10 Dynamite storage, .1 mile square, severcal.lar;__e sheds 25X1 11 PW camp 12 `/ooden bridge, 2,000 feet long, on the : outhea-st bank of the lake, pas sable only for light vehicles. 13 Copper works. Legend L Annex 2 1 Administrative builddin,120x60 feet 2 and 3ressint_ cabins ?;n",' washing facilities 4 Pit head 5 "'_chine house, 120x75 feet 6 Locksmith' shop, 45 feet square 7 Pit head, 120 feet high 8 and 9 dubber conveyor belts, 2 feet wide 10 Crushing plant, 180x45 feet 11 Boiler house, 45 feet square, with. two 60-foot smoke stacks on the northern si;. _e :f the building 12 Machine house, 30x15 feet 13 For _;e , 150x45 feet 14 Air compressor station with 4 compressors :net an underground plant, 300x90 feet water cooling 15a Lathe department, 240x60 feet 15b Motor vehicle repaij' shop,), offices, and liv"t..g; quarters, 240x60 feet 0- 16 Sawmill, 150x36 feet" 17 Transformer station 18 Pit Document I-o. !___-------_..-------- Io Ghaa~re ;a~ Class. ' !Fs. c~. ~a pd ~ : i 5 HR 10.2 Approved"For Release 2003/08/06: CIA-RDP82 04WR9I~~~ 7 25X1