ZILINA-CIERNA NAD TISOU RAILROAD LINE

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R008600230008-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 14, 2016
Document Release Date: 
December 18, 2000
Sequence Number: 
8
Case Number: 
Publication Date: 
September 12, 1951
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R008600230008-8.pdf301.85 KB
Body: 
l[ 1x 12 Approved'For Release 2001/03/0@oD@MiM-00457R0086002W,+8A8 CLASSIFICATION CENTRAL INTELLIGENCE AGENCY REPORT NO. INFORMATION REPORT CD NO. COUNTRY Czgchoslovakia SUBJECT Zilina-Cierna nad Tisou Railroad Line PLACE ACQUIRED 25X1A DATE OF INFO. To April 1951 DATE DISTR. 12 Sept. 1951 NO. OF PAGES 3 NO. OF ENCLS. 1* (LISTED BELOW) 25X1 A SUPPLEMENT ` 1 25X1 X REPORT N4. 1, The work of converting the Zil.ina (Q50/092). pisska Nova Ves (R49/D87) Kosice(R49/E34) Cierna nad Tisou R49/E92) rail- road to a double?-track line has progressed to the point where the first section Zilina-Ruzomberok(Q5O/C99) -Popradflatry (Q50/D68)-Spisska Nova Ves, is completed. From Spisska Nova Ves to Vitkovice (R49/D96) the terrain offers few obstacles t4 construction and this section is almost completed, too0 Ballast top Is being rolled and sleepers and rails are :eing la id. . 2,, The Vitkovice==Krompachy (R49/E06) section poses a more difficult problem. Rocky areas have to be blasted, viaducts constructed and roadways straightened. Between Vitkovice and Olcnava(R49/D6) a steel viaduct 85 m. long and 22 m. high supported on reinforced concrete pillars has been built. A bridge 10 m. long and 12 m. high has been constructed over the Ol:nava Creek some 250 m. west of the Olenava station. West of Krompachy a new double-track viaduct 450 m, long and 40 mb high has been built across the Hornad River to eliminate a curve in the road 3. The Krompachy-Kluknava (R49/E16) -Margecany (R49/9l6) -Kysak (R491E25) stretch presents the most serious construction difficulties and will probably require until November 1952 to comp1ete" In order to lay the double track, it was necessary to cut a pass 1000 m. long out of the rock near Rychnava ((R49/RO6) , The roadway as also straightened at this point. West of Margecany a steel bridge 30 m- long and 22 m, high was built to span the Hornad Rivera Near Roleva Hut (R49/E16) a tunnel is being drilled through the rock alongside the existing single.track tunnel to make way for another track. Work is being done from both sides, but having to cut through basaltic rock has slowed the progress considerably and therefore, the tunnel is only halfway finished;; When complete it will be 800 m,, long. From the tunnel to Mala boding (R49/E29) the embankment along the Hornad has to be walled for a distance - ^ it 9'm CONFIDENTIAL STATE NAVY NS1 DISTRIBUTION ARPBY 7i ~~ AiR ~ Fm Document No. No Change In Class. 0 [] Declassified Approved For Release 2001/03/06 CIA-RDPB 61k@08660231b0?- A ith.: HR 7 2 Date: ---LQ~1 fay: CLASSIFICATION ='-O C 2726 Approved For Release 2001/ -&V4-4& 008600232ggR C TTRAL I I TELLIG : TlC L AG'T;CY 2 w West of Kysak a new bridge about 120 mo long and 12 m. high has been built over the Hornad, and south of the town a single-track bridge 40 ma long has been built over the same river. North of Kostolany (R49/E35) a bridge 150 m,, long was constructed over the Hornado A new single-track bridge spans the Hornad south of Teplieany(R49/E35); and north of Tahanovee (R49/E'34) a single-track tunnel 250 m. long has been built alongside the old ones, 4e As a result of double tracking it was necessary to enlarge railroad stations at Margeeany and Kysak, The station at Kysak now has 34 tracks. 50 Work on the northeastern branch of the railroad (Kysak- Presov (R49/E37) Vranov/Teplou CR49/ :653 --Strazske (R49/E75) Humenne (R4'9/E86) .Medzilaborce (R50/E89) , was slowed down considerably when manhinery and manpower were withdrawn from that section and were brought to work on the Spisska Nova Ves- Kosice lihe0 To date a second track has been laid only from Kysak to Kendice (R49/E36) and from Medzilaborce to Koskovce (R50/98'?),.. Men and machinery were also transferred to the Spisska Nova Ves Kosice section from the north central branch Podoiinec (R501!80) -Orlov/Plavec M50/ZOO), with the result that work on that line has all but ceased for the time being,, None of the Spisska Nova Ves-Koss ce section has been electrified yet, ant no apparent preparations are being made to erect over- head power lines n However t along the Zilina---Vrutky-Ruzcberok stretch, poles 2& overhead power lines have been erected but are still without wires. Once the railroad is electrified,. power will be supplied for the eastern section by the hydro' electric plant ett Krompachy and for the western section by the power plant at Ustle nad Oravou (Q50/Y12) Technical equipment used on the Sp'z sska Nova Ves - Kosice line includes the following. 21 excavators from 0.5 cue, m