POWER PLANT AT BARANOVICHI
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R010200170001-3
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
7
Document Creation Date:
December 16, 2016
Document Release Date:
September 11, 2003
Sequence Number:
1
Case Number:
Publication Date:
February 19, 1952
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP82-00457R010200170001-3.pdf | 279.42 KB |
Body:
CLAS 3IFICAT1ON 25X1
Approved FoC Re eas 2004/01/28 :CIA-RDP8 -00457
ENTRAL iE 1 ? .. a E 25X1
INFORMATION REPORT 25X1
Vii.', is.tR.k G A I
SUBJECT ~ower lane, at Baranovichj.
PLACE
ACQUIRED
DATE OF
INFO.
25X1
25X1
PATE LEI Tr:? IV '. B, ,,2
NO.OF PAGES 2
NO. OF ENCLS. 3
(LISTED DELOW)
SUPPLEMENT TO
REPORT NO.
Tm18 OOCOEIr r COW: ISM IIIr3QrATIOH APPECTI13GTUE 11ATIOIdALDRPRNSL
OF TAM mirrf3P OTATi : 101TH1t0 INS RGAKITIO OF THE E#PiOUILOR ACT SG
0.8. C.. 31 AND 82. AS ARSE ED. ITS TRA@681I3S164i OR TIM AEFELATIOlF
OF M COMM TYA 1W A:BY RA? ER TO AR 011AUTUO UZEO PERSOII 10 PRO-
RIGlPRD RY LAG.- i1EEPi:OOOCT ON Or TRIO FORD 1S PEOH?DITED,
THIS IS UNEVALUATED INFORMATION
25X1
`fit the northwestern town border )f Barano ichl (26c'021'/
53003`10, 17hite Russian 56R, opposite a locomotive re-
pair plant, in an .an le formed by the r`2ilroad lines to
:arer,,t and Vllnyus on the road to Rol nitskiye.~. tog location
See Annex l"
t 14, 1; n
he Plant area., =.ar-r?oximate7 y 400 x 300 meters is sr
rounded by a wooden fenced. The plant cons truct1on, part
Df the 5-Year Plane, started in the SF ring of 1940, and
as scheduled to be completed in 1.950. One source stated
that, presumably for the lacy. of labor force, this work
as discontinued in Apra 1949. Three turbines were
?lannedw Two turbines allegedly from a dismantled pcwwer
plant in Rostock, arrived before November 19460 and cat ,?e
Stored in the plant area The approximate dimensions of
;he turbine house were 40 x 40 is 16 met:~rs., The attac.aed
administration section was 13 met,~rs high., Next to th+.v
turbine house was a building 15 x 15 meters, supported
by concrete pillars,, All buildin js were brick struct:ures?
(For side view see, Annex 2. For plant layout see annex 3)
.;1r,'...; 4
Approved For Release 2004/01/28 : CIA-RDP82-00457RO10200170001-3
25X1
Approved For(Bgt? 01/28: CIA-RDP82-00457R010200170001-3
.CENTRAL INTrLLIGrNCF AGENCY
25X1
25X1
Cot ment
Three Annexes: 1o Location of the Power Plant in Baranovichi,
2, Side View of the Dower Plant in 1aranovichi,
3d Plant Layout of the Power slant in Baranovichi,
*(51 o2w, 32.39E)
25X1
Work 'Force
One hundred Pars, 40 Soviets including 10 for rmen and women,
working one shift,
CONFIDFNTIA_
Approved For Release 2004/01/28 : CIA-RDP82-00457RO10200170001-3
25X1
Approved For Release 2004/01/28 : CIA-RDP82-00457RO10200170001-3
25X1
%J01.4" I )LrT IrL
CENTRAL INTF1LIrr7,NCV, AG-MY
25X1
Annex 31;:1
L ~1:t'.:L?f keg. f ? n- .
1 Ent.'ance and guard house
2 Storage of construction materials
r,4 .
on.s truction office wooden bui l {: r.L
4 ,mater tower under cons tr action,. oo cavations 4? me-
tors deep., 20 meters in la.m~,ter; concreting did not
start
Coal bunker under constr. Diction., ccncx ote' structure,
04x12x3meters
6 Conveyer belt to con eyLn, tint' er under construction.
Conveying to%,,,er, 1.0 x 1Q x 12 meters, ferro-concrete
bare structure completed
Projected conveyer bolt bet;-reen convoying tower and
r: avix . 3;l