POWER PLANT AT BARANOVICHI

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R010200170001-3
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
7
Document Creation Date: 
December 16, 2016
Document Release Date: 
September 11, 2003
Sequence Number: 
1
Case Number: 
Publication Date: 
February 19, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R010200170001-3.pdf279.42 KB
Body: 
CLAS 3IFICAT1ON 25X1 Approved FoC Re eas 2004/01/28 :CIA-RDP8 -00457 ENTRAL iE 1 ? .. a E 25X1 INFORMATION REPORT 25X1 Vii.', is.tR.k G A I SUBJECT ~ower lane, at Baranovichj. PLACE ACQUIRED DATE OF INFO. 25X1 25X1 PATE LEI Tr:? IV '. B, ,,2 NO.OF PAGES 2 NO. OF ENCLS. 3 (LISTED DELOW) SUPPLEMENT TO REPORT NO. Tm18 OOCOEIr r COW: ISM IIIr3QrATIOH APPECTI13GTUE 11ATIOIdALDRPRNSL OF TAM mirrf3P OTATi : 101TH1t0 INS RGAKITIO OF THE E#PiOUILOR ACT SG 0.8. C.. 31 AND 82. AS ARSE ED. ITS TRA@681I3S164i OR TIM AEFELATIOlF OF M COMM TYA 1W A:BY RA? ER TO AR 011AUTUO UZEO PERSOII 10 PRO- RIGlPRD RY LAG.- i1EEPi:OOOCT ON Or TRIO FORD 1S PEOH?DITED, THIS IS UNEVALUATED INFORMATION 25X1 `fit the northwestern town border )f Barano ichl (26c'021'/ 53003`10, 17hite Russian 56R, opposite a locomotive re- pair plant, in an .an le formed by the r`2ilroad lines to :arer,,t and Vllnyus on the road to Rol nitskiye.~. tog location See Annex l" t 14, 1; n he Plant area., =.ar-r?oximate7 y 400 x 300 meters is sr rounded by a wooden fenced. The plant cons truct1on, part Df the 5-Year Plane, started in the SF ring of 1940, and as scheduled to be completed in 1.950. One source stated that, presumably for the lacy. of labor force, this work as discontinued in Apra 1949. Three turbines were ?lannedw Two turbines allegedly from a dismantled pcwwer plant in Rostock, arrived before November 19460 and cat ,?e Stored in the plant area The approximate dimensions of ;he turbine house were 40 x 40 is 16 met:~rs., The attac.aed administration section was 13 met,~rs high., Next to th+.v turbine house was a building 15 x 15 meters, supported by concrete pillars,, All buildin js were brick struct:ures? (For side view see, Annex 2. For plant layout see annex 3) .;1r,'...; 4 Approved For Release 2004/01/28 : CIA-RDP82-00457RO10200170001-3 25X1 Approved For(Bgt? 01/28: CIA-RDP82-00457R010200170001-3 .CENTRAL INTrLLIGrNCF AGENCY 25X1 25X1 Cot ment Three Annexes: 1o Location of the Power Plant in Baranovichi, 2, Side View of the Dower Plant in 1aranovichi, 3d Plant Layout of the Power slant in Baranovichi, *(51 o2w, 32.39E) 25X1 Work 'Force One hundred Pars, 40 Soviets including 10 for rmen and women, working one shift, CONFIDFNTIA_ Approved For Release 2004/01/28 : CIA-RDP82-00457RO10200170001-3 25X1 Approved For Release 2004/01/28 : CIA-RDP82-00457RO10200170001-3 25X1 %J01.4" I )LrT IrL CENTRAL INTF1LIrr7,NCV, AG-MY 25X1 Annex 31;:1 L ~1:t'.:L?f keg. f ? n- . 1 Ent.'ance and guard house 2 Storage of construction materials r,4 . on.s truction office wooden bui l {: r.L 4 ,mater tower under cons tr action,. oo cavations 4? me- tors deep., 20 meters in la.m~,ter; concreting did not start Coal bunker under constr. Diction., ccncx ote' structure, 04x12x3meters 6 Conveyer belt to con eyLn, tint' er under construction. Conveying to%,,,er, 1.0 x 1Q x 12 meters, ferro-concrete bare structure completed Projected conveyer bolt bet;-reen convoying tower and r: avix . 3;l