RECENT DEVELOPMENTS AT THE ZISTERSDORF OILFIELDS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R003000510005-1
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
October 21, 2011
Sequence Number: 
5
Case Number: 
Publication Date: 
August 9, 1949
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R003000510005-1.pdf158.97 KB
Body: 
P0?tT`WTrA*WATmTAT.? cnvi ui IRA Declassified in Part - Sanitized Copy Approved for Release 2011/10/21 CIA-RDP82-00457R003000510005-1, o n[."R.1T17A1 IMITT'I 1 tf%r'hf sr- AF'-1111''V T)IC'f9C.T]?i" INFORMATION REPORT COUNTRY Austria/USSR Recent Developments at the Ziatersdorf Oilfields DATE DISTR. 9 AUG 49 NO. OF PAGES 2 NO. OF ENCLS. (LISTED BELOW) THIS COt:DNEUT CONTAINS if4FORB:ATION AVFECW567BE NATIONAL 09FANSR OF 707 0GIT80 OTATE9 WITfr11+1 Tt76 CITA141RO OP THE 95PIONTi68 ACT 90 ILL C., 81 AND 92, AS 409ND29. ITS TnANS1110SICN 02 769 REVELATION OF ITS CONTLUTS IN AZT 0A11N90 TO AN 0N4072081Z98 P99806 19 PRO- THIS IS UNEVALUATED INFORMATION L, a, Oil which was being produced by K 2 at'tLo rate of 120 tons per day, ceased on 14 June 191.9. The bore was -s'_ot again, but this was effected at tho exco^cive depth of 1720 meters, and the borehole is now producinrg 1000 cm of cater per hour. The bore will be reshot shortly. b. K 3 is nroducing between 130 and. 160 ins per day. F. 4 ha? bean successfully shot at 1850 Mersa Because of lack of piping.,, however, the bore has been temporarily sealed and no analysis has yet been taken. The pre; sure is octir.>c,ted at 9C atmospheres, the sane as K 5= In view of this, the pressure will be utilized to drive oi.G - -c;iv station at the :;atzon railhead. and no auxiliary pupping unit will be in- stalled. d, K 5 (as well as K .) was bored through four strata. I. is intended in both cases to exhaust the strata at naximn depth before exploiting the others. K 5 was reported to have been successfully shot at 2100 rioters, but during additional drilling on 15 June 1949, the drill seized at a depth of 1665 rioters and broke. e. A chisel bit (I: issel~ is being used on K 6 and K 7 because of the stony composition of the boring area. K 6 has been bored to 400 peters, and K7 to 250 rioters, f. The drilling on K a has reached a depth of 1710 raters and will be con... tinued to 1500 meters. Drilling, which proceeds at an average of six rioters per hour, passed through an oil stratum which will be exploited at 1450 meters. Piping for the K 5 borehole has arrived, and it was hoped to install it by the end of June 191.9? g.. The derrick from K 3 has been dismantled and erected again on K 10, a new bore near Ollendorf, CONFIDENT144 CLASSIFICATION rr , NSRL3 DISTRIE Dos- NO CHANGE in C1esS. D 11 DECLASSIFIED Class. CHANGED TO: TS ))A Memo, 4 Apr 77 Auth: )DA REG. 77 Pat*. Declassified in Part - Sanitized Copy Approved for Release 2011/10/21: CIA-RDP82-00457R003000510005-1 Declassified in Part - Sanitized Copy Approved for Release 2011/10/21: CIA-RDP82-00457R003000510005-1 ~~ Qi~Y]:DENTIAT~ CJ li'RAL III`: EMLIG LIMB AGE"'M h. The building of the projected pipeline from i:atzen to Bochflciss has been started by the Bau-s.nd Iiontageabteilung. i. Fire precautions consist of two foam fire extinguishers of ten liter capacity per borehole. J. The following equipment is found at the storage tanks: one foam motor pump of 300 liters c?apacitt,; , and six foam fire extinguishers of ten liters capacity. k. The loading stations each have four foam fire extinguishers of ton liters capacity. a. Production of 'IM-ilberg field has been raised by six tons per day, and three new borings have boon initiated. b0 The headquarters of the boring firm. Rumpel are being moved to Ilatzen from I?Thhlberg. c. It is reported that 120 workers were transferred from this area to siatzen, ' and that an additional 90 were expected to leave before the and of June 1949. 3. DEk I, MA II, and ITAG deliver approximately 2225 tons* of crude oil daily to the Ilcusiedl pumping station. 4,, ,EPG id producing a total of 30-45 tons per day. 5. It is hoped that the now bore in Royersdorf will produce gas for Vienna and GCnserndorf. 6G At the beginning of June 19h9, eight carloadi of seamless piping (the equivalent of 14,000 raters) arrived in iieusiedi from I:oravskn Ostrava, from the Vitkovice foundries. The piping was kiadintel.y taken by road convoy to Matzen. As part of the consignment consists of Soviet pipe with 6 and 8 threads, it will be necessary to do some recuttin to the standard size. 50X1-HUM Gornen . 220 tons from DEA I, DEA. II and ITAG was error. CONFIDENTIAL a total daily delivery Declassified in Part - Sanitized Copy Approved for Release 2011/10/21: CIA-RDP82-00457R003000510005-1