REPORTED CONSTRUCTION OF NEW OIL AND NATURAL GAS PIPELINE FROM RUMANIA TO USSR

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R005800660002-8
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
1
Document Creation Date: 
December 14, 2016
Document Release Date: 
January 31, 2001
Sequence Number: 
2
Case Number: 
Publication Date: 
September 20, 1950
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R005800660002-8.pdf60.61 KB
Body: 
Approved For ReleaseGONIID E 2-00457ROO5800660002-8 CLASSIFICATION T CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT COUNTRY Rumania/usSR SUBJECT Reported Construction of New Oil and Natural Gas Pipeline From Rumania to USSR PLACE ACQUIRE 25X1X DATE OF 25X1 A INFO. 25X1A 16 Under Soviet direction, an oil pipeline has been constructed and is now in operation along the route Ploesti-Buzau-R innicul Sarat-Focsani.- kiacau--Roman-Iasi Ungheni, terminating'in either Odessa or Kiev. 2, t 4 natural gas pipeline has. been constructed from Tarnaveni to Kiev. 3. For the construction of this oil pipeline to the USSR, the internal Rumanian pipelinePloesti-Constanta, Ploesti-Giurgiu, and Ploesti- Gala i have been dismounted and material used on the present line. Supplementary material, including pumping stations and ~'4 or 26 centimeter pipe, was bought in Italy in 19494 The pumping station equipment is now being produced in Rumanian This document is hereby regraded to CONFIDENTIAL in accordance with the letter of 16 October 1978 from the Director of Central Intelligence to the Archivist of the United States. Next Re:v;e~w Date: 2008 CLASSIFICATION ViETUR I U LIBRARY Q REPORT NO. CD NO. 25X1A DATE DISTR. 20 September 1950 NO. OF PAGES 1 NO. OF ENCLS. (LISTED BELOW) SUPPLEMENT TO REPORT NO. C?VIcM ENT1AL Approved For Release 2001/03/05: CIA-RDP82-00457R005800660002-8