LAYOUT OF DANZIG HARBOR

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R005800230006-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 15, 2016
Document Release Date: 
April 21, 2003
Sequence Number: 
6
Case Number: 
Content Type: 
MAP
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R005800230006-1.pdf83.74 KB
Body: 
25X1 Approved For Relea =5 , GIA RE)P82 5800230006-1 SECRE 25X1 La o11t of Danzig I.Inrbor IELLIG} E AGENGT Approved For Release 2003/08/05 : CIA-RDP82-00457R005800230006-1 Approved For CENTRAL INTELLIGENCE AGEIC! Lo end to Annex Ai 002100OR-1 -1 1 Two 1_ar. g cw Rotterdari 4ype warehouses, The northern avarehouse is bein ierr,hened.a On either side of the warehouses are railroad tracks. On the watex front are two largo, new cranes. The cranes are so high that they can load the largest ships a 2 Coal Barber of Weichselmuede (Fasen Gorniezy) ry .v 3 Four new 't-ton luffin ; cranes installed in late 1949 14 Three 7-ton I-Liffing cranes 5 Three old cranes, each of Won lifting power 6 One 5-ton crane and one 7-ton crane 7 Three coal elevator;,, each ^rith a capacity of up to 5.003 tons JILL 25X1 8 ,-op Barracks. 130 Polish naval and J0P personnel 9 1Iarboradninistrati on with the only tole phone :facilities in the port, 10 Duildin-? site beta oen two coal elevators. The quay foundation has been du,, out hero. 11 Dui a.ri loading station for pit props a The stock: available on 20 ~^ oh 1950 were astir tod at 40,000 to 50,O00 cz?'oic meters. No -c-canes are available... 12. TSer construction of quay an i straightenin of the fairs ay in TJesuf_ahrwasser? (Nov Port) 13 P 'ssumabl y a rifle range 11L 7i'-_ck of the :prim-r Italian steamer AfriCana All harbor installations in this basin have boen destroyed. No 1,:)ading operations are going on Uncre, 15 large warehouse, about 11)'0 meters long, der construction'. a g i 25X1 25X1 25X1 Approved For Release 2003/08/05 : CIA-RDP82-00457R005800230006-1