PRODUCTION ANALYSIS - SEPTEMBER 1966
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP81T00990R000100160023-1
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
4
Document Creation Date:
December 12, 2016
Document Release Date:
June 3, 2002
Sequence Number:
23
Case Number:
Publication Date:
October 10, 1966
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 155.96 KB |
Body:
Approved For Release 2002/06/14: CIA-RDP81 T00990RB00100160023-1
103/66
ORANDUM POR: Director, NPIC
FROM Chief, Imagery Analysis Division, CIA
SUBJECT : Production Analysis - September 1966
1. The following analysis, related. to departmental intelligence
production within the CIA/Imagery Analysis Division, is presented for
your consideration:
A. Personnel on Board
1. Photo Interpreters
a. Assigned to IAD on 24 September 1966
b. Contributing to PI project production
Not contributing to PI project production
(Includes personnel in training and on
leave)
-photo Interpreters
Office of Chief, Staff and Secretarial Personnel
Production Man-hours
1. Total man-hours expended by substantive
branches (19 working days and overtime)
2. Total man-hours utilized on PI project
production (Includes 574 hours on National
Requirements)
Total man-hours utilized on non-project
production (Includes division support, administration
meetings, training, leave, etc.)
[yctudei icm s amatlcl Approved For Release 2002/06/14: CIA-RDP81 T00990R000100160023-1
25X1A
UGM
Approved For Release 2002/06/14: CIA-RDP81 T0099OR 60100160023-1
centage of total man-hours utilized on
P1 project production.
percentage of total man-hours utilized on
non-project production.
6. Total overtime mart-hours utilized on PI
project production.
Average man-hours expended per completed
project.
C. Projects (For September 1966 Reporting Period)
1. Number re,ning on hand 27 August 1966
(Includes 26 non-substantive projects).
2. Number input during September Reporting Period
(Includes 5 non-substantive projects)
3. Number completed during September Reporting
Period (Includes 8 non-substantive projects)
4+. Number remaining on fiend. 24 September 1966
(includes 23 non-substantive projects)
* The X.I.S. September 1966 Reporting Period,
28 August - 24 September
II, Highlights of the Month:
A. Requirements/Projects (externally generated)
1. 82 requirements were received from the following
requesters:
D l 28 BDP - 23 DDSL T - 31
ORR - 19 WHf SA/LLD - 7 ?M SAC - 7
OBI - 2 FE - 8 QSI - 24
CC1 - 1 SB - 2
COS - 4 FI- I
MM - 2 SOD - 2
NE - 2
TSD - 1
25X1A
Approved For Release 2002/06/14: CIA-RDP81 T00990R000100160023-1
10"L1
Approved For Release 2002/06/14: CIA-RDP81 T0099ORM0100160023-1
Of the above 82 requirements 79 became Departmental
Projects and 3 became National Projects.
Brie gs/ eetings
1. Division personnel presented briefings to, or consulted
with, members of the following organizationst
DDT - ORR, ONE, I
VDP - PID, ' 8OD,
DDS&T - OSI, ORD, P AC
Others - JAZIC. EIC. NSA, 1+RT , JIIRG, USN
2. Briefings of Special Interest were as follows:
were briefed on Chinese
Developments.
Training ravel
1. West Coast Missile Trip
2. NASA Space Craft Center, Houston, Texas
3. Laurence Radiation Laboratory San Francisco, California
4. Savannah River Plant, Georgia
5. Fernald, Ohio
25X
25X
1A
~A
D. General Remarks
2. the Plans and
Technology Assistant.DDI
25X
1A
I7DP
visited IAD to review DDP projects which were in
work, in ZAD during the present reporting period.
Approved For Release 2002/06/14: CIA-RDP81 T00990R000100160023-1
25X1A
25X1A
25X1A
Approved For Rase 2002/06/14: CIA-RDP81 T0099ORM0100160023-1
I attended the Association of
American Geographers Convention, Toronto, Canada.
Personnel Actions
SQL)
Resignations
Total in Process
Placed in Process (September)
Processees Cancelled
Distributiont
Or g - tA3 Monthly Report Folder
2 - Asst. for Plans & Management
2 tAT /PS
Approved For Release 2002/06/14 :_ CIA-RDP81 T00990R0001 00160023-1
25X1A
25X1A