PLANNED ADDITION TO REFRIGERATION PLANT IN GDYNIA

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80T00246A050200400001-9
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
10
Document Creation Date: 
December 22, 2016
Document Release Date: 
October 20, 2010
Sequence Number: 
1
Case Number: 
Publication Date: 
August 21, 1959
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80T00246A050200400001-9.pdf450.33 KB
Body: 
Sanitized Copy Approved for Release 2010/11/04: CIA-RDP80T00246A050200400001-9 CENTRAL INTELLIGENCE AGENCY C-O-N -F-1mUmE-N'-T.nr-A-L COUNTRY Poland SUBJECT Planned Addition to Refrigeration Plant in Gdynia REPORT DATE DISTR. NO. PAGES 1 DATE OF FIELD REPORT NO. SOURCE EVALUATIONS ARE DEFINITIVE. APPRAISAL OF CONTENT IS TENTATIVE. 50X1-HUM la report containing information on the planned addition to a refrigeration plant in Gdynia. The plant is located on the pier used by the fishing fleet. 50X1-HUM CaCm?VI-F ?1-P-E-N-T-?_A-L #XIARMY NAVY A1R IF 131 Washington distribution indicated by "X"; Field distribution by "#".) Sanitized Copy Approved for Release 2010/11/04: CIA-RDP80T00246A050200400001-9 Sanitized Copy Approved for Release 2010/11/04: CIA-RDP80T00246A050200400001-9 CONFIDENTIAL THIS IS UNEVALUATED ADVANCE I1)RMATION PLANNED ADDITION TO REFRIGERATION PLANT IN GDYNIA, POLAND (C) Summary: This.report gives details of a planned :expansion of a refrigeration plan.. in the Polish port. of GDYNIA. It also gives details of the existing building-and other facilities on .the same pier. CONE/DENT/AL Sanitized Copy Approved for Release 2010/11/04: CIA-RDP80T00246A050200400001-9 50X1-HUM Sanitized Copy Approved for Release 2010/11/04: CIA-RDP80T00246AO50200400001-9 Sanitized Copy Approved for Release 2010/11/04: CIA-RDP80T00246AO50200400001-9 Sanitized Copy Approved for Release 2010/11/04: CIA-RDP80T00246AO50200400001-9 CON FIDENTIAL PLANNED ADDITION TO REFRIGERATION PLANT IN GDYNIA, POLAND (C) Listed below are the requirements keyed to the page on which the answer Pare Nr A. Details reconstr and reorgn tank-farm (give dimensions, capacities ...3 and locations tanks) and planned refinery on west bank Vistula River. Give details pr9ducts stored, pipeline layout and transfer.berths. Details attempts to reconstr collapsed quayage this port. ...3 Details 5 story refrigeration plant north of Danzig constr in 56. ...1~ Give dimensions and capacities. D. Details wooden pier at which vegetable oil is unloaded. ....3 "E. Condition grain storage bldg on west side Holm Island. Give details ...3 handling equip.capacity. F. Dimensions area behind coal quay .3 B. C. east bank Vistula River. H. Capacities pontoon (2), highway (1) and rail highway (1) bridges connecting west and south sides Holm Island with west bank Vistula River. known to.be site dump for coal b Bring station. G. Capacity.-railway ferry which runs between SE and Holm Island and ...3 ???3 1. Details planned straightening and widening of the acute channel ...3 turn at NOWY PORT. Give plans tostraighten Vistula River by new channel through Westerplatte Peninsula. Locate new channel and give dimensions and connections. Describe proposed use in relation to NOWY PORT and Westerplatte Basins. J. Info on exact depth each portion Danzig harbor where Vistula and ...3 Motlawa Rivers have deposited silt and reduced depth. 'What dredging opns are in force and what is planned? K. Details any,permanent bridge (in existence or planned) connecting ...3 Wyspa Holm with mainland. Give location and evidence of type (approaches, abutments, and if now under constr, stockpiling of bridge structural members at crossing sites). CONFIDENT/A L Sanitized Copy Approved for Release 2010/11/04: CIA-RDP80T00246AO50200400001-9 Sanitized Copy Approved for Release 2010/11/04: CIA-RDP80T00246AO50200400001-9 -3- B. CONE/DENT/AL there is a very large firm in that produces vegetable oil that is distributed over the entire nation. This is a large firm and has extensive facilities. E. there is a very large grain elevator on the southeast corner of Holm Island, 50X1-HUM There is also a grain e evator in Ton the west bank of the Visti??-'. F. on Holm Island- a so port area. I. J. a coalstorage__srea (Basin Weglowy na Holmie) a coal storage area in the GDYNIA 50X1-HUM no railway ferry going to Holm Island. no pontoon bridge to Holm Island. There is one bridge going to Hoim Island, CONFIDENTIAL Sanitized Copy Approved for Release 2010/11/04: CIA-RDP80T00246AO50200400001-9 Sanitized Copy Approved for Release 2010/11/04: CIA-RDP80T00246AO50200400001-9 CONFIDENTIAL -4- PLANNED ADDITION TO REFRIGERATION PLANT IN GDYNIA, POLAND (C) refrigeration work. / this wo wr as one by a section. of the Gdansk_Maritime.Construction Bureau which handled all 1. Proiect a three-story addition to be built onto an existing four-story refrigeration plant on the pier at GDYNIA used by the local fishing fleet. The pier had two refrigeration plants, both reinforced concrete structures built in the 1939's and considered quite modern at that time. They 50X1-HUM appeared to have been built with provisions for expansion, brit they did not lend themselves to current construction methods Although the refrigeration plant was out of date, the new addition had to be designed to. conform to the older methods. In making the plans, the personnel of the Gdansk Maritime Construction Bureau mostly, therefore copied from the original lane.. 50X1-HUM Because the new building was to use relatively old construction methods, the personnel doing the work, since they had no experience with the older techniques, would have trouble following the construction methods planned. special problems with the stairway, which was not inside the building as in most current Polish construction., but was to hang on the outside. 50X1-HUM This refrigeration plant was on the pier which served the fishing fleet at UTM coordinates CF 420447. 2. Location of the Refrigeration Plant there was one main paved road down the center of the pier, and the areas on each side of.the pier were generally built up. Other than the two refrigeration planta no buildings of any size, but the_pier had many smaller buildings on it. A railroad spur was beside the refrigeration plant for which the addition was planned. There were other spurs on the pier running beside other buildings. CONFIDENT/AL Sanitized Copy Approved for Release 2010/11/04: CIA-RDP80T00246AO50200400001-9 Sanitized Copy Approved for Release 2010/11/04: CIA-RDP80T00246AO50200400001-9 CONFIDENTIAL -5- The refrigeration plant for the addition was quite a bit.sm_aller than the other, which was about 10 stories high and was the main plant. It contained offices as well as refrigeration facilities. (See Annex A, sketch of the pier.) 3. Details of the Refrigeration Plant and the Addition a. Existing Structure This building was of reinforced concrete, 4-stories high, and generally had on each floor one large refrigerated room surrounded on all four sides by an unrefrigerated hallway. The large refrigerated roomabout 39 m by 40 to.. had a number of reinforced concrete columns in its but no permanent walls dividing it into smaller rooms. Some of the large rooms were divided into smaller parts by uninsulated brick walls, which were not part of the permanent construction but were movable. The reinforced concrete pillars were about 35 cm on a side. On the main floor the columns were larger, about 40 cm on a side. Along the surrounding corridor there were doors leading into refrigerated room, of steel with insulation on the back. the they were about 1.5 m wide, wide enough for small carts to get through when carrying a load. there were windows on the exterior 50X1-HUM The cooling equipment was not located in each room', but either in the basement or on the main floor. The temperature in each room could be regulated independently, in accordance with the season of the year, the type of fish stored, and the length. of time they were to be stored. b. Proposed Addition. 50X1-HUM The proposed addition consisted of three-stories to be built on top of the existing structure, to which it was very similar in design. The square reinforced concrete columns which were to be built as part of the addition were to be smaller than the columns in the existing part, 25 cm on a side instead of 35 cm. The planning of the refrigerating equipment was handled by-,a section of the Gdansk Maritime Construction Bureau which specialized in refrigeration planning. See Annex B for a sketch of the refrigeration plant with its proposed addi on and Annex C, which shows cross-sections of the insulating walls for the addition.) CONFIDENTIAL Sanitized Copy Approved for Release 2010/11/04: CIA-RDP80T00246AO50200400001-9 Sanitized Copy Approved for Release 2010/11/04: CIA-RDP80TOO246AO50200400001-9 ANNEX A SKETCH OF FISHING FLEET PIER IN GDYNIA, POLAND Larger of the two refrigeration plants on the fishing pier. This plant was approximately 10 stories high and was about four or five times as large as the other refrigeration plant. This building contained offices as well as refrigerated storage areas. This pier was located at UTH coordinates CF 420447. Refrigeration plant for which addition was planned. This was the smaller of the two refriger- ation plants on the fishing pier. Railroad spur which ran beside the refrigeration plant. There were other railroad spurs on the pier. This r d ran generally down the center of the pier; there were built-up areas on. both sides of this road, although there were no other buildings as large as the refrigeration plants. Sanitized Copy Approved for Release 2010/11/04: CIA-RDP80TOO246AO50200400001-9 Sanitized Copy Approved for Release 2010/11/04: CIA-RDP80T00246AO50200400001-9 50X1-HUM CONFIDENT/AL 7- ANIPEK B 50X1-HUM SKETCH OF REFRIGMATION PLANT AND PLANNED ADDITION ON FISHING PIER IN GDYNIA, POLAND -5O m 5m j- u 0 0 I 0 a 11 0 0 ^ 0 0 a 0 0 ^ ^ O ^ 6 O D a 0 0 a 0 O 0 Q a O r1l ri i n rl n ri 3vh f7 n SECTION A-A 6m EM Stairway -0---1Levator Shaft Planned Addition ^,25M k ti45M CONFIDENT/AL Sanitized Copy Approved for Release 2010/11/04: CIA-RDP80T00246AO50200400001-9 Sanitized Copy Approved for Release 2010/11/04: CIA-RDP80T00246AO50200400001-9 CONFIDENTIAL .8_ ANNEX 0 SKETCH OF INSULATED WALLS FOR PLANNED ADDITION TO 25 - 38 cm REFRIG RATION PLANT IN GDYNIA, POLAND tor ..~ ~ , ~ -- Air Space Bri4k b,- S I Malls with across section like this were to be used for the parts of the addition requiring most insulation. These cross sections show the two types of walls used for insulation. The thicknesses of the different layers sometimes varied, according to the temperature for which the room was designed. Stucco Walls with a cross section like this were to be used for parts of the addition requiring less insulation. CCNFJDENTJAL Sanitized Copy Approved for Release 2010/11/04: CIA-RDP80T00246AO50200400001-9