BAKALSTROI METALLURGICAL PLANT IN CHELYABINSK
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R004900420002-4
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 15, 2016
Document Release Date:
March 4, 2003
Sequence Number:
2
Case Number:
Publication Date:
November 7, 1950
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP82-00457R004900420002-4.pdf | 162.54 KB |
Body:
f Dp8~-?}045
IN~E1 ~F 'K ~ Approved For Release 2003/08/0 2 0 0 3 / 0 8 / 0 1: 6 1
CLASSIFICATION
CENTRAL IN?ELL)GENCE AGENCY
INFORMATION REPORT
COUNTRY
SUBJECT
25X1 PLACE
ACQUIRED
DATE OF
INFO.
USSR (Chelyabinsk Oblast)
Bakalstroi LietallurGLcal Plant in Chelyabinsk
THIS 00D09WcauTAINS1FiFt!'aifi+T.GT.A~t. i~61TRVAtIOHA6.O>ZP8099
or T08 011108 OTAYTS ctITaru INS O0A11l1IS 01 INS 099100At16 ACT 50
9.8.0.. 1H AND 28. A6 AT1tH080 ITS Tt*1ISflNE810W on Tit tt8T6f.AT10R
or IS 00910018 in ANT UAVM* TO A9 0WAOT000180D 998909 18 !DR
111MUD YT MIT. 089110 00l" or 181$ 1101111 1900011891 08.
00#900420002-4
25X1
REPORT NO.
25X1
CD NO.
DA YE DISTR..
7 l lovember 19'
NO. OF PAGES
2
NO. OF ENCLS.
20
(LISTED BELOW)
SUPPLEMENT TO
REPORT NO.
THIS IS UNEVALUATED INFORMATION
25X1
25X1
25X1
1,oeation
In the northern section of Cori LYA.BT:-33Y. (81?25' J55?10'.6)
east: of the 1as$River.
Plant Installations
There t^1ias on old rolling mill and the excavation for a nee
one started in early 1948.. This mill Is eventually to include,
the site of TV. Ctm.p !To. 7629. A new power station with three
boilers has been under construction next to the old ncrier sta-
tion since 1942.. One of the boilers was desi j ned for coal firing,
the other two presumably for has firing, the gas to be supplied by
the coking- plant located to the north. The coal boiler rias put
in operation in late 1948; the other two boilers were schedi,led
to be put into operation in early 1949.. It tp"e.s hot known
whether th-- fixed time tar. gat as met. Tha plant has numerous
spur tracks (see mnex) .
a. .she existence of the Bakalstroi Iron and Steel Plant ,
about 7 miles north of C11-7LYABIN -, beta-peen the villa ;es of
i`. .A.."?J-,EV0 and KRUGLOYE, was known before.
Comment
b. Exhaustive and correct information on all the installations
25X1 of this important plant can never be obtained fTojrTy
ever, this report, Yhen compared with previous information,
seems to furnish a correct picture of the Sereral distribution
of the most important plant installations and gives credible
details on the size and type of construction of the individual
buildings.
'CTh attached sketch does not Indicate the ba.:ndaries of the
n Lanai are
Di ecitov of C vJ I if3 e .ticielic io the
bpprove ''For Releas a 2003/08/05
Next Review Date: 2008
25X1
5X1
25X1
Approved For Release 2003/08/05 : CIA-RDP82-00457R004900420002-4
25X1
=HTML MITM YCE Ate'
A r'uestion r t#'k has been placed at the side of the arr6w
indicating the cardinal point. l.;.eT;.Iever, the a; roement of the
distribution of the individual plant departments as repre-
sented on the attached luinex '??ith a former report and the
same reed; esentation of the plant spur tracks leading to the
plant in an I and 6VI1 direction make it probable that the
cardinal, point was correctly stated.
0. Of particular interest is the. statement on the construc-
tion of a sevbnd rolling mill (Annex, No. 3). This confizris
a previous report. An intended increase of the plant capacity
can be inferred from the construction of this second rolling
mill.
d. Further information of a more recent date is required in
order to clarify the picture of this plant.
Annex: Metallurgical Plant . Bakalstroi' . ih. CIfl LYABTFSK
Le&end to Annex
l Camp To, 7629
2 New rolling-mill
3 Old rolling 'mill, constructed in 1941, brick structure '?Tith
oval roof supported by a steel frame
4 Foundry
5 Electric locomotive repair shop, 180x50x60 feet
5 a Assembly hall with spur. track
5 b Lathe and milling departmnt
5 c Armature tw.linding department
6 Open hearth plant 1tith 5 furnaces
7 Sawmill
8 Old pc 'i er plant with a boiler and smoke stack
9 - I vi pov,,er plant, 270x600 feet ev ith 3 smoke stacks
a Turbine
b as firing boiler
c Coal firing boilers
d .Presumably coal boiler
e Crone
10 Gas container, 45 feet high and 4 to 5 feet in diameter
11 Gas pipe, above ground, 4 to 5 feet in diameter
12 Two blast furnaces or gas containers
13 Coking; plant