LAYOUT OF DANZIG HARBOR
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R005800230006-1
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 15, 2016
Document Release Date:
April 21, 2003
Sequence Number:
6
Case Number:
Content Type:
MAP
File:
Attachment | Size |
---|---|
![]() | 83.74 KB |
Body:
25X1
Approved For Relea =5 , GIA RE)P82 5800230006-1
SECRE 25X1
La o11t of Danzig I.Inrbor
IELLIG} E AGENGT
Approved For Release 2003/08/05 : CIA-RDP82-00457R005800230006-1
Approved For
CENTRAL INTELLIGENCE AGEIC!
Lo end to Annex
Ai
002100OR-1 -1
1 Two 1_ar. g cw Rotterdari 4ype warehouses, The northern avarehouse is
bein ierr,hened.a On either side of the warehouses are railroad
tracks. On the watex front are two largo, new cranes. The cranes
are so high that they can load the largest ships a
2 Coal Barber of Weichselmuede (Fasen Gorniezy)
ry .v
3 Four new 't-ton luffin ; cranes installed in late 1949
14 Three 7-ton I-Liffing cranes
5 Three old cranes, each of Won lifting power 6 One 5-ton crane and one 7-ton crane
7 Three coal elevator;,, each ^rith a capacity of up to 5.003 tons
JILL
25X1 8 ,-op Barracks. 130 Polish naval and J0P personnel
9 1Iarboradninistrati on with the only tole phone :facilities in the
port,
10 Duildin-? site beta oen two coal elevators. The quay foundation has
been du,, out hero.
11 Dui a.ri loading station for pit props a The stock: available on
20 ~^ oh 1950 were astir tod at 40,000 to 50,O00 cz?'oic meters.
No -c-canes are available...
12. TSer construction of quay an i straightenin of the fairs ay in
TJesuf_ahrwasser? (Nov Port)
13 P 'ssumabl y a rifle range
11L 7i'-_ck of the :prim-r Italian steamer AfriCana
All harbor installations in this basin have boen destroyed. No
1,:)ading operations are going on Uncre,
15 large warehouse, about 11)'0 meters long, der construction'.
a g i
25X1
25X1
25X1
Approved For Release 2003/08/05 : CIA-RDP82-00457R005800230006-1