FORD UNDER CONSTRUCTION ROUTE 9 TCHEPONE AREA LAOS 16-42N 106-13E
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80T01471R000400050006-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
4
Document Creation Date:
December 28, 2016
Document Release Date:
June 5, 2007
Sequence Number:
6
Case Number:
Publication Date:
February 10, 1965
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP80T01471R000400050006-8.pdf | 121.88 KB |
Body:
Approved For Release 2007/06/05: CIA-RDP80TO1471 R000400050006-8
FORD UNDER CONSTRUCTION, ROUTE 9
TCHEPONE AREA, LAOS
Copy
Approved For Release 2007/06105: CIA-RDP80TO1471 R000400050006-8
REPRODUCTION OF THIS DOCUMENT IN
WHOLE 01 IV ZAT IS PROHIBITED
EXCEPT WITH THE PERMISSION OF THE
OFFICE OF ORIGIN.
.T-71758
CSD/NPIC 63/65
10 FEBRUARY 1965
PAGE /
COPY
FORD UNDER CONSTRUCTION, ROUTE 9
TCHEPONE AREA, LAOS
164+2N 1o613E
(SEE NPIC BRIEFING BOARD J-7+06 FOR COMPARISON)
FIRST REVEALED DAMAGE TO
VH22 EASTERtiYIOST SPAN OF THE FOUR-SPAN, HALF-THROUGH, STEEL-TRUSS ROUTE
9 HIGHWAY BRIDGE OVER THE SE BANG HIENG (RIVER) 1.4 NM NORTHWEST OF
TCHEPONE, RENEERING IT IMPASSABLE TO VEHICLES.
REPORTED THE SPAN TO BE
PARTIALLY COLLAPSED. FLOODING ACTION WAS APPARENT ON BOTH BANKS OF
THE RIVER, AND TIERE WAS NO INDICATION OF ATTENPTS TO FORD THE RIVER.
REVEALED A NEW ROAD BY-
PASS APPROXIMATELY 0.2 NM EAST OF Tim' BRIDGE, WHICH CONNECTED ROUTE 9
WITH THE PARTIALLY-COLLAPSED SPAN I. TIE BRIDGE APPER~ TO BE SERVICE-
ABLE FOR VEHICULAR TRAFFIC.
4. I_J`rEAL A
NEWLY-IDENTIFIED S' :'_I = NECTING THE COLLAPSED SPAT 4 ITH ROUTE 9.
NO BOMB DAMAGE W.., ~RVED .
25X1 ?
51 SEALED THE 25X1
SR, ;N ADJACENT TO VIOUS~~ DAMAGED SPAN TO :v SOLI ~P SED INTO THE
SE BANG HIENG (RIVE ' . ~ ~T OF BOMB DAMAGE, RENDERING THE BRIDGE
UN: V;:CE I,E . S ALSO DESTROYED. SIX BOMB CRATERS WERE
OBSERV:~~D I.l' IRE AREA.
These notes have been preporco for briefing purposes only and should not be used for beta cc anaryncal wor.
?
Their use shone be restricted to me particular briefing boord(s) they were prepared for and must be considered solo
only for the report ng period as indicated by the date of issue.
Excluded from automatic
downgrading and
dsclaultlgtlnn_
Approved For Release 2007/06/05: SECRET 7014718000400050006-8
SECRET
tl 25X1
Approved For Release 2007/0
J-7'58
CSD/NPIC 63/65
PAGE Z
6. THIS N"ISSION, REVEALS A NEW
FOND BEING CONSTRUCTED 0.1 NM NORTH OF THE DESTROYED BRIDGE, THE FORD,
PROBABLY CONSTRUCTED OF PLANKS OR LOGS, APPEARS 30 PERCENT COMPLETED.
APPROACH ROADS ON BOTH SIDES OF THE RIVER CONNECT THE FORD WITH ROUTE
9. NO APPARENT CHANGE IS OBSERVED AT THE PREVIOUSLY DESTROYED BARRACKS
AREA LOCATED 0.2 MIA, NEST OF THE BRIDGE.
7. AREA HAS BEEN PREVIOUSLY COVERED BY NUMEROUS LUCKY
MISSIONS.
DRAGON, TROJAN HORSE
=REARED BY : CSD/NPIC
DISTRIBUTION:
Copy 1 - DIRECTOR, NPIC
2 - ASST FOR OPS
3 - CHIEF REF CSD
~8 - NSB/RB/CSD
9 - CHIEF, RAS/CSD
4 - DIA
5 - TCO/
67-PID
only for the reporting period as indicated by the data or Issue.
These no-as have been prepared for briefing purposes only and should not be used for detailed analytical work.
.L._ ...eie.ler briefing board(s) they were prepared for and must be considered valid
SIC-R9
?
?