ZENTRALLABORATORIUM RFT, BERLIN-KOPENICK

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R007500120006-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 27, 2016
Document Release Date: 
October 23, 2013
Sequence Number: 
6
Case Number: 
Publication Date: 
May 9, 1951
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R007500120006-7.pdf89.27 KB
Body: 
50X1 Declassified in Part - Sanitized Copy Approved for Release 2013/10/23: CIA-RDP82-00457R007500120006-7 II4fELLIGENCE AGENCY COUNTRY SUBJECT PLACE ACQUIRED DATE OF INFO. irJ1POR ATION REPORT CD No, Germar.,:y. (aussim ono)Z Zentrallaboratorium nrT, Berlin?apenick DATE DISTR. No. OF PAGES NO. OF ENCLS. MISTED BEIM SLIPpLEm MUT Tfl REPORI 1 50X1-HUM 50X1 11115 toOCIIMEllt COMAtr 111701:5 AT103 APPICTMOVIS HATS/HAL nem= OF V513cnMATES OITA:11 ISS !MMUS o 7NE Et:PIM:LW fiC1 SO LS. C.. 51 arzio pl. AS INSE12555. 17515525E/ISSIOil ow WS =SUMMON OP ITS 501571E1178 SO AST VA/5111,1 PO AU USAUTSOSVISO mean IPta. 1111.57211 CP %SW UP20511CTIOF OP /515 MIA 15 tlowerno. 'tke ' THIS IS UNEVALUATED INFORMATION 50X1-HUM 1. At Lohre on the island of nuegen one transmitter of 5 KT; and 13 to 100 m wave? length has been act up. Tuo transmitters being built at RFT for Loh me have the following characteristics: 2.5 to 10 K7, 00 to 200 m wavelength for speech and telegraohyland 2.5 to 10 Ic!, 500 to 1,000 m wavelength. 2. The wavelength of ,the transmitters 1Till be 100 to 600 m, 3 fixed frequencies. The project, or7ered by DM, Iiinl.stry. Post und Planung, has the code naue 50X1 3g The transmitter also ordered by lin? istry of Post una Planung? is to be mobile, i.e., mounted ontruck, not seif-? 50X1 propelled; wavelength 100 ? 600 m. The project is not being worked on at present. /1.0 The project has the code It has the following tubes: L x 235.50, 2 x 713 720, 2 x 20 304, 2 x 2350 (not clearly legible; could be L 550); "Steuerquartz", wavelength 13 to 100 ra. 5 name 0X1 .)0 Jerk is in progress on the thermal generators 100 ,1 2 K.., 20 K,. 3ome ucre obtained from the firm, Lorenz Leipzig, and are now being copied. 6. "ork is in progress on naleichwellenversatz zur bteuorang ,m,l'irercr Sender". This project is still in the development stage. 7. It is believed that no trancnitters are being buil for I ntprforpnon nnl All are constructed with very careful modul ati nn 0. STATE ARMY 50X1-HUM It was formerly reportod that special passes would be introuced for personnel of Grossenderbau. This has been done by stampinr,: the letters. GS in red on normal -Tork passes. NMN MR CLASSIFICATION .71.37 .9VCCTITP,OL 0 nr, TA"?' '1 M1 r ran' .cr k.u. NSRB MSTRIBUTION 1 CONFMAL Document No. No Change In Matz. D 0 Declate;Ved Class. Chapgaci Te: TS SC5) Aug.: RR 70.2 Da e r..2 50X1-HUM Declassified in Part - Sanitized Copy Approved for Release 2013/10/23: CIA-RDP82-00457R007500120006-7