EXCEEDING OF TARGET DATES OF THE ROAD BRIDGE CONSTUCTION PROGRAM

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R006900030005-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 16, 2016
Document Release Date: 
September 16, 2003
Sequence Number: 
5
Case Number: 
Publication Date: 
February 7, 1951
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R006900030005-2.pdf232.76 KB
Body: 
Approved For Releas ? i22~ JIF CLASSIFICATION CENTRAL INTELLI 1 ATI REPORT CD NO225X1 COUNTRY Gerr= ny (Russian Zone) SUBJECT Exceeding of Target Dates of the Road Bridge Construction Program DATE DISTR. 7 FcbrWary NO. OF PAGES 4 25 NO. OF LISTED ELOW)) L -5X1 SUPPLEMENT TO REPORT NO. a,- x,, c m W =MW W we mma e e acs ssc MOM fai? 6_D.. RMPQDDVCM= OP 7S3S F01 bS POONUMM THIS IS UNEVALUATED INFORMAT;ON 25X1 1@ The following information on dela the Soviet Zone struction proeram via obtainedr--li-I 1 25X1 1 25X1 Construction vior` started too late, only 6o percent of the required steel available, no cement 15 32 36 Only 36 percent of the required steel available Altentreptow 160 8 32 57 only 13 percent of the required steel available 4 R 96 Dannenvalde 300 0 2 11 15 Only 29 percent of the required steel mailable, no cement 5 R ill V oigast I90 4 12 21 28 Only 45 percent of Harbor the required steel CLASSIFICATION -SC STATE NAVY J NSRB DISTRIBUTION Ar2rdV ?) AIR FBI This document is hereby regraded to CONFIDENTIAL in accordance with the letter of 16 October 1978 from the Director of Central Intelligence to the AArchivist OO$ I~@yW9s9t"b.4/01/22 pprove Next Review Date: 2008 Construc- Construction sta- Delay caused by tion tus in percentage costs in July Aug Sept Oct 1,000 east CIA-RDP84Z! and 55 percent of the required ce- ment available 25X1 951 Approved For R CE3 AL Land randanb=g 6 RAB Uetz 500 25 30 38 45 (Western Ring Around Berlin) 7 R 1 Quenzbridge 450 10 17 19 28 Brandenburg town 8 R 107 Havelberg 275 10 15 20 23 River Bridge 9 LO II G P innow 410 a 15 28 31 Borgsdorf 10 RAB .Vetschau 125 22 30 35 43 11 (Berlin- Forst) RAB Rauen 160 15 35 39 55 12 (Berlin- Frankfurtst Oder) RAB Nuhnen 120 20 3G 46 61 13 (Berlin- FranCurt/ Oder) R 2 Eberswalde 200 10 20 24 42 14 R 96 Sachsen- 70 35 42 50 63 15 hausen R 109 Lottscher 150 10 12 19 23 Bridge 16 LIO 203 Kreuzbruch 160 10 15 19 22 -CL Td CONFIDENTIAL 25X1 No heavy ram, shortage of steel for Kohn type mili- tary bridge equip- ment No heavy ram, shortage of, steel for Kohn type mili- tary bridge equip- ment Only 10 percent of the required cement available No heavy ram, shortage of steel for Kohn type mili- tary bridge equip- ment shortage of steel and cerQent 9 only 42 percent of the required steel and 26 percent of ce- ment available The firm contracted had to undertake other projects The firm .contracted for the lifting work was not adequately prepared for this project 4 ork was started too late, shortage of tools and equipment Slow progress of work, various deficiencies No heavy rays only 30 percent of the required steel available, no cement No heavy rays only 8o percent of the required steel available, no cement Approved For Release 2004/01/22 : CIA-RDP82-00457R006900030005-2 Approved ease 2004/01/22: CIA-RDP82-00457R006900030005-2 L 12 4 17 LIO 337 Marquardt 255 18 R 1 Strenggraben 240 Bridge in Werder Land aar.WUIL-Anhalt 19 R 1 Genthin 742 ~,~nd T yen 20 RAB Scheliroda 180 (Dresden- Eisenach) Land Sachsen 21 RAB Across Elbe 300 (Dres- River in den- Dresden Eisenach) Minor delays in the scheduled 7 a 20 25 30 45 15 25 30 35 10 20 25 55 40 46 y"1 64 41 46 60 65 4' 25X1 Only 29 percent of the required steel available Adequate bx is were employed too late only 50 percent of the required steel available, no cement only 61 percent of the required steel available, the firm contracted for the steel construction work preferred other projects Only 70 percent of the required steel available, inade- quate organization of work The necessary 15- ton sheets could not be produced completion are to be expecteds d_ Brndenburg 1 RAB Wernsdorf (Southern Ring Around Berlin) 3 50 50 53 72 2 RAB Berkenbrueck 19110 (Berlin- 6o 70 78 Frankfurt/ Oder) 3 R.AB Dr0Koeris (Berlin- Breslau) 190 36 42 52 4 R 96 Teschendorf 50 0 0 5 85 Faulty welding, inadequate organi- zation of work 86 Lack of rivets caused a delay of two months 62 Slow work by the participating firms 20 Work started too late; inadequate work force CONFIDENTIAL 25X1 Approved For Release 2004/01/22 : CIA-RDP82-00457R006900030005-2 25X1 25X1 rEI li N 17 '- r NNI I Approved For R lease 2004/01/22 : CIA-RDP82-00457R006900030005-2 rn,MV%+, These bridge construction projects were reported previously as being contained in the 1950 investment plan, See -- I The delays tin most cases were F caused by a shortage of steel, particularly girders, which are a critical item in the Soviet Zone of Germany, CONFIDENTIAL 25X1 25X1 Approved For Release 2004/01/22 : CIA-RDP82-00457R006900030005-2