1. RECTIFIER PRODUCTION, ZAVOD 659, SVERDLOVSK 2. OFFICE FOR DEVELOPMENT OF ELECTRIC RECTIFIERS, OBERSCHOENEWEIDE, GERMANY OCTOBER 1946 TO JUNE 1952

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP81-01030R000100330001-3
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 27, 2016
Document Release Date: 
July 24, 2013
Sequence Number: 
1
Case Number: 
Publication Date: 
December 3, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP81-01030R000100330001-3.pdf92.72 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2013/07/24: CIA-RDP81-01030R000100330001-3 ?i CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT 50X1 SECRET SECURITY INFORMATION -HUM ? COUNTRY USSR/Germany (Soviet Zone) REPORT' 50X1-HUMr SUBJECT 1. Rectifier Production, Zavod 659, DATE DISTR. Sverdlovsk 3 December 1953 2. Office for Development of Electric Np. OF PAGES 4 50X1-HUM DATE OF INFO. Rectifiers, Oberschoeneiride, Germany REQUIREMENT PLACE ACQUIRED REFERENCES 50X1-HUM THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OF CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) 50X1-HUM 50X1-HUM SECRET - STATE x# ARMY NAVY x# AIR 4 AEC 051 ev (Note: Washington Distribution Indicated By "X"; Field Distribution By "# ".) -- Declassified in Part - Sanitized Copy Approved for Release 2013/07/24: CIA-RDP81-01030R000100330001-3 Declassified in Part - Sanitized Copy Approved for Release 2013/07/24: CIA-RDP81-01030R000100330001-3 50X1-HUM E.4 R E T SECURITY INFORMATION COUNTRY USSR/Germany -HUM 1111 50X1 -DATE DISTR. a2OCc.67:-..5-: (SovZone) SUBJECT s 1. Rectifier ProduCtion at Bavod 639,S4eid1ovsk NO. OF PAGES 3 2. Production at and -Administration of the Office PLACE ACQUIRED for 'Development .of Electric Reotitiets ticheeneweide. Germany , ?beraNO. OF ENCLS. (LISTED BELOW) , 50X1-HUM DATE SUPPLEMENT TO ACQUIRED REPORT NO. DATE OF INFORMATION THIS IS UNEVALUATED INFORMATION 50X1-HUM z. Ro"prierities ever existed! .Rectifiers Were part of the regular day-to-day 'production. - E CtR E T SEC.U1ITY 'INFORMATION Declassified in Part - Sanitized Copy Approved for Release 2013/07/24: CIA-RDP81-01030R000100330001-3 F' Declassified in Part - Sanitized Copy Approved for Release 2013/07/24: CIA-RDP81-01030R000100330001-3 r 6 7 8 9 10 ?-e$E-CRET 2 - 50X1d-HUM Approximately 50 per cent of the rectifiers were used for rail- way electrification in the Urals, the Caucasus, and the Moscow metro. These were of the 3300 volt type. The other 50 per cent were used by electrolytic plants. Large aluminum plants were located at Zaporozhye on the Dnieper and at Murmansk. The latter was completed about 1951 after it had been under construction for about two years. A zinc plant was located at Chelyabinsk. There were two copper refineries near Sverdlovsk. A Yew rectifiers were also sent to address, out the destination another and number is not known . These were of the low-voltage higI50 current (1 . e . , . e le ctro lysis ) type. This shipment constituted no special order, but was considered 41qutine. . No purchasing representatives ever came to Zavod 659. Government representatives from MosCow visited the plant two or three times per year. The purpose usually seemed to be to discuss material shortages. production problems, etc. Most of the copper was obtained locally--very pure copper was procured from Moscow. A lowzgrade porcelain came from about 100 kilometers from Sverdlovsk LKomissulaphonetig. A better grade came from Leningrad. Insulating Materials were made at Zavod 659. Mercury was obtained from the Ural region. Relays and contacts were shipped from Kuybyshev; condensers and thermocouples, from Moscow. ' SECRET Declassified in Part - Sanitized Copy Approved for Release 2013/07/24 : CIA-RDP81-01030R000100330001-3 X1-HUN -so ? Declassified in Part - Sanitized Copy Approved for Release 2013/07/24: CIA-RDP81-01030R000100330001-3 114 SECRET -3- The name of the office for: the development of electrical ;rectifiers, OberschoenewAidA lInn.bnen chAnand tn Rlnktro APparat Werk-TrePtow? the 50X1-HUM plant made a single-poti'six-anode, air-cooled rectifier. One type operated at 3000 volte and 500 amperes, another at 800 50X1-HUM volts and 1200 amperes. These were sold to the USSR, Poland and Czechoslovakia. . annual production was approkimately 100. Toward the end of 1946 a single-pot,-?singleoanode, air-cooled, 800-velt1.5000- ampere unit was made for.the Moscow metro. These Were Operated In groups of six tiOake care of full-wave, three-phase recti- fication. A high-PPtential (180,000 volts, 20 aMptie), 'single- anode, air-cooled type.was made for the high-voltage direct currentitrAnai m sion,line.near Moscow. Forty unite were made. -1 this type Was not made after 1949. In additien to six-hp, three-phase Tectifiers,. 220-volt utility motor's WATO 'built and soleto the USSR in small Quantities. producing rectifiers similar to the B-500. were complaints about material shortages and quality. The plant There was reorganized into the VEB during 1952. In 1946, BERTIROV visited Zavod 659; representing a Soviet ministry. ZIMBONOV, RUBENSTIEN, LIERMARN, and KREMEER ' were employed at Zavod 659 as engineers. ZIMBONOV, a Soviet, wae a good engineer. SECRET Declassified in Part - Sanitized Copy Approved for Release 2013/07/24: CIA-RDP81-01030R000100330001-3 ,