RAILROADS AND BRIDGES
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R001400750005-3
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 22, 2016
Document Release Date:
October 20, 2011
Sequence Number:
5
Case Number:
Publication Date:
April 21, 1948
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP82-00457R001400750005-3.pdf | 81.69 KB |
Body:
/ 5nx1-HUM
Declassified in Part - Sanitized Copy Approved for Release 2011/10/20: CIA-RDP82-00457R001400750005-3
I-
COUNTRY USSE?
SUBJECT Railroads and Bxnidgoa
PLACE
ACQUIRED
~v-rt~DENTIAla
NO. OF PAGES
NO. OF ENCLS.
(LISTED BELOW)
SUPPLEMENT TO
REPORT NO.
l::1: OJLVMEIf CSxTA1K$ 7KF0AWA'hO% &VF9CT1K0 Flit RATIOu.L DEFROT-2
KiOf TIM IN.,., mitts CITAM ME W"HWG or TMi 6f P1. 11ACt ACT CO
V.3. C..71 AVID S:. Af AMENDED. IT4 TRA1128!!Z1011 DR T48 A$YR.LAT:.Qk THIS IS UNEVALUATED INFORMATION FOR Ti- E RESEARCH
- Of 1!S COKT'EMT9 fM AMT tlAHilER !6 AM CNAVts:Gt230 ? R$,S't 14 PN0.
3 R11TO aY Lo 4C, ?EiCOc uc TO fJ Cl if 9 FORq 1U 4ROMINI9CO USE ZYCR 17T .,:ICS zG. Af fE All cc,a! of Flit fox" ~IAY a _I_ o ; OF TRAINED INTELLIGENCE ANALYSTS
A DCMED 19?C6r AfY DY T.11 4Et? %'i G AC11Cf
50X1-HUM
STATE
ARMY
1. The railway frets Pinsk to Brest44Aittovsk, which was ruiriing as a single-track linty
while the foundations were being relaid, was put into operation again as a doublt!-
track line in March 1947,
2. 7h(d m srehafling yard 10 kil.onrters yaect of Brest-Litovsk covers an area of 6
square k-h amsters. Conversion frc. normal to broad gauge was executed during
1946-47.
3, The following lines have been rep red and are folly operating:
Ithereon-Drs ropetrovsk (double-track)
Vinak--fomel
4. The double-track line Ewer: Ust Lab:Lnsks!ya to Maikop was put into operation in
Ccto er 1946.
5. A new railway line Pskov-Soltsi-Shirk started operating. in early 1947.
f3ri~es ~,
6. The d&ta -ed road bridge over the Pripyat River at Uoair has been reconstructed,
and it was opened to trD1: fic in Uarch 1946. It is a concrete bridge with a 1oa6.
capacity of 60 tons.
Voronezh-Kharkov railroad over the Don.)
concrete dge with a load capacity of approximately 100 tons which cam
7. The rebuilding of the rill and road bridge over the Don River near voror.a:." -R.
started in January and completed in Noveeber l945, The bridge is of conzreto 50X1-HUM
(tanzbeton) reinforced with iron and has a traffic capacity of 150 tons,. It iY
from 15 to 17 meters wide and 400 Meters long.
est o L"oronevn there is d
C~ent? ~ 50X1 -HUM
J,= AIR
CLASSIFICATION SE
} eMIZa
Vocument No.
_ _-
NO C": r
C
SECRET
D-Ute t 7JQ
50X1-HUM
Declassified in Part - Sanitized Copy Approved for Release 2011/10/20: CIA-RDP82-00457R001400750005-3