CONSTRUCTION ACTIVITY THAI NGUYEN/KEP RAIL LINE UNDER CONSTRUCTION NORTH VIETNAM

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80T01471R001800120009-2
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
April 2, 2007
Sequence Number: 
9
Case Number: 
Publication Date: 
May 19, 1966
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80T01471R001800120009-2.pdf124.46 KB
Body: 
Approved For Release 2007/04/02 : CIA-RDP80TO1471 8001800120009-2 CONFIDENTIAL (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER ATTACHMENT TO K-9597 19 MAY 1966 PAGE 1 CONSTRUCTION ACTIVITY THAI NGUYEN/KEP RAIL LINE UNDER CONSTRUCTION NORTH VIETNAM 1. SIGNIFICANCE: THIS BRIEFING BOARD DEPICTS CONTINUING RAILROAD CONSTRUCTION ACTIVITY ALONG THE THAI NGUYEN/KEP RAIL LINE. 2. LOCATION: CONSTRUCTION ACTIVITY IS TAKING PLACE ON THE 31-MILE RAIL LINK BETWEEN THE INDUSTRIAL CITY OF THAI NGUYEN AND KEP, FROM 2128N 10611E TO 2131N 1o607E. 3. REMARKS: THIS RAILROAD, WHEN COMPLETED, WILL PROVIDE A MORE DIRECT ROUTE BETWEEN CHINA AND THE THAI NGUYEN IRON-STEEL COMBINE, THEREBY TYING THE ECONOMIES OF THE TWO COUNTRIES MORE CLOSELY TOGETHER. THE RAILROAD WILL ALSO FACILITATE THE MOVEMENT OF COKING COAL FROM COMMUNIST CHINA TO THAI NGUYEN AND PROVIDE AN ALTERNATE TO THE HANOI-DONG DANG LINE, SOUTH OF KEP. 4. MISSION READOUT: REVEALS THE THAI NGUYEN/KEP RAIL LINE UNDER CONSTRUCTION BETWEEN 2128N 10611E AND 2131N 10607E. THE RAIL BED IS IN AN ADVANCED STAGE OF CONSTRUCTION WITH A MAJOR PORTION OF THE GRADING COMPLETED, BUT NO BALLAST OR TRACKAGE HAS BEEN LAID. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. CONFIDENTIAL Approved For Release 2007/04/02 : CIA-RDP80TO1471 8001800120009-2 CONFIDENTIAL (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER ATTACHMENT TO K-9597 19 MAY 1966 PAGE 2 TWO BRIDGES, EACH WITH THREE SPANS, ARE NOTED TO BE UNDER CONSTRUCTION AT 2129N 10610E AND 213ON 10607E (LATTER SHOWN ON GRAPHIC). BOTH BRIDGES HAVE CONCRETE ABUTMENTS AND TWO CONCRETE PIERS IN LATE STAGES OF CONSTRUCTION; HOWEVER, THE BRIDGE SPANS ARE NOT IN PLACE ON EITHER BRIDGE. TWO BRIDGES, EACH WITH SINGLE SPANS, ARE OBSERVED TO BE UNDER CONSTRUCTION AT 213ON 10618E AND 2129N 10608E. BOTH BRIDGES PRESENTLY CONSIST OF ONLY LARGE CONCRETE ABUTMENTS AND TEMPORARY CONSTRUCTION ACCESS BRIDGES. FORMS FOR POURING CONCRETE ARE ALSO NOTED. CONSTRUCTION MATERIAL IS OBSERVED STACKED IN THE IMMEDIATE AREA OF BOTH BRIDGES AND NUMEROUS HAND CARTS ARE LOCATED NEARBY. AT LEAST TWENTY COMPLETED CULVERTS/SMALL BRIDGES AND NINE CULVERTS/SMALL BRIDGES UNDER CONSTRUCTION ARE OBSERVED ALONG THE THAI NGUYEN/KEP RAIL LINE BETWEEN 2128N 10611E AND 2131N 1o607E. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. CONFIDENTIAL Approved For Release 2007/04/02 : CIA-RDP80TO1471 8001800120009-2 TRIPLE-SPAN BRIDGE U/C 11111111110101121-30N 106-07EW11111111111111111111 2~, A EN IA RGEM EN I" CONSTRUCTION ACTIVITY THAI NGUYEN/KEP RAIL LINE UNDER CONSTRUCTION NORTH VIETNAM 25X1 25X1 HKI