ACTION PROGRAM (AKTIONSPROGRAMM) OF THE AIRCRAFT INDUSTRY (PLANS AND PLAN FULFILLMENT)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80T00246A045800160001-6
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
6
Document Creation Date:
December 22, 2016
Document Release Date:
June 11, 2010
Sequence Number:
1
Case Number:
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP80T00246A045800160001-6.pdf | 312.81 KB |
Body:
Sanitized Copy Approved for Release 2010/06/11: CIA-RDP80T00246A045800160001-6
INFORMATION REPORT INFORMATION REPORT
CENTRAL INTELLIGENCE AGENCY
This material contains information affecting the National Defense of the United States within the meaning of the Espionage Laws, Title
18, U.S.C. Secs. 793 and 794, the transmission or revelation of which in any manner to an unauthorized person is prohibited by law.
COUNTRY East Germany
SUBJECT Action Program (Aktionsprogramm) of DATE DISTR.
the Aircraft Industry
~...f~ NO. PAGES
REFERENCES
DATE OF
INFO.
PLACE &
DATE ACQ
SOURCE EVALUATIONS ARE DEFINITIVE. APPRAISAL OF CONTENT IS TEN-
TATIVE.
A
eproucti
of ~_..
consumer goods by the aircraft industry and the implementation of the
Law for the Perfection and Simplification of the Work of the State Apparatus
(Gesetz zur VBrvollkommnung and Vereinfachung der Arbeit des Staats-
apparates in der DDR).
three objectives is given below. Objectives 4 and 5 concern +1,
d
five
major objectives of the industry ur ng Discussion of the first
1. Makeup for plan lags in production and in research and technology
overfulfillment of all parts of the plan
In view of the fulfillment status as of 30 April, every effort must be
made within VVB Flugzeugbau to make up all production plan lags by
30 September 1958. In addition, the individual plants have pledged to
exceed the plan by the end of the year by the following amounts:
Plant 801 3,000,000 DME
Plant 802 1,750,000 DME
Plant 804 500,000 DME
Plant 805 1,120,000 DME
Plant 806 20,000 DME
Plant 8071 660 000 DME
Pledges for additional 2,780,000 DME
production of consumer
goods by all plants
Fulfillment of gross production as of 30 April 1958 was as follows:
STATE x IARMY IX INAVY Ix lAIR
(Nob: Washington distribution indicated by "X"; Field distributi
lX 81
on by "#".)
AEC
Q
Sanitized Copy Approved for Release 2010/06/11: CIA-RDP80T00246A045800160001-6
Sanitized Copy Approved for Release 2010/06/11: CIA-RDP80T00246A045800160001-6
S-E-C-R-E-T
VVB2 total
Plant 801
Plant 8o4
Plant 805
Plant 806
Plant 807
Fulfillment of Fulfillment of the
the Plan for the Annual Plan for 1958
Period 1 Jan
MILL 58
79.9 percent 24.3 percent
83.9 percent 25.1 percent
49.1 percent 15.5 percent
104.0 percent 30.9 percent
92.8 percent 27.8 percent
97.3 percent 29.9 percent
Nonfulfillment of the plan for the industry as a whole is due primarily to the lag
in the production of propulsion units (Triebwerksfertigung) at VEB Industriewerke
Karl-Marx-Stadt (IWK), which in turnhas adversely affected output at VEB Flug-
zeugwerke Dresden. The plan lag at Plant 807 is due to production difficulties in
connection with propulsion unit 014. The following pledges have been made for the
fulfillment or overfulfillment of the production plans:
VEB Flugzeu.gwerke Dresden
1. Achieve a seven-day head start (Vorsprung) in all main construction. groups
(Hauptbaugruppen) in order to complete one IL 14 above the plan by the end of
the year.
2. Reduction of the reject rate by 1.2 percent in 1958.
VEB Industriewerke Karl-Marx-Stadt
1. The following program has been worked out for making up plan arrears and for
fulfilling the 1958 production plan:
a. Make up plan arrears by 30 September 1958 in accordance with the operating
plan (Operativplan) which has been drawn up.
b. Fulfillment of the 1958 plant plan (Betriebspi.an.) by 24 December 1958.
c. Scheduled completion of equipment (Geraete) for aircraft 152.
2. Improve the quality of engine Ash 82 T and increase the life expectancy to 750
hours, with the goal of delivering engines with a life expectancy of 750 hours
beginning in the second quarter of 1959.
3. The technical director has pledged to complete all type test runs (Muste ruef-
'laeufe) and type tests of licensed construction (Nachbaumusterprae.fungen)
for all equipment (Geraet) of the IL 14 aircraft. Of importance in this
connection is the completion of the type test (Nachbaumusterpxu;e_fung) of the
Ash 84 T engine, construction phase (Bauzustand) 5.
VEB Maschinen- and Apparatebau Schkeuditz
1. Complete the government aircraft (Regieru.ngsmaschine) and turn it over to the
Flugbetrieb on 15 July 1958 instead of 15 September 1958 as contracted.
2. Deliver two additional IL 14 tail-units (Leitwerke) so that VEB Flugzeugwerke
Dresden can meet its obligations.
3. Deliver three additional sets of Bestuhlungen for the IL 14 by 15 July 1958.
Sanitized Copy Approved for Release 2010/06/11: CIA-RDP80T00246A045800160001-6
Sanitized Copy Approved for Release 2010/06/11: CIA-RDP80T00246AO45800160001-6
4. Rebuild by 15 July 1958 one AN-2 for Deutsche Lufthansa for conducting
sightseeing flights, (Rundfluege' _) .
5. Fulfill the annual plan for 1958 by 20 December 1958.
6. For 1959: increase production by about 30 percent; improve working methods;
reduce the time required to repair the IL 14+ from 73 days to 58 days; and
lower by 10 percent the number of hours required for each repair.
VEB Indu.striewerke Ludwigsfelde
1. Complete the first TL 014 engine by 31 May 1958, and deliver the second
engine ready for the test stand (prs:efstandsreif) by the time of the Fifth
Party Congress.
2. In order to make up for the delay in technological preparations for t::e
prototype series (0-Serie) of the TL 011, tecs~nologic,a.1 preparations are
to be concluded by 31 July 1958 and, in addition, the lag caused by
development work is to be made up so that the objectives set forth in the
state plan can be achieved.
3. Save 360,000 DME in foreign exchange by building own special machinery for
the production of TL 014, thereby insuring the plarx ed start of production.
VEB Kooperationszentrale fuer die FluZz~dustrie
1. Procure 50 percent of the standard parts ordered from domestic suppliers
and from imports by the time of the Fifth Party Congress.
2. Submit 328 items of equipment (Geraete) with complete documentation by
31 December 1958 for type testing.
In the field of research and technology the folllow ing pledges have been made.
VEB Flugzeugwerke Dresden
1. Deliver the "152" V 1 for flight testing seven days ahead of schedule (i.e.,
by 13 August 1958),
2. Complete the "152" V 2, sectional airframe (Bruchzelle), seven days ahead
of schedule.
The plant management collective has pledged to achieve the following goals
for the long-range program (ferspektivprogramm).
a. Completion of the 152 V 4, partially Chemisch abgetragen. and without
equipment (Ausstattu ig), by 31 May 1959.
b. Completion of the 152 V 5, with equipment; by 30 September 1959-
c. Completion of the 152 V 6, completely Chemisch abgetragen (sectional
airframe),'by 31 December 1959
d. Completion of the 152 aircraft No. 8 by 31 December 1959.
e. Completion of the 152 aircraft No. 9 by 31 March 1960.
f. Completion of the 152 aircraft No. 7 by 10 July 1960.
S-E-C-R-E-m
Sanitized Copy Approved for Release 2010/06/11: CIA-RDP80T00246AO45800160001-6
Sanitized Copy Approved for Release 2010/06/11: CIA-RDP80T00246AO45800160001-6
-4-
4. The development of the 153 is to be pushed forward so that the first test
aircraft can be delivered factory finished (hallenklar) by 31 December 1959,
VEB En.twicklungsbau Pirna
1. Deliver four units TL 014 for the 152 V 4 in the fourth quarter of 1958.
2. During the period May to December 1959 deliver another eight units TL 014
to VEB Flugzeugwerke Dresden for flight tests.
3. Complete one TL 014 by September 1958 for testing on the IL 28 airframe.
4. Take all steps necessary to assure that state acceptance (type test) for
TL 014 can take place in June 1959 and for PTL 018 in August 1960.
5. Achieve fulfillment of the parameter weight on the TL 014 in the second
quarter of 1958 and conclude another 150-hour endurance test in the third
quarter of 1958.
6. Complete the plotting of the compressor characteristic curves (Verdichter-
kennfeld) for the multiple-stage phase PTL 018 in the second quarter 1958
and for the full compressor test stand (Vollverdichterpruefstand)in the
third quarter of. 1958.
7. Expedite the activation of the hydraulic brake test stand for the PTL 018
so that work can be started in the third quarter of 1958.
8. Conclude production tests and study of the results of these tests in the
fourth quarter of 1958 with the goal of manufacturing compressor blades
(Verdichterlaufschaufeln) in accordance with the continuous production line
pressing method (Fliesspressverfahren).
9. Complete the component parts for one additional TL 014 by the end of 1958
so that any testing stoppages which may occur can be quickly overcome.
10. Fulfill the research and technology part of the 1958 plan ten days ahead
of schedule.
VEB Apparatebau Lommatzsch
1. Satisfy international requirements in the manufacture of gliders and start
production of the Libelle 15 m and the two-seater (Doppelsitzer) 15 m
cantilever construction by the first quarter of 1959-
2. Make up excess losses in the production enterprises
As of 30 April 1958, plants 801 and 804 had losses totaling 4,300,000 DME in
excess of plan. This alarming figure will require the institution of
extraordinary measures in the series production plants in order to achieve the
planned results for the year. Special emphasis must be placed on reducing
rejects as well as excess work and work done over (Mehr- and Nacharbeit).
As of 31 March 1958, the following amounts(in DM) had been expended inthe
enterprises for extra-plan work:
Plant 801
359,981
Plant 804
1,559,300
Plant 805
89, boo
Plant 806
18, 300
Plant 807
138,100
Sanitized Copy Approved for Release 2010/06/11: CIA-RDP80T00246AO45800160001-6
Sanitized Copy Approved for Release 2010/06/11: CIA-RDP80T00246AO45800160001-6
t program and fulfill the program ahead of schedule
Because of various circumstances and shortcomings, the aircraft industry's
export program is considerably in arrears. The fulfillment status of the
export program as of 30 April 1958 was as follows;
IL 14 75 percent
Ash 82 T 0 percent
Ground instruments 0 percent
Spare parts 75 percent
Remodeling and
repairs to IL 14 50 percent
Marx-Stadt; Plant 805 - VEB Maschinen- and Apparatebau Schkeuditz;
Plant 806 - VEB Apparatebau Iommatzsch; Plant 807 - VEB Industriewerke 25X1
Ludwigsfelde.
Comment: These plants have been identified
Is follows: Plant 801 - VE$ Flugzeugwerke Dresden; Plant
25X1
2 - VEB Entwicklungsbau Pirna; Plant 804 - VEB Industriewerke Karl-
Sanitized Copy Approved for Release 2010/06/11: CIA-RDP80T00246AO45800160001-6
25X1