THERMAL ELECTRIC POWER PLANTS IN THE USSR 9/57 251 P. ILLUS. MAPS PHOTOS.

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP81-01043R002500170001-1
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
258
Document Creation Date: 
December 23, 2016
Document Release Date: 
September 3, 2013
Sequence Number: 
1
Case Number: 
Publication Date: 
January 29, 1958
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP81-01043R002500170001-1.pdf19.31 MB
Body: 
Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 STAT Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 1. Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 \ I " THEiMAL ET.F.CTRIC POWER PLAT,ITS IN THE U.S.S.R. Report No. 92 VOLUME I COPY 2 attworf To 811(100.41111-11110 "'FORMATION CONTROL NT IIIRARY SERVICES SECTION Ali Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 ? ? ? TM/NAL MAIM= PONI2 KAM or TM 11?11?11.2. Intosstion Propose& 127 Intomation etrootoral /sysinooring flootion Library of Coogroos For Mated item' Air Pares Soptiobor 1957 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 gra, TABLE OF CONTENTS te: Volume I Page List of Plates iii Bibliography xi , Preface xv Introduction Chapter I. General Layout of the Main Plant Building 9 Four Types of Design 11 Chapter IX. Construction of the Main Foyer Plant Building 36 1. Building Materials 36 2. A. Construction Treatment of the Power Plant Building _36 B. Construction of the Mlin Power Plant Building of the First Type Design 38 Structural Types 38 e Wall Coverings 38 Roof Construction 38 Roof Coverings 38 Floor Construction 38 Crane Girders 38 Overhead Bridge Cranes 38 Columns 39 Foundations 39 Bay Lengths 39 Frames Supporting the Smoke-eliminating Installations AO Construction of Some Main Power Plant Buildings of the First TVpie Design 40 Ivanovo ORES 40 Stalingrad ORES 41 Zuyevka ORES 41 Kuznetsk Ts , Stalinogorsk ORES 41 First Type Design of: Poured-in-place Riinforced Concrete with Welded, Rigid Steel Skeletons 42 C. Stacks 43 Brick Masonry Stacks 43 ' NOnolithic Reinforced Concrete Stacks _1. Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 D. Construction of the Mein Power Plant Building of the Second Type Design Structural Types Reinforced Concrete Frames with Rigid Welded Steel Skeletons Steel Frames Wall Coverings Roof Construction Roof Coverings Roofing Floor Construction Overhead. Bridge Cranes Reinforced Concrete Columns Foundations Stacks Niamples of the Second Type Design Neevetay GRIAS Stalinsk Tiffs E. Construction of the Mlin Power Plant Building of the Third Type Design F. Construction of the Mein Power Plant Building of the Fourth Type Design Steel Frame Construction 44 45 45 45 46 46 46 46, 46 46 47 47 47 47 47 48 48 Monolithic Reinforced Concrete Construction with Rigid Welded. Steel Skeleton Reinforcement 50 Precast Reinforced Concrete Construction 51 Mixed Type Construction 57 Examples of the Fourth Type Construction 59 Ammindtx. "Principal Regulations Governing The Design of llectric Power Plants" 60 Volume II Chapter III. Some of the Principal Soviet Power Plants. Data and, Photographs ii 90 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 12 LIST Of PLATES Title Nap of District Electric Power Plants Hap of principal power plants at the end of the let Piatiletka 6 Nap of Regional Power Plants in 1936 8 Capacitq of Regional Rlectric Power Plants in 1936 7 Plea of Oorlidy peat-firing GUS 14 Plan-of Mature peat-fixing GENS 14 DubrOvka peat-fling ORES: Section through the main building 15 Shteravka ORM 'Plan of power plant main building 17 Shterovki ORM Sit* plan , 16 iirenovo peat-firing GM. Plait and eeotaon 1.8 Nodel of a 5 x 56,000 kv. puleirisied ooal-firing 14 G. 8.ation, 19 1 Model of a 200,000 kw. peat=firing weir plant i 20 Zwevka 0131*. *Alan through the boiler house 1 and blanker iieistia 21 Zuyevka 8. seition thrOugh the boiler house and; 1 feidwater pump ?tioe 22 Stalingrad GM. Section thrOngh the nail. biladiiIS 23 Enanetsk TVs; libation througb: the mein 'plant 25 I 31 5 building Eueditsk TVs. Pian of power plant Stalinogorsk Olat. Section thief:ash the main building Stalinogorsk GRES: Drawing of the plant Nessfet4 GEM Diction through;-:the main bUilding Nem*, GRES. Plan of power plant main 'structure Stalinak ()MOSS No: 11) TETs in Moakia. Section through the in building iii Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Plate No. 15 15A 16 16A 17A 17B (Fig.1-3) 16A (Fig.1-2) Al???=1.6.?????????????????????????????????????? Title Orsk TETs. Section through the main building Orsk TETs. plea of the main building Cherepet' GRES. Section through the main building Cherepeti GRES. Plan of pow?: plant main structure First Type power plant design. Section through the main building Structural details of reinforced concrete frames shown on Plate 17A TUrbogenerator foundations of monolithic reinforced concrete Individual foundations. Turbogenerator and its auxiliary equipment foundations underneath the turbine hall Type of construction with abasement floor built on a monolithic reinforced concrete mat. Turbo- generator foundations underneath the turbine hall 33 32 35 65 66 67 69 19 (Fig.1-2) Stacks - brick and reinforced concrete 70 20A Second Type power pleat design. The load bearing monolithic reinforced concrete transverse frames 71 20B-20E Structural details of reinforced concrete frames (Fig. 1-9) shown on Plate 20A 72-75 21A (Fig.1-3) Construction of the main power plant building of the Second Type. Design in steel 77 22A (Fig.1-2 22B 22C (Fig.1-4) Structural details of the steel frame principal joints in the main power plant building 23A Construction of the main power plant building of the Fourth Type design in steel Conversion tables for steel sections shown on plate 21A, Fig. 1 Construction of the main power plant building of the Fourth Type design in steel Conversion tables for steel sections shown on plate 22A, Fig. 1 iv 76 79 78 so .? Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 ; 23B (Fig.14) 2hA-214B (Fig. 1-8) 25A-25D (Fig. 1-9) 251 26i 351` 27 27k 27B 27C 28 Fourth Type of power plant design - two methods of frame eonneotion Construction of the main power .plant building of the Fourth Type desigi in monolithie reinforoed ocnerebsidthielded rigid steel skeleton reinforce- ment and strucSura details Construction of the main power art building of this Fourth t/Pie 41411SP in precist reinforced concrete and structural details Nein, power plant 'building of t* Fourth Type - alternatives of *instruction ' stars MO. Side view of the 9ass and peat delivery trestle. Obabnra GROB. View froa the turbine hall side Mature GRZO. Partial furter/city/ewe of the toiler house No. 2 Ohabara GRIN. Partial interior view of the turbogenerator hall Mature ORZO. Partial interior view of 2nd section of the tu0ogenerator hall Mature. OW. 'Partial view of the transformer bank Mature. WM Partial exterior views of a substa? tion and steel structures carrying high tension wires ruhrovka GEM General view 1Dubtovka Oide view of the plant 'bowing steel trestles for peat delivery and the toiler house DuhrovkaGO114 Partial view- of the GROB showing steel trestles for peat delivery ttibrovkGRZO. P;Artial interior view of the turbine.hall GorskiyGRZO. General view of the toiler houses first port of construction ? Declassified in Part - Sanitized Copy Approved for Release 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Plate No Title 28kt Gorokiy CUM. One of the GPM buildings under oonstruction 107 ?ors)Ay Gans Partial interior view of the turbine hall 1.08 Gorsidy GM. Partial. interior view of the turbine bm"13. Kramsbira CUM General view of the boiler boas* and the open, air substation 111 Yashiro MSC The first section of the Kashira GM 112 Tashi= GM. Tbe em000nd section of the Xasbira GUS under construetion 113 Xashira GM. A 50,000 kw. turbogenerator built 'by Irlektrosile 13A the plant &whirs Gan. Partial interior view of the turbine bell 11,5 2RX Kaabira GM. Coal pulverising equipment 116 Zir Kasbira MO. Partial view of an outdoor substam tion 117 R913 Kashira GEM. Partial view of the 115 kw? out substation, ' 118 2RX Xasbire S. Btep-up trausfromer honk 119 30 Shterovka GRIM General. view of the plant 30A Eibterovka, GM. View of the main structure from the south 122 30B Saterovica GM. General view of the GM 123 300 ahterovka Glin. Boiler rocs under construction 30D ahteroVkit GXXS, The third section of the plant ? ? under sonstrection ... 30K Xatercivica GM, Partial interior view of the turbogenerator hall I -? 301 Nhterovka GM. Partial interior side view of the generator ball Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 .1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 p??? Plate No. Title 30GI ilktorovka MS. Partial interior view of the turbine balls second multi= 32 Zuyevka W. View of the MS and open-air substation 130 Zuyfrvkat GM. General view 131 Zuyemita GM. 190,000 Jar. 'turbogenerator at the piittiaLly reoonatructed Zweite, OPSS 132 Ivanovo (formieri,y Ivanovo-Vosnesensk) WB. aide view of the mil building, under eanstruction 134 32k Ivenovo (formerly Ivenovo-Vosnesensk) WSW Conittuetion Work at the Ofl 135 Ivanovo (fonierly Ivanovo-Vosneriensk) GM. Hain structure in the adviinired stage of coostrudtion 136 Ivanovo (formerly Ivonovo-Vosneseniik) GIMS. GNU under oceurtruction 137 Ivanovo- (familiarly Ivanovo-Vosnesenek) ONNS. Side vier 138 IVIMICRO (formerly Ivanavo-Vosnemensk) OM. View of the alga building and steel Awl delivery trestle 139 33 StaLinoiprsk MS. The MS under oonstruttion. 141 33A Stalinogorsk MS. "Stalin" OM under tionstrueticn 12 338 Stalinegorsk GM: Ixterior view 3A3 33c Stalinogorsk Ixtrorior view 144. 33D Stalinogorek Ausilissi Power Plant. General view 114.5 331 Stelinogorsk Aurilimy Power Plant. Partial view of auxiliary pot,* pilot 146 Stalingrad G. Hain building tinder oonstruction 1e8 Stalingrad OUR. Partial exterior view 149 Stalingrad. G. Nxterior view vii Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 .r. Plats No. Title 34C 35 35k 35B 350 35D 36 36A Stalingrad Tractor Plant Power Station. View of the 'boiler room White Russian GRKKa White Russian OP*. plant White Russian MS. White Russian ORM White Russian am General view The first section of the Extrior 4neieV The GUS under construction Partial. Viet, Of the roof Beresniki Tere. Beresniki MS under oonstructicn Dereiniki TM. Partial exterior view of the lift sorting the Deresniki Works 36B Beresniki =Ts. ixterikr VieV of the the TIM serving the Bereki Chia teal tiorke 36C Bersniki Mee TUrbogenerator hall 37 Solikamisk G. Partial. view froa the Vindor of another building 38 Kunnas* Mit. Central power etlition at the Metallurgieal Plant in the proCeisof construction 3at Xasnetsk ma. Central power station at the Metallurgical Workil 3tt Kuznetsk STs. Central power station at the Metallurgical Wozks 380 Nalinetiok m.. Portisl view of the TSTs 3) KuinetskTs. Partial view of the =Ts shotring the spray pond 39 Chelyabinsk 0E111? a under construction 39A Chelyabinsk GM. General view of the first Nation nearing oomplation 140 Magnitogorsk 011S. Aerial view* 0118 under construction ' Magnitogorsk GIL GIS under construction 152 155 356 357 158 160 161 162 163 165 167 168 3.69 170 171 173 1714. 3.76 177 viii Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Plats No. Title Page 40B 41 43A 42 43 43A 44 45A 14.5s 450 45D 45B ,47 ?47A 473 48 49 Megnitogorsk (S& Partial exterior view lersaatorsk GIB. Aerial view Xrassatorsk GIS. Water cooling towers Nesterovo TaTs. Partial exterior view averdlorisk TaTs. ;Partial.exteior view of the serring "UrIlvashstroi" (Ural Machine Building Barka) Sverdlovsk TUC Fuel Supply trestle leading to the bunker ga4exy of the lift Yoroshilorsk G. General vivivt-of the GIS serving the Votoibilar Metallurgical Plant aerator GM: aerator GSM Saratoni? G. eonttruCtion Barstow GM. aerator Gin. aerator MM. Vete& The MI under Son*Um:Um The GIIN under ?obstruction Partial .view of GM under faia under -oonstrueition General view Partial view of the steam piping Yaroslavl.' Gitaa. 'aide view of the boiler bowie Yarol TNRs at the Rubber and Asbestos Plant. Partial seXterior view Shbring forced .0onerete peat delivery treStla 199 Baba "Veins" pestle Gana. *Oral Vic! 231 Baku "Er110211111, Zresda" G. d. riisr 202 Mat *mane GIS Partial view of the plant and 100 kw. openileir substation:. 204 Novorosivisk G1MS? Front view 2)6 'Voronezh =NC Partial vier of he Gala abA open-elt substation 208 Kazan' Ms. Partial exterior view !.10 178 183 3.83. 183 185 186 188 190 191 192 193 19 195 197 ix Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Plate No. Title 50k Kasen' me. Partial exterior view 51 Moskva TM "Stalin". Genera view 51a Moskva TZTs "$tate. Partial view during construction 511 Moskva GIN wilsidovioh% General view 51B MoekveGIS waildovieh". Bide view 510 Moskva GNI "Saidoviohn. Ixterior view of the boiler house 51D Moskva GIS wiltidovioh% o uct9i detail 511 Moskva High Pressure TNTs. General view 517 Zlektrogorsk wIlasson% Side view 52 Artois GRZII wit/ROW% Side view 52k Art= GM *KIROV". Nide view 53 Mironovskera OMNI. Interior view of the turbine ball 81avyansk GM. Partial interior view of the turbine ball Slogyansk GEM Partial interior view of the turbine hau 55 Cherepet' OWL General view 55k Cherepet1 OEM Partial interior view of the turbine 55B Cherepeti GSM Turbine bell housing s 150,000 kw. turbine 211 213 21k 23.6 21.7 218 219 221 223 225 226 228 230 231 233 2311' 235 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 4 BIBLIOGRAPHY iart.hor MC Call lb. Akademiya Arkititektury lt3R Antipoy, I. P. Carr, T. H. Collective Study Collective Study Donchenko, V. 'Z. Ermakov, D. A. ? Flakserman, Yu. Plaksermen, YU. H. Gaffert, G. A. Glavelektro Glavnoye Elektricheskoye Uprevleniye Glazunov, A. A. M.2.122090A. Arkhitekturaprogysblennykhsooruz- heni# (Architecture of Industrial Plants) 1956. Arkhitektura elektrostansiy (Power Station Architecture), 1939. Power Station Civil Engineering and Building Works. Rugeley, Stafford- shire, 1944. Electric Power Development in the USSR, 1936. 15 FAseine Schritte (Fifteen Iron Steps) Berlin, 1932. Piatnadtsat? let leninskogo plena elektrifikatsii (Fifteen Years of the Lenin Electrification Plan) Opyt eksploatatsii kashirgkoy GRES (tashira GRES Operation Practice), 1956. Elektrifikatsiya SSSR (Electrifi- cation of USSR) 1931. Kiektrokhoziaystvo SSW k Dachau 1927,28 g, (Electrification of the USSR Toward the Beginning of 1927-28), 1928. Stet" Power Stations 4-th ed. New York, ? 1952. Szhiganiye antratsitnogo shtyba na ghterovskoy MS (Cula Firing at the Shteravka GRES) 1929. Statiatika elektricheskikh stantsiy SSW 1922-1926. (USSR Power Station Statistics), 1927. Energetieheskiye systemy. (Power Engineering Systems.), 1952 xi A1io71463.o Til4581.A5 TK1.191.C34 TIC85.86 DIC.266.F63 21135 .D6 TIC1.286.1C4E7 micB5.P58 85 .6 T.7400.G3, 1952 IN1193.R9S5 Ticu93.B9A5 M5-G5 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part- Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Anthor Title: DLC Call. r Diknographs cont4.) Gosudarstvennsya Nalissiya pa Elektrifik.atsii Rcesii Xemenetskiy, X. 0. Plan Elektrifikatsii RSIPSR, 2-nd. ed. 1955. Perme russkiye elektrootantsii (First Russian EMectric Stations) 1951. 14ar1ixt, A. B. Budushcheye elektrifikatsii SSSR (The Future of Elektrificatica in the USSR) 1956. Xinisterstvo Stroitelt at Pavil'yczt "Inergeticheskoye Elektrtostantaiy SSSR stroitellatvo SSSR" (Exhibitice Pavilion "Power Engineering Building in the USSR."), 1956. Worse, F. T. Power Plant Rogineering and. Design, 2-nd ed.. Neir York, 1942. Pafos Osvoyeniya, (Pathos of a site rin g ) 1934. Boyevoy marshrut elektrifikatsii (The Fighting Path of Electrifi- cation) 1933. Plan GOELRO I ego osushchestvleniye (=MO Plea and Its Realizations) 1952. lifbskovokoye Biuro Inzhenerov Odnoletko, 14 Rabinovidh, Sherthov, S. F. Sizin0 P. R. Streletskiy, N. S. Telezbnikcri, V. E. Veytkar, F. Leninsko-stelinskaya elektrifikatsi- ya SSSR. (Ieninist-Stalinst Electri- fication of the U.S.S.R.), 1951. Opyt eksploatatsii zuyevskoy GRES (Zuyevka GB erational Practice), 1954. Staltnye kcestruktsii (Steel Structures) 1952. Ftuidatrenty pod. oborudovaniye elektrostantsly malykh I srednikh moshchnostey (Foundations for tbf. Equipment of &All and. )dim Capacity Power Stations.) 1956. sozdavalas' elektrifikatsya stray sovetov Now the Electrifi- cation of the Country of the Soviets Was Developed) 1_947. Xi i TK85.1178, 1.955 1193 .B93 TK85 TK1193.R916 .I19t, 10e2 T26.R9t6 20193.R903 11850P2 T05.847 13.93. 185 no.611.875 T581.2 5.* Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03 ? CIA-RDP81 0104.'1Pnn9cnni7nnr,4 4 Declassified in Part - Sanitized Co .y Ap roved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 0110. Author (toograkPlis gcAtid) Tinter, A. ;IV Vinter, A. V. Welts, V. I. Welts, V. I. Welts, V. X. iLCCa1b.O? Itogi Iperspektivy rasvitiya oovetskay energetiki (Results of and. the Outlook for Development of the Soviet Poser Engineering) 1950. Elektrif1utsiya nashey strany 2-nd. ed. (Electrification of Our Country), 1956. Elektroenergetiks MOR T= 1; (Electric Pcver Engineering in the USSR), Vol. I, 1934. Electric Power Development in the USSR, 1936. Elektrifikataiya narodnogo khoziaystva SSSR (rhe Electrifi- cation of National Establishment in the USSR) 1948. Welts, V, I. Ot plans GOERLO k stroyksm koMmunizma (From the Gat= Plan to Great Construc- tions of Communism) 1952. TK85.V5 TK85.V491 1956.' TK1193.B9E4 N85.36,1936 85.w4 TK85.W42 Periodicals Arkhitekture. SSSR X, 1936. Ecommic Finley of the Soviet Unice 1930-33. Elektricheekiye stantsii, (Electric Power Stations), 1929-1954. Elektrotechnische Zeitschrift (ElectrabechnicalAlgasine), Berlin, 1930. Prozhektor, 1930-1934 Soviet Union, 1950-1955 gtroitel'nays PranYelligprit%* Teploenergetika, (Hent-paver Engineering) 1957. USSR in Construction 1930-1937 xiii NA6.A74 HC331Z3 TK4.E725 TE-3.E8 Unclassified DK266.A20574 Ts4.585 1ez257.A1u3 Declassified in Part - Sanitized Co.y Ap?roved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170flo1_1 Declassified in Part - Sanitized Copy Approved for Release . 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release . 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 JIBBFAci This report is designed to provide the analyst with a brief but comprehensive account of the layout, structural design, and structural details of steam-powerod electric power plants in the Soviet Union. Included are some plants producing both electric power and steam for heating. The subject is extensive, and the time (3 months, including extensions) for preparing the work is limited. Seventy-five per cent of the electric power produced in the USSR comes from thermal plants. Reports on 45 Soviet hydroelectric installations made up neatly half of a two-year program completed by the Air Information Division in 1955. It was obvious from the outset that a strict limit must be placed on the coverage of the present work. The Structural Engineering Section therefore decided to exclude the following phases of the subjects Small plants, especially those serving single industrial installations: Design of the mechanical and electrical equipment of the plants, even of the boilers, turbines, and generators; Water and fuel supply installations; Layouts of electric systems; Transformer and switch yard.; Transmission lines and substations; Structure of cooling towers (views of several examples of these, howeve5appear in the plates). Only large steam turbine power plants are included in the report. The scanning of possibly useful periodicals, too, had to be cut off where the probable take was too thin to justify the expenditure of man-hours. The coverage exploited was still extensive, as may be seen from the Bibliography. A general list of titles explored (whether fruitfully or not) is on file with the SES copy of the report. In the introduction, the general course of the Soviet electrification development is briefly outlined. The first chapter deals with the layouts of different sections of the main power plant building. The four basic types of widely used plant design are described, and examples of some existing power plants typifying these different layouts of sections are shown. The second chapter analyzes the structural details of the main plant building. XV Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 The third chapter deals with separate large Soviet thermal power plants giving for each all available and some estimated data and photo- graphic illustrations. A word of caution is in order concerning data on plants in those parts of the Soviet Union that were overrun by the Germans in World War II. Al]. existing power stations in those regions were presumably demolished by the invaders. It is understood that most of the early reconstruction work was based on the original designs. This Section, however, has no information as to the total amount of new and updated design work that went into the reconstruction effort. .It is therefore anybody's guess whether the data in this report on any plant in regions which were under German occupation represents what is there now, or whether it has been replaced by a more modern installation. xvi 4 ? Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 INTRODUCTION The electrification of Soviet Russia went through several stages in the course of its development. The original electrification plan "Goelro" (State Commission for the Electrification of Russia) was approved in 1921 and the construction of electric power plants received first priority. The guiding principles of the "Goelro" plan were: the restoration and reconstruction of old power plants, (part A of the Plan); the construction of 30 large regional power stations, mostly thermal (GRES), built in places where local low-grade fuel resources were available (peat, brown coal, anthracite calm, etc.); and connected with high-tension lines to form several main regional electric power grids (part B of the Plan). Part A of "Goelro" plan was fulfilled by 1923, and part B around 1930. In the Filrst Piatiletka (1928 - 1932) the original "Goelro" plan was extended, first by the increase of installed capacities in the already existing plants and secondly, by building 20 more power plants, almost all thermal. (See maps on Plates 1 and 2) The main building of these power plants built up to the end of the first Piatiletka was usually a poured-in-place reinforced concrete frame structure with masonry curtain walls or brick panel walls and steel or wooden roof trusses. Columns were rigidly connected to poured- in-place pile-supported foundations and were entirely separate from the special pile-supported poured-in-place reinforced concrete foundations for the machinery. Declassified in Part - Sanitized Copy Approved for Release 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 ?? Declassified in Part- Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Up to the end of the First Piatiletka very few hydroelectric stations were built. The main reason for this slow-down was that previously made geological surveys proved to be inadequate for the construction of dams and that more accurate surveys and plans were necessary. Beginning with the Secon0 Piatiletka (1933 - 1937) the construction of hydroelectric stations was started on a much larger scale. The thermal power capacity was further expanded, mostly by additional installations in existing plants, and by building not only some new large power plants but also smaller local electrical stations which were switched into the steadily expanding regional grids. Larger new power plants were built, mostly in cities and around industrial centers. (See map on Plate 3). The poured-in-place reinforced concrete type of construction was being gradually replaced by construction with precast reinforced concrete elements, such as columns, beams, and girders; the plant foundations and substructures, however, were still built of monolythic reinforced concrete. This trend continued during the Third Piatildke (1938 - 1941/. During this time larger power and heat-and-power stations were built in the East, in the Ural Mountains, in Siberia, and in Central Asia; this building program in the East was especially intensified during the War. During the War, precast reinforced concrete elements were not used in the construction of power stations because the precast fabricating plants were not operating. ?2? Declassified in Part - Sanitized Copy Approved for Release 50-Yr 2013/09/03 ? CIA-RDP81-01043R0075on17nnn1_1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 After the War, during the Fourth Pia11104 (1944- 1950) the first task was to rebuild the destroyed power plants. Next, rural electrifi- cation was greatly increased and extended whenever possible by the con- struction of mall local hydroelectric plants. During the nfth (1951 - J.955) and the present Sixth (1956 - ) Piatiletkas large hydroelectric projects were carried out. The share of electrical energy produced by hydroelecrric plants rose to 25% of the total. In the design and construction of new thermal power plants more standardization was attempted. The power plants are under the Ministry of Electric Power Stations and plane for new stations are designed by the Institut Teploelektro-proyekt. The Institute prepares suggested master schemes for thermal plant con- struction. Precast reinforced concrete elements were prevailingly used in construction of plants; also rigid welded steel reinforcing skeletons which form the main reinforcement for the concrete frames of the building. Certain elements, usually roof beams, are of prestressed reinforced concrete. In the design of power plant foundations, instead of providing a separate foundation for each piece of auxiliary equipment, the design called for a basement with a heavy reinforced-concrete slab foundation. Only (1) the columns have separate footings, and (2) the boilers and turbogenerators rest on separate monolithic poured-in-place concrete blocks. -3- Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 440' With boiler efficiencies increased so that a single boiler is sufficient to serve one turbogenerator, the design of thermal power plants has become simpler. The turbine hall is parallel to the boiler house, the turbogenerators are placed lengthwise to the turbine hall, and since one turbogenerator set longitudinally occupies the same space as its boilers, the condensing equipment being placed underneath in . the basement, a block system boiler-turbine can be introduced. Instead of a central fuel preparation system (pulverizing for coal and milling for peat) at present each boiler has its own separate fuel preparation unit. Because boilers and turbogenerator sets are now (19516) larger and heavier, power plant construction has become stronger, foundations heavier, travelling bridge cranes of greater load-lifting capacities (100 - 200 ma tons), and consequently columns and girders stronger. The cross-section widths, however, of the boiler and turbine rooms can remain unchanged. One of the building's end walls is made as a temporary structure to be moved in case the plant is extended for the installation of new boiler-s turbine block units. The unit capacities of these new boiler-turbogenerator sets have been increased. The boilers presently (1950 installed* work at higher pressures (up to 300 atm.) and higher temperatures (up to 650?C = 1200?F), and turbogenerators can be installed at higher capacity ratings (up to 150,000 kw.) -4- Declassified in Part - Sanitized Copy Approved for Release 50 Yr 2013/09/0 ? nrvl nn Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 ? ? ? MAP OF DISTRICT ELECTRIC POWER PLANTS AT THE END OF THE PIATYLETKA (OCTOBER 1ST. 1933) INDICATING POWER PLANTS WORKING IN 193b, THOSE BEING ENLARGED AND OTHERS UNDER ERECTION 1011330110101048310k Nizisui S&LOA 300130733:0044. it:0150W .piatr*, 58 44.030490 PERK Ai/epic's/ te-reithrat C1441111101311 I Vorp.rof C???54.44) ? 141.00 1iiiimmit1304 PCIETISLAV Tovr .s.sivslit 30341a00:(114 toc_4L):4: h. 11040 lutitalaravUt 14111$ I 114ACIIIT0001111 8111ANSI. ssssss 3 0 I -??? .1.);?.0.1 558 1 II II A I Km; Hoc 17240084 IC1115/100.111 DESIGNATIONS I. 1933 ?Mlo A0W6 140?111.4(1 sssss . 0 I* 844,161,4. 0 0000000 1,1 .1., A I. 0 "mos eno e Nell. 1.? 04,4.4 letloeu, 160 8.0 si as nem... no tea, ee *1941 4840?50 ?post C C-844 ea ?41 cat C-448. C-4180 fla, C C-584 51 41.48. 4 0-441 ttttt le Coal P (-48841.44.4. O 0-444? Co, ten 6.4 ttttt 0;414 Oenni I. lilt ISM/JIMA) .? ? ttttt 161.4, o? o? ttttttt ?? ttttttt SA ISAN 44111. . ASUl Alt _ S Goon Dom it 22 V 1104303 5 10 xia4,0 Acol:1.1111 M2" Aut. TOPANAVAN Doc RAG IT 40 41 NO at. 10.4.4.1050.454?350 PIA! S 1. -5- ;.? Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release . 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release . 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 LIST OF REGIONAL ELECTRIC POWER STATIONS IN THE USSR IN 1936 POWER STATION 1. NIVA HYDRO-ELECTRIC STATION CAPACITY 30,000 KW POWER STATION 30. OTHER CENTRAL POWER STATIONS OF THE DONBAS CAPACITY 45,000 KW 2. KONDOPOGA HYDRO-ELECTRIC STATION 4.500 1. 31. NOVOROSSISK REGIONAL POWER STATION 20.000 * 3. LENINGRAD POWER STATIONS 378 000 ? 32. WELDON HYDROELECTRIC STATION 23,000 ? 4. VOLKHOV HYDROELECTRIC STATION 66,000 * 33. RION HYDRO-ELECTRIC STATION 48,000 ? 5. LOWER SVIR HYDRO-ELECTRIC STATION 100,000 * 34. ZEMO-AVCHALI HYDRO-ELECTRIC STATION 25,000 * 6. MOSCOW POWER STATIONS 314,000 ? 35. DZORAGET HYDRO-ELECTRIC STATION 22.500 ? 7. SHATURA REGIONAL POWER STATION 180.000 ? 36. BAKU REGIONAL POWER STATION 176.000 ? 8. KASHIRA REGIOAAL POWER STATION ? 186.000 * 37 KADYRYA HYDRO-ELECTRIC STATION 13,000 ? 9. STALINOGORSK REGIONAL POWER STATION 100.000 ? 38. BURJAR HYDRO-ELECTRIC STATION 3,300 ? 10. KALININ POWER STATIONS 19,000 ? 39. BOZ-SU HYDRO-ELECTRIC STATION 3.000 * 11. WHITE RUSSIAN REGIONAL POWER STAT)ON 20.000 ? AO. TASHKENT POWER STATION 3.500 * 12. VORONEZH REGIONAL POWER STATION 24.000 ? 41. FERGANA REGIONAL POWER STATION 8.200 ? 13. BRIANSK REGIONAL POWER STATION 22.000 42. NOVOSIBIRSK HEAT-AND-POWER STATION 35.500 ? 14. KIEV POWER STATION 64.000 ? 43. KEMEROVO REGIONAL POWER STATION 48.000 ? 15. KHARKOV POWER STATIONS (TOGETHER WITH 44. CHEUABINSK REGIONAL POWER STATION 150.000 * KRASNOZAVODSK HEAT-AND-POWER STATION) 98.000 ? 45. KIZEL REGIONAL POWER STATION 98.000 * 16. KRIVOI ROG REGIONAL POWER STATION 44,000 ? 46. YEGORSHINO REGIONAL POWER STATION 24.500 * 17. RYKOV POWER STAT/ON 6.000 ? 47 SVERDLOV REGIONAL POWER STATION 11.000 * 18. KAMENSKOYE POWER STATION 48.000 * 48. PERM REGIONAL POWER STATION 8.000 * 1 19. DNIEPER HYDRO-ELECTRIC STATION 558.000 * 49. MIDDLE URA'-S REGIONAL POWER STATION 50.000 ? 20. ODESSA POWER STATION 37,000 * 50. BEREZNIKI HEAT-AND-POWER STATION 93.000 ? 21. NIKOLAYEVSK POWER STATION 13.500 ? 51. KUIBYSHEV REGIONAL POWER STATION 27.000 ? 22. SEVASTOPOL REGIONAL POWER STATIONS 8.000 ? 52. STALINGRAD REGIONAL POWER STATION 75.000 " 23. SIMFEROPOL CITY POWER STATION 1.700 ? 53. SARATOV POWER STATIONS 22.000 ? 24. YALTA CITY POWER STATION 1.300 ? 54 KAZAN POWER STATION 24.000 ? 25. ROSTOV POWER STATIONS 128.000 ? 55. GORKI REGIONAL POWER STATION 204.000 ? 26. KRASNODAR REGIONAL-POWER STATION 10.000 ? 56. IVANOVO POWER STATIONS 113.000 ? 27. SHTEROVKA REGIONAL POWER STATION 152.000 ? 57. VLADIMIR HEAT-AND-POWER STATION 3.500 I. 28. ZUYEVKA REGIONAL POWER STATION ? 200.000 ? 58. YAROSLAVL REGIONAL POWER STATION 36,000 ? 29. NORTHERN DONETS REGIONAL POWER STATION 65.000 ? 59. ARCHANGEL REGIONAL POWER STATION 16,000 ? ITHE NUMBERS AGAINST THE STATIONS IN THIS LIST CORRESPOND TO THE NUMBERS SHOWN IN THE CHART) CAPACITIES IN l OF REGIONAL 2011E1 STATIONS ni ME USSR IN IME MOWN Off MOS KATE 2. PLATE 3. ? ? ? Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 ? ? HE GC)ELFIC) PLAN FULFILLED AROUGH CHART OF THE REGrONAL ELEC, (RIC ??;" POWER STATIONS OF THE uSSR IN IN F, V M SKI. t7I .,??. . rApie44 . - . ,-5:1114i:10: ;). - i ? -,.C."' - i` Ckl? KAUNIN . *MOSCOW 4 58' 4 -.. 6 , ?4Kov 54 v 21 chal , . ALI...A5R , ietwgi ..f!O.BON,.EZ....,.H..;:t7:. j 77c116".b:,. ' ,. ...31-4,Ev 111 .. 48Ag 416 1 -boltia:s' ..AST2r& 3 "112) 19 22 30 .. ? -.. .- f ,.. AN, , - PERM . , 3 cil6 .. rtiLu.igrect....... . ictLE11, ? .rtla 29 VA Azov cutild'at? ?..,-. , . , !I i 46 EllEcon'.R2ON?DON 25 -, 4 Y1,01105115. pi u im?-? 1 fs - sith6 KUIBTSHEV.(13AMARAI ? 442 Ag .4 OAR 26 (STAUNGRAD ,- 1` - ... CAIS.44 -.,, ,. CHELIABINS., 2 0110ROLONISK 45 .? Oft 1?. ORENBURG 3332 - A6T,RAKHAN 0.3NuuDzE 34 `TIFIJS' 35 36 ? I ApU U CtilEi 43 ?.KEIAEROVO CO6 42 NOVOsiBtRsK KRASNOMRSA . OF REGIONAL ROM STATIONS IN TER USSR IN 1936 Source: USSR in construction, 1936, No. 6: Dx26741u3 EEN;La- Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 te? -evy" ?-?;74.. CHAPTER I GENERAL LAYOUT OF THE MAIN PLANT BUILDING The larger thermal electric power plants in the USSR have steam turbines as primery movers. Steam piston engines have been completely; discarded, gas turbines are still only in an experimental stage and Diesel motors are used in power plants of smaller capacity serving local needs. The layout of plants has been influenced principally by the kind, efficiency and size of equipment installed, by the kind of fuel fired, and also, to certain extent, by the type of the station, i.e. whether it a.. condensingor a heat-and-power producing plant. The general scheme of a plant layout is mainly centered on the proper placing of the boiler house as the most complex section of the plant and on the grouping of the turbine hall and other sections in relation to it. When the steam turbine was introduced as the prime mover, the total capacity of several boilers was necessary to produce a sufficient amount of steam for one turbine. In the first peat-firing plants built in the twenties therefore, we find that either: 1/ the boiler rooms are placed at right angles to the turbine hall; or 2/ the turbine hall is placed parallel between two boiler rooms. Examples of the first type of arrangement are: 1/ the first priority of the 204,000 kw. Gorokiy ORES (see Plate 4, Fig. 1) which has three double-row boiler rooms, 6 boilers to a turbine; 2/ the first and second priorities of the 180,000 kw. Shatura ORES (see Plate 4. Fig. 2) which has three single-row boiler rooms, 0 boilers to a turbine. -9- :Lao Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 .7-14,1471:Q4:144 'rt.` ; ku.,-t. An example of the second type of arrangement is the 100,000 kw. Dubrovka GRES where the turbine hall is placed between two boiler rooms and parallel to them Owe Plate 5), With the rapid advance of boiler engineering, the improved boiler.. turbine ratio made it possible to lay out electric power stations with the turbine hall and one boiler house parallel. At first, when 2 boilers were still needed for one turbine, the boilers were arranged either in a double row, as in the 152,000 kw. Shterovkla pulverized-coal ORES (Plate 6) or in a single row but with somewhat spread-out turbo-generator sets as in the peat-bumiling 120,000 kw. Ivanovo GRES (see Plate 7). Further increase in boiler capacities made it possible to design stations with one boiler installed per turbine. The turbogenerator sets are arranged lengthwise to the axis of the turbine hall in all stations, with the exception of the first priority of the Shatura and the Dubrovka plants, where the turbogenerators are installed crosswise. The main building of a thermal electric power (or heat-and-power) station is composed of the following sections: 1. The fuel bunker gallery section, in most cases with the peat- milling or coal-pulverizing installation (central or individual for each boiler); 2. The boiler house; 3. The smoke discharge section (smoke exhaust flues, induced-draft fans; 4. The section of feedwater tanks, feedwater pumps, deaerators etc; 5. The turbogenerator hall and auxiliary equipment. -10- Declassified in Part - Sanitized Copy Approved for Release 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Those sections can be clearly identified on the model of a 5 x 50,000 kw. pulverized-coal station (seo Plate 8) or on the model of a 200,000 kw, peat-firing power plant tees Plate 84. Different arrangements of these sections in relation to each other characterize the specific types of the main building design of thermal- electric power plants. The central point to be considered in a power plant design is the location of the boiler house as the most complex section of the plant. The boiler house can have one or two free side walls - that is, malls that do not adjoin the turbine room or its auxiliary section. Outside a free side wall the designer can place the auxiliary sections of the boiler house, namely: 1. the bunker section (bringing and storing of fuel, and its preparation for burning, i.e. the milling or pulverising equipment) and; 2. the smoke discharge section (smoke exhaust flues, induced-draft fans, smoke stacks). According to the location of the boiler house, the main bui of thermal-power and heat-and-power plants can be classified in four general groups. First Cis.roup 1 In the first group, the boiler house has one free wall, outside of which is the fuel bunker section. In this group, the stacks are in or next to the boiler house; they and the induced-draft fans are set on a high specially-constructed frame, or on top of the frame that supports the feedwater tank, pump, and deaerator section. -n- Declassified in Part- Sanitized Copy Approved for Release @50-Yr2013/ /03 . CIA- - 0 n (-)ni7nnni Declassified in Part - Sanitized Cop Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 . ? ( Second Group The Second Group includes power plants where the boiler house also has one free side wall, with the fuel bunker section adjoiping; however, the smoke discharge installations are separated from the boiler house. Smoke flues are brought underneath the filel bunker section, the induced- draft fans are placed low, on the ground floor, and the stacks are separated frog the main building. Third Group ? In the Third Group, the boiler house-bi-two free side walls, the fuel bunker section on one side and the smoke discharge section on the other. Fourth Group The fourth Group is like the Third Inprinciple, but arranged more compactly, with the fuel bunker section set in a frame common to that of the turbine room. L115-= tc. 4`. Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2 1-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 A The design of each of the groups is based on the general scheme of arrangement of the section* however, within the framework of one group: some individual solutions in the design of the plant are feasible. The first group is the most common, especially in power plants built in the twenties and thirties. Examples of the First Group arrangement are: a. Zayevka 96,000 kw. pulverized-coal GRES (see Plate39 & 9a). b. Kauznetsk 108,000 kw. pulverized-coal heat-and-power TETs. (see Plata 11) c. Stalinogorsk pulverized coal GRES (see Plates 12 & 12a) d. Ivanovo peat-burning GRES (see Plate 7) e. Stalingrad pulverized-coal GRES (see Plate 10) 7%e The layout of the First Group has the drawback that"smoke evminating arrangement is located either totally or partially in the boiler house, and the induced-draft fans are placed at a high level, so that their draft capacity is reduced. In the Second Group design, this problem is solved by bringing the smoke exhaust flues to the lower level and placing the induced-draft fans and smoke stacks outside the boiler house. Examples of the Seeond Group are: a. Nesvetay ?TIES (see Plate 13) b. Stalinak (Mosenergo #11) TETs in Moscow (see Plate 14) The First and Second Groups form the "compact" groupings of the station sections. The Third Group is called the "disjointed design", the boiler house and the turbine hall being in different buildings. An example of this arrangement is the Orsk TETs (see Plate 15). The Fourth Group arrangement is the latest design of the power plant building. Some power plants have already been built according to this arrangement, probably the Cherepwelik GRES; also Miromovsk GRES and Slavyansk GRES. Declassified in Part - Sanitized Copy Approved for Release @ IA RDP81 01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 ? ? ???," Chi END CL:.. ? ? ' EiN.Q .novo I I - 0 0 00 0000000DC=3000 0 0000 ? _r 1-1 0 " c= = 37.?Gorki regional station (plan view). Fig. 1 - Gorikiy Peet-Firing ORES Etc. 38.?Sltatura regional station (plan view). Fig. 2 - Shatura Peet-Firiavarka- ? TBERKAL WAR PLANTS WITH BOILER ROOKS AT RIGHT ANGLE TO =ens HAIL. Source: Weitz, 1. ed. Xaectric Power Developzent in the USSR, 1936. TIO95.E6. FIATS ii.. Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 ? / Wt. Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 88.4" ?tuc_ ? L/61.0' ? Al.3. ' 24z. 0' 2 .48. :00 ?13 ???????? ????? ? IP att 1.0 1111 tAVII .90. o' 4130 I JS.18,1 //a. 5' Nn.4 .9 0.0 1 - Peat car; 2 - Steel peat bunker; 3 - Peat chute to the furnace vell; 1 - Furnace well; 5 - MiChanical Chain grate; 6 - Furnace; 7 - 3-druavater-tUbe boiler, capacity - 135/160 t./h.; 8 - Water economizer; 9 -Air preheaterl 10 - Smoke-ekhaust fan (induced draft); 11 - "broad draft fan; 12.- Stack; 13 - Alb and cinder bunkers; 14 - Feedwater pipeline; 15 - Steam pipeline; 16 - Stem turbine, capscity-50,000 kw.; 17 - Condenser; 18 - Three-phase generator; 19 - Crane bridge; 20 - Mechanical filter mesh; 21 - Circulation pumps; 22 - Water in; 23 - Drainageelannel; Feedwater tanks. DUBROVICA PUT - FUND GAMS. Source: Weitz, b. Electric Power Development 1936. Tg5. E60 1936. Antipov, I. P. Arkhitekturs elekrostantsiy, 1939. TH4581. AS. Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03 : CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release . 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release . 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 ? ? I. cletwo Vain9eteAWav f a e 9?41Aryto.dos 1P-1 1 a ? .1. nt ,?? ? 4 1; ?/ .b. ,.. - ..-1, ? / . ? .1 i. . ' 6 ( ? UE1E911 ? (141t ? , 1 4 ? C-1=P s 4. / ? ? 4,? ? ,,,,,z0.410=2.41sw r- 4V--147 IMAH CTAHU,HH I' 'I I I SS II --H.S. I 1.I 11.1. lin. )1.11111111110,6 s I IS is Hils 1...I.II Pot. y1110.1 ILI. II 11.I. III Is 1I.lIlI Ii I. NJ I ?II1e.1M it I Iv? ;It M. I .1 II I:tIiIII 1..1 fl ?I ? I% .I.. (.11 l?it ii. %tIItL. 1 II 11 II ILI.% II% iii I. I H.. v. liiiII II.? I; 11 MIS .1111. S' )6 IPS ii Gle( 61 lo II I .1 fttli?It.I.II ilti 1;1 .111 1..xl? limo ilia ii II Up:Milo 1.11 liflill 5 II. M. III. II I ..\.1:1.1. IPA 11.? Plan. of DoWep vlant. 1. Boiler house 2. Pump section 3. Turbine hall 4. Control section 5. Reserve transformers 6. Oil section 7. Work shop 8. Service quarters 9. Accumulator section 10. 6,600 Volt distributing installation U. Locker room for workers 12. Circuit breakers 13. Transformer section 14. Cooling section .1 SHTEROVKA PULVERIZED COAL?FIRING GRES (Capacity: 152,000 kw.) Source: Stroitelinaya Promyshlennosti, 1924, #4, p. 243. PLATE 6) -17- Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 ? ? ? .98. 1.9.2 -.115000 i ? ? ? ? ? ? ? r- ; LU I LJJ ? ?-114 ?-? ? ? 4-4-+ ?-? 4-? ?-4-+-4l =1- f=) ? 4- 4.9.2' 49..2' $000 /GA IF-7 //C. 0 L.,15.30 1000 /a,..y.?3e*c /27.0 / I \ '!"'t ? rtH 65 ' 4. 23.o' i oc0 I ^ ... . /6.6 9.7' r4600 6000 --????"?`--- $ 63.0' -- -MA* ? t?:--1-2.3 Main building, section and, plan: 1 -Electric locomotive in the over-bunker gallery; 2 - Peat bunker; 3 - Peat Chute to the furnace; 4 - Mechanical chain grate; 5 - Furnace; 6 -Boiler; 7 - Water economizer; 8 - Air preheater; 9 - Smoke-exhaust fen (induced draft); 10 - Stack; 11 - Forced-draft fen; 12 - Ash and cinder bunker; 13 - Turbogenerator, capacity - 24,000 kw.; 14 - Water Channel and sump; circulation pumps; 15 - Drainage channel; 16 - Crane bridge; 17 - Feedwater tank; 18 Feedwater preheeters; 19 - Boiler feedwater pumps. =Imo PEAT-FIRING GRES Source: Antipov, I. P. and S. S. Bakita. Arkbitektura elektrostantsiy, 1939, T84581.0. Weitz, B. ed. Electric power development, TE85.E6 1936. PIA TE Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 ? ? ? do".A 1. Bunker gallery 2. Boiler house 3. Induced draft fan gallery I" Pule gallery 5. Turbine hall 6. Catwalk NOMA Cl' A 5 x 50,000 kw; PULVZRXZID-CpAL-YIRIIKI GRES. (Section through the Main Power Plan Building.) Source: Antliow4 I. 10. sad S. S. Rakita, ArIchitekturei ElektrostantsiV, 1939 M4581, A5. - PLATZ Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 ,?? ?"1f., - Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 oint?iff wnix 49 Cross aection through the boiler house and the bunker gallery. The feed pump and tank section and the turbine hall are not shown - they adjoin the boiler house to the right. ZUSVICA 200,000 kw PDLVERIZED-G0A14 GRES Elektroenergetika SSSR 1934 p. 68 TIC 1193 R9 R4 Declassified in in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 ? ? I ? ? OW. FIN;04S.." A.pr4,,?-' /-? 1,4 ? catet - . ? ? .o, . 0 C . ? V._ Cross section through the boiler house and the feedvater pump and tank section. The bunker section is to the left of the boiler house and the turbine hall to the right of the feedwater pump and tank section. ZUIE'VKA 200,000 kw PULVERIZED-COAL ORES Source: Elektroenergetika SSR 1934 p. 68, Tk 1193 R9 E4 PLATE 9A. -22- Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 ? v 4 1 4 .i ap .. ? i 1 4 g H 'A P t M?i X 14* ID 1 i ,4 r . 14 4 41 1 4" r" 443 kg1 4 ti!eilli il i40.4.1 i cf.,i C13 v 1182411H idlildil fl. IE .m ,--14 ,A4..;.dtztzat.4 ? :43. ?? ? tri .4 .. 9, tri ? r tp, N .a .4 g, tr ?rf +1 4; - I. . -.23? ? Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Section through the main power plant buildinf. Smoke-discharge section is part of boiler house with exhaust arrangement in upper part of structure. Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 -^ -- 1 9 - --9- -4? ?4- -91- - ? 9.- .1.-? ? -I - --e- -t---It- . 1 1 i?e?i '-I ?-t?i?s- 3'. ? -11. 9 9 ? 9 - 9 - 9 s 9 9 6 I -, 011's e 14 a i 11[ ' 1 4/. _m.=-Alinr.1.11.A 4 1- , ? LEGEND: PLATE 11 ? a -77--7A 1 Li4aEliD ?LATE 11A. 1. Bunker section. 2. Boiler house. 3. Feedwater pump and tank section. 4. Turbine hall. 5. Switch boards. 6. Service accommodations. 1 - Belt conveyers; 2 - Raw coal bunker; 3 - Automatic scales; 4 - Ball mills; 5 - Dust remover conveyers; 6 - Worm dust conveyers; 7 - Pulverised-coal burners; 8 -Worm conveyer feeders; 9 - Pulverized-coal burners; 10 - Furnace; 11 - Boilers; 12 - Air preheater; 13 - Ash intercepting cyclone; 14 - Induced-draft fan; 15 . Stack; 16 - Fbrced-draft fan; 17 - Cinder bunker; 18 - Ash bunker; 19 - Steam lime to the engine room; 20 - Steam turbine; capacity - 24,000 kw. 21 -.Condenser; 22 -Water outlet lines; 23 - Crane bridge; 24 - Station distributor; 25 - Peedwater tanks; 26 - Feedwater preheaters; 27 - Boiler-feedvater pumps; 28 - Feedvater lime; 29 - High pressure heaters KUZBETSK PULVERIZED-COAL TETs OF THE METALLURGICAL PLANT. Source: Antipov, I. P. Arkhitektura Elektrostantsiy. 1939. p. 177. TB 4581.A5. PLOP, 11.A. Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 sk.) ? 69. ? ? 10 -44-1-44.0.4.14c714: 4.0 1 I it ,OT?F? 10 11 I 1? ???? 41' 0)-1' 5?A4 raja ,.3D0 3 ? 27.2 z, COO . 11 - . ? I ? ....N.."... 4 - 7000 - aa.s - :,0co . 72 r ? 64 61700 44. ii???? 47000 Section through the main plant building. KUZNETSK PULVERIZED-COAL HEAT-AND-PCWER STATION TEM PLATE U. 3 1-m-limeik-m-a -a-a :4 $ Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 _ r?.) 1 - Coal-crushing installation; 2 - Coal-bunker section; 3 - Boiler house; 4 ?Water tank and pump section, with smoke exhausts and stacks are installed above; 5 - Turbine hall. PLATE 12a: STALINOGORSK PULVERIZED-COAL GRES General layout of the power plant building on the bunker side and coal conveying and crushing installations. Source: Weitz, B., Electric Power Development in the USSR, 1936 TK85.E6, and Antipov, I. P. Arkhitektura elekrostantsiy, 1939. TR4581.A5 LENGEND: PLATE 12 6 - Ball mills; 7 - Pulverized-coal bunker; 10 - Boiler room; 11 - Boiler-feedwater pump; 12 - Switchboard; 13 - Water tanks; 15 - Induced-draft fan gallery; 18 - Steam turbine; 19 - Circulat- ing pump; 21 - Control room; 22 - Switching and distributing installation. Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release . 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 ?????? Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release . 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 -30- ? ? Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release . 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 ?C ?? ? ???? ? ? t ?-- '? ? - i - E - .; : : ?:? V-- : - : C-- let- ? - - ? ?7H 1.4:9 elt 121., 1.99 9 9 9 4-.?F .1 r? r--- , IL. ? 13623 ? .? t- - ? -It ? ' 1 . ? (Mir ---:1E7 ; -?- ? - , .1": - s L &Leo T? H32 em WO 7541070.1-r 113J0 WOt 8310 -r -r 44.7 1113 ?-? Skli (CA eoaxel ? 11 ".. ; ft Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 Declassified in Part - Sanitized Copy Approved for Release ? 50-Yr 2013/09/03: CIA-RDP81-01043R002500170001-1 , tr."=;=? \S) ? VI ???-?1. ? 2 , ?1 ? te77-4. C ? ? ? t'4: J P, .. ? cv 0 LL r3I ? " ? g ? ;41 -r t, ' .1 ? . !To - t - 12 0 't