PRODUCTION ANALYSIS - SEPTEMBER 1966

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP81T00990R000100160023-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 12, 2016
Document Release Date: 
June 3, 2002
Sequence Number: 
23
Case Number: 
Publication Date: 
October 10, 1966
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP81T00990R000100160023-1.pdf155.96 KB
Body: 
Approved For Release 2002/06/14: CIA-RDP81 T00990RB00100160023-1 103/66 ORANDUM POR: Director, NPIC FROM Chief, Imagery Analysis Division, CIA SUBJECT : Production Analysis - September 1966 1. The following analysis, related. to departmental intelligence production within the CIA/Imagery Analysis Division, is presented for your consideration: A. Personnel on Board 1. Photo Interpreters a. Assigned to IAD on 24 September 1966 b. Contributing to PI project production Not contributing to PI project production (Includes personnel in training and on leave) -photo Interpreters Office of Chief, Staff and Secretarial Personnel Production Man-hours 1. Total man-hours expended by substantive branches (19 working days and overtime) 2. Total man-hours utilized on PI project production (Includes 574 hours on National Requirements) Total man-hours utilized on non-project production (Includes division support, administration meetings, training, leave, etc.) [yctudei icm s amatlcl Approved For Release 2002/06/14: CIA-RDP81 T00990R000100160023-1 25X1A UGM Approved For Release 2002/06/14: CIA-RDP81 T0099OR 60100160023-1 centage of total man-hours utilized on P1 project production. percentage of total man-hours utilized on non-project production. 6. Total overtime mart-hours utilized on PI project production. Average man-hours expended per completed project. C. Projects (For September 1966 Reporting Period) 1. Number re,ning on hand 27 August 1966 (Includes 26 non-substantive projects). 2. Number input during September Reporting Period (Includes 5 non-substantive projects) 3. Number completed during September Reporting Period (Includes 8 non-substantive projects) 4+. Number remaining on fiend. 24 September 1966 (includes 23 non-substantive projects) * The X.I.S. September 1966 Reporting Period, 28 August - 24 September II, Highlights of the Month: A. Requirements/Projects (externally generated) 1. 82 requirements were received from the following requesters: D l 28 BDP - 23 DDSL T - 31 ORR - 19 WHf SA/LLD - 7 ?M SAC - 7 OBI - 2 FE - 8 QSI - 24 CC1 - 1 SB - 2 COS - 4 FI- I MM - 2 SOD - 2 NE - 2 TSD - 1 25X1A Approved For Release 2002/06/14: CIA-RDP81 T00990R000100160023-1 10"L1 Approved For Release 2002/06/14: CIA-RDP81 T0099ORM0100160023-1 Of the above 82 requirements 79 became Departmental Projects and 3 became National Projects. Brie gs/ eetings 1. Division personnel presented briefings to, or consulted with, members of the following organizationst DDT - ORR, ONE, I VDP - PID, ' 8OD, DDS&T - OSI, ORD, P AC Others - JAZIC. EIC. NSA, 1+RT , JIIRG, USN 2. Briefings of Special Interest were as follows: were briefed on Chinese Developments. Training ravel 1. West Coast Missile Trip 2. NASA Space Craft Center, Houston, Texas 3. Laurence Radiation Laboratory San Francisco, California 4. Savannah River Plant, Georgia 5. Fernald, Ohio 25X 25X 1A ~A D. General Remarks 2. the Plans and Technology Assistant.DDI 25X 1A I7DP visited IAD to review DDP projects which were in work, in ZAD during the present reporting period. Approved For Release 2002/06/14: CIA-RDP81 T00990R000100160023-1 25X1A 25X1A 25X1A Approved For Rase 2002/06/14: CIA-RDP81 T0099ORM0100160023-1 I attended the Association of American Geographers Convention, Toronto, Canada. Personnel Actions SQL) Resignations Total in Process Placed in Process (September) Processees Cancelled Distributiont Or g - tA3 Monthly Report Folder 2 - Asst. for Plans & Management 2 tAT /PS Approved For Release 2002/06/14 :_ CIA-RDP81 T00990R0001 00160023-1 25X1A 25X1A