PRODUCTION ANALYSIS - OCTOBER 1966
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP81T00990R000100160015-0
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
4
Document Creation Date:
December 12, 2016
Document Release Date:
June 3, 2002
Sequence Number:
15
Case Number:
Publication Date:
November 9, 1966
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 158.9 KB |
Body:
SECRET
Approved For Release 2002/06/14: CIA-RDP81 T00990R0QQj 00160015-0
IAD -
9 November
Chief, Imagery Analysis Division, CIA
CT Qrr diiewiA lST -e.,
IRANDUM FOR: Director, NPIC
1. The following analysis, related to departmental intelligence
production within the CIA/Imagery Analysis Division, is presented for
your consideration:
A. Personnel on Board.
1. Photo Interpreters
a. Assigned to IAD on 29 October 1966
b. Contributing to PI project production
c. Not contributing to PI project production
(Includes personnel in training and on leave)
Non-photo Interpreters
Office of Chief, Staff and Secretarial. Personnel
des l u1thg E9d
Production )(=-hours
1. Total man-hours expended by subs;antive
branches (25 working days and overtime)
2. Total man-hours utilized on PI project
production (Includes 318 hours on National
Requirements)
3. Totes, man-hours utilized on non-project
production (Includes division support,
administration meetings, training, leave, etc.)
4. Percentage of total man-hours utilized on
PI project production
Approved For Release 2002/06/14: CIA-RDP81 T00990R000100160015-0
SECRET
25X1A
Approved For Release 2002/06/14: CIA-RDP81 T00990R000100160015-0
SECRET
5. Percentage of total man-hours utilized on
non-project productioi
Total overtime man-hours utilized on
project production
Average man-hours expended per completed
project
C. Projects (For October 1966 Reporting Period)
1. Number remaining on hand 24 September 1966
(Includes 23 non-substantive projects)
2. Number input during September Reporting Period
(Includes 18 non-substantive projects)
3. Number completed during September Reporting
Period (Includes 19 non-substantive projects)
4. Number remaining on hand 29 October 1966
(Includes 22 non-substantive projects)
The I.I.S. October 1966 Reporting Period,
25 September - 29 October 1966
II,. Highlights of the Months
A. ReguirementsJPro;jects (externally generated)
1. 112 requirements were received from the following
requesterst
D DI - 43
ORR - 26
OBI - 2
OCI - 3
CGS 8 7
ONE - 5
DDP - 33
DDS&T -- 36
/SA,/INTELL - 15 SAC
FE- 7 OSI-20
SB - 3 ORD 1
SOA - 4
NE - 4
2. Of the above 112 requrresnents 107 became Departmental
Projects, 4 became National Projects and one was a
supplement to an existing Project.
1 e i P i
W eO ivatu ~ ktnaiic
ibw g a;di, a d ,.
dexiassiiicatioi
Approved For Release 2002/06/ - DP81 T00990R000100160015-0
25X1A
Approved For Release 2002/06/14: CIA-RDP81 T00990R000100160015-0
25X1A
B. Briefing/Meetings
1. Division personnel presented briefings to, or consulted
with, members of the following organizations:
DDI - ORR, ONE, OCI, CGS
DDS' - PE, WH, NE, SOD
DDS&T - QSI, FMSAC ORD
Others - A1C, ., DIA,USAP, SAC,
NIPE, USMC, =
2. Briefings of Special Interest were as follows:
b. General Reynolds, the 0 Panel and the China
Task Force received briefings on AE -testing in
China.
c. The Board of National Estimates was briefed on "N"
class SS construction at Severodvinsk.
d. Various DDP Staffs were briefed on IAD P.I. Support.
Training and Travel
2. Mili?,ary Installations in North Carolina were
v*.s. ted.
25X11
4. Northeastern U.S. Shipyards were visited.
25XIA
D. General Remarks
25XIA 1.
X'Vv t iW~n2 r:uutamatic
I
P.I. Support to project
The DDI and Executive Council were briefed on IAD
Approved For Release 2002/0~~ -RDP81 T00990R000100160015-0
- tr
25X1A
25X1A
25X1
25X1
Approved For Release 2002/06/14: CIA-RDP81 T00990R000100160015-0
briefed students at the University of
on the P.I. Cooperative Education Program.
E. Personnel Actions
EC D
Resignations
Total in Process
Placed in Process (October)
Processees Cancelled
25X1A
25X1A
Distribution:
Orig - lAD Monthly Report Folder
2 - Asst. for Planning and Management
2 .. IAD/PS
1-IAD
4iiwjd0 s
Exst - a i; sal aatematlc
a, u t n e'fl ; Had
d=: ssft?catlan
Approved For Release 2002/06/14: CIA-RDP81 T00990R000100160015-0
SEC ET