CONDITION OF RAILROAD BRIDGES AND LINES

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R001800050006-5
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 15, 2016
Document Release Date: 
February 20, 2001
Sequence Number: 
6
Case Number: 
Publication Date: 
August 17, 1948
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R001800050006-5.pdf117.65 KB
Body: 
COUNTRY SUBJECT CENT1081"BriekoaW13062-00457401#811a11111 ed Fs?liNP6141VIATION EPORT CONFIDENTIAL 25x1A Germany (Ruasian Zone)/Polanditsea Condition of Ba Bridges and Lines PLACE ACQUIRED 25X1A DATE OF IlTFO July 1948 his document Is hereby regraded to CONFIDENTIAL in accordance with the letter of 18 October 1978 from the Director of Central intelligence to the Archivist of the United States. Next Review Dat 2108 b A.. 9 25X1X DATE DISTR. 17 Auguot 104e NO. OF PAGES 1 NO. OF ENCLS. (LISTED BELOW) SUPPLEMENT TO REPORT NO. 25X1X Tie condition of the main Berlin-Wittenberg-Eisenach line is given ea follows: a. Berlin to Wittenberg: one track; signal blocks in order. The total load capacity is 28 trains a day in each direction, b. Wittenberg to Neudietendorf (M 52/J 25) two tracks, signal blocks in order. c. The Elbe bridge near Wittenberg, wood with steel superstructure, has been repaired. The speed limit is 30 km per hour. (f. The Mulde bridge near Bitterfeld carries one track, with sialeas and signal blocks at each end. The speed limit Is 20 km. e. The Seale bridge near Weissenfels is a temporary structure, only one track is in use. Speed litit 5 km. A permanent bridge is being constructed; concrete has been laid for four of the ,arches, the wooden frames for the last two arches and the western' approach are now being raised. The SNA has ordered that the bridge be ready by the end of the year. a. The Seale bridge between Schoenburg and Goeseck (J 89) I only one-tradk. The speed limit is 30 km. g. All the other bridges are in order. h. Neudietendorf to Eisenach: one track. Traffic is very taloa' along this stretch because of a long section from Gotha to Froettatadt (11.96) which has no sidings. The SMA, however has ordered that a siding be built near the Leiria Canal. The signal blocks are being converted to single-track system at the present time, The Russian broad-gauge track extends Gerdauen. There are no bae,d- Brest-Litcvsk-Kowel-Przemysl demarcation line. There is a standard- gauge rail on the broad-gauge lines Koenigsberg-Vilna-Leningead and Brest-Litovsk-Grodno-Leningradl . CLASSIFICATION GONFIDEITZTAL STATE # NAVY NSRB . DISTRIBUTION ARMY # -IX as far as Instarburg and e, $ WARNING nOTICE: THIS DISTRI EXCISED BEFC11E PtiBLIC 7.T.12:SE OF THIS DOCUMENT. rr . 4.11 OS. 0 S $ 77 CONFIDERTIAL Auth: New Approved For Release 2001/03/17 : CIA-RDP82-00457R 0006-5 7--- 25X1A Approved For Release 2001/03/17 : CIA-RDP82-00457R001800050006-5 Approved For Release 2001/03/17 : CIA-RDP82-00457R001800050006-5